}

Steel Storage Tanks Consists Of Structural Steel Work, Plate Work, Nozzle Installation, Piping Work For Foam And Cooling System And All Other Necessary Wrk, bathinda-Punjab

Bridge And Roof Company I Limited has published Steel Storage Tanks Consists Of Structural Steel Work, Plate Work, Nozzle Installation, Piping Work For Foam And Cooling System And All Other Necessary Wrk. Submission Date for this Tender is 23-03-2022. Tanks and Cylinders Tenders in bathinda Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

31174198
Corrigendum : Steel Storage Tanks Consists Of Structural Steel Work, Plate Work, Nozzle Installation, Piping Work For Foam And Cooling System And All Other Necessary Wrk
Open Tender
Indian
Punjab
bathinda
23-03-2022

Tender Details

Steel Storage Tanks Consists Of Structural Steel Work, Plate Work, Nozzle Installation, Piping Work For Foam And Cooling System And All Other Necessary Wrk

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 11-Mar-2022 Corrigendum - I Date 19-03-2022
2 19-Mar-2022 Corrigendum - II Date 23-03-2022

Key Value

Document Fees
INR 2360 /-
EMD
INR 100000.0 /-
Tender Value
INR 4.04 Crore /-

BOQ Items

Name of Work : CARRYING OUT FABRICATION, ERECTION, TESTING WORK PERTAINING TO MECHANICAL CONSTRUCTION OF VARIOUS STEEL STORAGE TANKS CONSISTS OF STRUCTURAL STEEL WORK, PLATE WORK, NOZZLE INSTALLATION, PIPING WORK FOR FOAM & COOLING SYSTEM AND ALL OTHER NECESSARY WORKS IN CONNECTION WITH CONSTRUCTION OF VARIOUS TANKS AT HPCL 2G ETHANOL BIO-REFINERY PROJECT, BATHINDA, PUNJAB.
Sl. No. Item Description
1STRUCTURAL STEEL WORKHPCL 2G ETHANOL BIO-REFINERY PROJECT, BATHINDA, PUNJAB
2PLATE WORKS : Taking delivery and onward transportation of Free Issue plates from B&R Stores / Storage point to Fabrication Yard/erection site, unloading and stacking, fabrication, erection, alignment and welding of Shell Plate, Bottom Plate (including Sketch Plates, Annular Plates and Backing Strips), Cone Roof Plate, fabricated Wind Girders, Wind Girder Opening, Bearing Plates for Pipe Supports, Datum Plates, Gusset Support for Wind Girders, Sump for Drain Nozzle, all types of Pipe Fittings (wherever required), Over Flow Settlement Gauge including fabrication and installation of all items as per Drawing. This job also includes conducting all necessary tests (except Radiographic Test) such as Vacuum Test, MP/DP Test, Pneumatic Test, Oil Penetrant Examination, Hydrostatic Test etc. for Shell, Bottom and Roof plates as per Specification/Job Procedure/Quality Assurance Plan by providing all required labour, Plant & Machineries, consumables whatever is necessary to complete the work in all respect as per Drawings, Specifications, Standards, Codes, Scope of Work and instructions of Engineer in Charge. Reconciliations of Free Issue Materials and returning surplus material / off cuts / scrap to B&R"s storage point/stores is also included in the scope of the Agency under this contract. NOTE : For Shell to Bottom welding joints, Low Hydrogen electrodes will have to be used. Erection of the tank Shells shall be done by Jack-up Method (Required Hydraulic Jack with Pump will be provided by B&R on Free Issue basis). Overlaps in joints of Bottom and Roof Plates will not be considered for payment.
3STRUCTURAL WORK : Taking delivery and onward transportation of Free Issue plates from B&R Stores / Storage point to work site, fabrication, erection, alignment, welding, inspection and testing of steel structure for Support Angle, Rim Angle, Truss Plates, complete Structures for Cone Roof/Internal Floating Roof, Rafters, Curb Angle, Cage Ladder, Spiral Stairway, MS Square Rods, Top and Intermediate Platforms, Wind Girder Supports, Anchor Chair, Fasteners, Bracings and Supports, Stiffeners, Gussets, Earthing Boss, Ladder Arrangement between 200 NB Gauge Wells, Support Bracket for Lightening Arrestor, Rolling Ladder including Track for Floating Roof, Name Plates, Earthing Connections, Ladder Rungs for Ladders in coveredRoof Tanks, Wind Girder fabricated from Rolled section, Wind Girder Bracings/Support, external structural supports, supports for Shell Extension for Foam Nozzles in case of Floating Roof Tanks, Stiffeners for Shell extension Plate of Stairway, Ventilation Slots and Over Flow Slots for Covered Floating Roof Tank,Interconnecting/Intermediate Platforms, Monorail structure etc. This job includes providing all requisite labour, Plant & Machineries, consumables, whatever is required to complete the work in all respect as per Drawings, Specifications, Standards, Codes, Scope of Work and instructions of Engineer in Charge.
