| 1 | Removing old paint on exterior wall surfaces of lighthouse tower at all heights and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches including the cost of all materials, labours, tools & plants, necessary scaffolding etc., and all other charges etc., complete. |
| 2 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content.With water thinnable cement primer on external wall surface of lighthouse tower having VOC content less than 50 grams/litreincluding the cost of all materials, labours, tools & plants, necessary scaffolding etc., and all other charges etc., complete. |
| 3 | Painting two coats on previously painted exterior surfaces of Lighthouse tower with1st qauality Synthetic Enamel paint in black and white bands of approved brand ( Asian/ Berger/ Shalimar - high glossy) to give an even shade after scarping, brooming, sand papering, cleaning, washing the surface etc. at all heights of lighthouse tower and as directed including supply of all materials, labours, tools & plants, scaffoldings etc. and all other charges etc., complete |
| 4 | Painting two coats with 1st qauality Synthetic Enamel Paint over previously painted steel and other metal surfaces of doors, windows, grills, M.S. Gate, Ventilators etc. with Synthetic Enumel paint of approved brand ( Asian/ Berger/ Shalimar ) and colour to give an even shade including cleaning of all dirt, dust and other foreign matter, sand papering and supply of all labours, tools, materials, etc. complete as directed by the engineer in charge. |
| 5 | Removing old paint on exterior wall surfaces of lighthouse tower at all heights and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches including the cost of all materials, labours, tools & plants, necessary scaffolding etc., and all other charges etc., complete. |
| 6 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content.With water thinnable cement primer on external wall surface of lighthouse tower having VOC content less than 50 grams/litreincluding the cost of all materials, labours, tools & plants, necessary scaffolding etc., and all other charges etc., complete. |
| 7 | Painting two coats with acrylic emulsion paint of approved brand and manufacture to give an even shade : acrylic emulsion paint interior grade of Ist quality approved brand and acture(Asian/Berger/Shalimar-high glossy), including applying additional coats wherever required to achieve even shade on previously painted inside wall surfce of LH tower, scrapping, sand papering, preparing the surface smooth including necessary repairs to scratches etc., and as directed including the cost of all materials,labours,tools & plantsand all other charges etc., complete. |
| 8 | Painting two coats withsynthetic enemal paint of Ist quality approved brand and manufacture(Asian/Berger/Shalimar-high glossy), on previously painted metal surfaces over a coat of metal primer (zinc chromate) wherever necessaryincluding applying additional coats wherever required to achieve even shade and colour afterpreparing the surface smooth and as directed including the cost of all materials,labours,tools & plantsand all other charges etc., complete. |
| 9 | Top hand railing in LH tower |
| 10 | Main gate |
| 11 | MS grill |
| 12 | solar panel stand |
| 13 | Painting two coats with Acrylic Smooth exterior paint of required shade : of approved Ist quality (Asian/Berger/Shalimar-high glossy) on previously painted exterior wall surface of allied buildingsto give an even shade after scraping, brooming, sand papering, cleaning all dirt & dust and preparation of surface smooth at all height and as directed including the cost of all materials,labours,tools & plants andall other charges etc., complete. |
| 14 | Repairs to patch plastering to masonry walls, ceiling, RCC slab, Chajja after removing and cleaning the old worn out plaster under 1.00 sqm area and replastering the same with 15mm to 20mm thickin cement mortar 1:4 (1 cement,4 river sand ) at all heights including mixing with plaster bond chemical as recommended by the manufacturer including disposal of debrises and costof scaffolding, curing and as directed including supply of all materials, tools, labours etc. complete |
| 15 | Repair works to cracks in plastering / masonary / R.C.C. works/ lintels/ beams/ chajjas etc. cutting out cracks in \"V\" section , cleaning out wetting, grouting with cement-sand slurry, 1:3( 1 Cement, 3 Sand) including mixing with water proofing compound as recommended by the manufacturerand as directed including supply of all materials, tools, labours, scaffoldings etc. complete |
| 16 | Providing camping arrangements for suprvising staff of directorate as well for the work party employed for the maintainance works at the Sao George\"s island Lighthouse station since the station is not having adequate arangements for camping at the station including cost of supply of the materials, transportation, procurment etc., |
| 17 | i. Supply of PVC chairs |
| 18 | ii. Supply of PVC tea poy |
| 19 | iii. Supply of cotton matteresses of size 195 cms X 90 cms |
| 20 | iv. Supply of cotton pillows of size 60 cms X 30 cms |
| 21 | v. Supply of bed sheets |
| 22 | vi. Supply of quilts |
| 23 | vii. Supply of mosquito nets |
| 24 | vii. Supply of PVC jerry can of 25 litre capacity |
| 25 | Hire charges of mechanical boat from Sinquerium Jettyto Sao George island Lighthouse jetty for transport of camping materials and ferrying departmental supervising staffs and inspecting officials includingcost of fuel, operating staff and all other necessary permissios from the authorities as required for ferry operations and providing safty arrangements on board the Boat with life jackes etc.complete. |
| 26 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness (In area of light jungle) and as directed including supply of all Labours, tools & plants etc. complete . |