| 1 | PHASE 1 |
| 2 | E-Gate (Narrow Lane) at Boarding gate: (E-Gate with integrated Bar-Code Reader and Facial Biometric Capture Device) |
| 3 | Supply |
| 4 | Installation, Testing & Commissioning |
| 5 | E-gate (Narrow Lane) at PESC area: (E-Gate with integrated Bar-Code Reader and Facial Biometric Capture Device) |
| 6 | Supply |
| 7 | Installation, Testing & Commissioning |
| 8 | E-gate (Wide Lane) at Entrance Gate : (E-Gate with integrated Bar-Code Reader and Facial Biometric Capture Device) |
| 9 | Supply |
| 10 | Installation, Testing & Commissioning |
| 11 | E-Gate (Narrow Lane) at Boarding gate: (E-Gate with integrated Bar-Code Reader and Facial Biometric Capture Device): SPARE |
| 12 | Supply |
| 13 | Installation, Testing & Commissioning |
| 14 | E-gate (Wide Lane) at Entrance Gate : (E-Gate with integrated Bar-Code Reader and Facial Biometric Capture Device) : SPARE |
| 15 | Supply |
| 16 | Installation, Testing & Commissioning |
| 17 | Access switches (24 port) including SFP |
| 18 | Supply |
| 19 | Installation, Testing & Commissioning |
| 20 | Monitoring PCs |
| 21 | Supply |
| 22 | Installation, Testing & Commissioning |
| 23 | Core Room Infrastructure: Hardware required for the entire system except CIAL\"s E-Boarding Software(Servers, storage, switches, Firewall, Patch cords and any other hardware components required in the core room) |
| 24 | Supply |
| 25 | Installation, Testing & Commissioning |
| 26 | Core Room infrastructure: Software required for the entire system except CIAL\"s E-Boarding Software (OS License, Database license & any other software licenses required) |
| 27 | Supply |
| 28 | Installation, Testing & Commissioning |
| 29 | Integration Cost of E-Gate system with CIAL’s E-Boarding software |
| 30 | 25 mm PVC Conduit including accessories like bend, coupling, elbo, round box etc required for proper cabling, routing and termination/25 mm Casing Cap |
| 31 | Supply : 25 mm PVC Conduit(will be done as per actuals) |
| 32 | Laying & Commissioning : 25 mm PVC Conduit(will be done as per actuals) |
| 33 | CAT 6 UTP cabling |
| 34 | Supply: (will be done as per actuals) |
| 35 | Laying including Termination : (will be done as per actuals) |
| 36 | CAT 6 I/O (single port)with face plate, IO and back box: |
| 37 | Supply : CAT 6 I/O(will be done as per actuals) |
| 38 | Installation : CAT 6 I/O(will be done as per actuals) |
| 39 | CAT 6 Patch cords – 1 meter |
| 40 | Supply : (will be done as per actuals) |
| 41 | Installation : (will be done as per actuals) |
| 42 | CAT 6 Patch cords – 2 meter |
| 43 | Supply : (will be done as per actuals) |
| 44 | Installation : (will be done as per actuals) |
| 45 | CAT 6 24 Port Patch Panel with I/O modules |
| 46 | Supply :(will be done as per actuals) |
| 47 | Installation with accessories : CAT 6 24 Port Patch Panel(will be done as per actuals) |
| 48 | SC-LC SM OF Patch cord 3 metre |
| 49 | Supply : (will be done as per actuals) |
| 50 | Installation : (will be done as per actuals) |
| 51 | LC-LC SM OF Patch cord 5 metre |
| 52 | Supply : (will be done as per actuals) |
| 53 | Installation : (will be done as per actuals) |
| 54 | SFP Module (Single Mode) |
| 55 | Supply : (will be done as per actuals) |
| 56 | Installation : (will be done as per actuals) |
| 57 | Any other Hardware Cost for this Phase |
| 58 | Any other Software Cost for this Phase |
| 59 | Implementation Cost for Phase-1 |
| 60 | PHASE 2 |
| 61 | Hardware Cost (including servers, storage) for Integration of E-Boarding System (CIAL’s E-Boarding software & ABIS) with Digi-Yatra Ecosystem (consisting of Central Platform, Digi-Yatra App); including Operating system and Database licenses. |
| 62 | Supply |
| 63 | Installation, Testing & Commissioning |
| 64 | ABIS(Automatic Biometric Identification System) Software |
| 65 | Supply |
| 66 | Installation, Testing & Commissioning |
| 67 | Integration Cost of ABIS with CIAL’s E-Boarding software |
| 68 | Any other Hardware Cost for Phase 2 |
| 69 | Any other Software Cost for Phase 2 |
| 70 | Implementation Cost for Phase-2 |