| 1 | Excavated of drain in both wet & dry condition by means in all kind of soil rough dressing and levelling excavated canal/drain slopes and bed to design section and depositing the excavated material in spoil bank or to any other specified area to proper section with all leads , lift & delift,handling , rehandling and dewatering etc. |
| 2 | Earthwork in slushy soil in water(up to 0.6m depth requiring aid of pan and vessels) with one extra lead of 50m initial lift of 105m to keep the excavated earth in a suitable to dispose by 5km mechanical lead. |
| 3 | Construction of Coffer dam for diversion of water by collecting, supplying and stacking at worksitesand from approved quarry and filling the empty cement bags, sewing in strings and placing in proper position at all heights with all labour welfare , T&P charges ,cost of strings and labour welfare cess etccomplete as per direction of the Engineer-in-charge.(0.0283cum=1bag) |
| 4 | Fabrication and supply of trash rack made out of 75x75x8 mm MS angle in inner design and 12x12 mm square bar mess , conforming to IS:2062/2006 with hold fast made out of MS angle as used in perifery , painted with red oxide primer etc complete including cost of all material as per designed approved by the engineer in charge. |
| 5 | Transportation of fabricated MS gates from work shop to the work site,fitting and fixing at position with drilling hole,using Anchor bolts and chemicals etc complete including cost of all materials as per direction of engineer in charge. |
| 6 | Painting two coats with enamel paint over the MS gate with oil bound primer to iron surface including cost of all labour and materials taxes etc as per the direction of engineer in charge. |
| 7 | Dismantling and removing RCC columns, beams ,slab,staircase , landing,lintels including stacking the useful materials for re use and removing the debries within 50mtr lead complete as per the direction of engineer in charge. |
| 8 | RCC M25 grade with crushed granite coarse aggregate of size 20 mm down graded mixed with concrete mixer with all leads,lifts and delifts including cost , conveyance,royalty & taxes etc of all materials ,all labourscharges , T &P ,hire & running charges of all machinaries & equipment as required. |
| 9 | Supplyingfitting and fixing of Fence over drain with MS Angle and woven wire with cost,conveyance , taxes of all materials , labour , T&P etc required for the complete in all respect. |
| 10 | Supplyingfitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification with all cost and conveyance etc complete as per direction of engineer in charge. |
| 11 | RCC foundation ,plinth band,footing,base of columns mass concrete ,precast,precast slab etc. |