4STRUCTURAL PIPE WORK : Same as Item 2.1 above but for materials conforming to pipe specification for Pipe Handrails (CS), Gauge Hatch with Still Well for Gauge Hatch, Still Well for Level Transmitter/Level Switches, Still Well for Temperature Element including Flanges on all Still Wells, Pipe Fittings, drilling of holes in Still Well Pipes including grinding, buffing, making curvature as per approved drawings (wherever required), welding on steel members by providing all labour, Plant & Machineries, consumables, whatever is required to complete the work in all respect as per Drawings, Specifications, Standards, Codes, Scope of work and instructions of Engineer in Charge.
5GALVANISED CS GRATING : Taking delivery from B&R Store, loading, unloading, transportation to site, storage & handling at site, installation at all appropriate location & elevation including making all necessary cut-out in Grating, wherever required, alignment & welding of Gratings on supporting Beams/Structures in true to line, level & dimension. The scope of the work shall be including supply of all labour, Plant & Machineries, consumables, whatever is required to complete the work in all respect as per drawings, Technical Specification, Job Procedure and direction of the Engineer in Charge. These items envisage fixing of CS Galvanized Grating (Manufactured as per Standard and will be provided by B&R on Free Issue basis).
6ALUMINIUM FLOATING ROOF : Erection, assembly, fixing, testing & commissioning of the Aluminium Internal Floating Roof including all accessories like Manhole, Adjustable support, Vacuum Breaker, Deck Drain, Foam Dam etc. as per tender specifications and drawings. The scope of job includes erection of all required component & accessories (included not listed above) necessary for completion of Internal Floating Roof work in all respect. The job to be executed as per technical specifications, job procedures etc. complete including supply of all labour and as directed by Engineer in Charge.
7Tank No. T-9801 A/B, Size : 11,000.00 MM Dia.
8Tank No. T-9803 A/B/C & T-9806, Size : 5,500 MM Dia.
9APPURTENANCES : Carrying out fabrication, erection, fit up & alignment, welding, inspection and testing, whatever is required for installation of the following Shell & Roof appurtenances as shown on drawings and standards. Rate shall include fabrication, fit up & welding of Neck Rings, Seamless Pipes, Flanges, Reinforcement Pads, bolting all Slip-on/Weld Neck Flanges with Blind Flanges (wherever required as per Drawing), Fasteners, Gaskets, Trough etc. as per drawings complete in line with Specification. This job also includes conducting all types of tests (except Radiographic Test) like DP testing of the Root welding and Air Pressure test with soap solution by applying pressure of 1.05 kg/sq.cm. before hydrostatic testing for Reinforcement Pads including supply of all labour, Equipment & Machineries, consumables whatever is required to complete the work as per drawings, Specifications, Standards, Codes, Scope of work and instructions of the Engineer in Charge of B&R/TEn/HPCL.
10Cleanout Access door ( Size - 900 mm X 1200 mm)
11Shell Manhole ( Size - 600 mm)
12Shell Nozzles 150 class S.O.R.F. ( Size - 400 mm NB )
13Shell Nozzles 150 class S.O.R.F. ( Size - 300 mm NB )
14Shell Nozzles 150 class S.O.R.F. ( Size - 250 mm NB )
15Shell Nozzles 150 class S.O.R.F. ( Size - 200 mm NB )
16Shell Nozzles 150 class S.O.R.F. ( Size - 150 mm NB )
17Shell Nozzles 150 class S.O.R.F. ( Size - 100 mm NB )
18Shell Nozzles 150 class S.O.R.F. ( Size - 80 mm NB )
19Shell Nozzles 150 class S.O.R.F. ( Size - 50 mm NB )
20Shell Nozzles 150 class S.O.R.F. ( Size - 40 mm NB )
21RoofManhole ( Size - 600 mm)
22Roof Vent Nozzles 150 class S.O.R.F.. ( Size - 100 mm NB ) with Goose Neck & Silica gel Breather
23Roof Vent Nozzles 150 class S.O.R.F.. ( Size - 50 mm NB ) with Goose Neck& Coarse wire Mesh
24Roof Vent Nozzles 150 class S.O.R.F.. ( Size - 150 mm NB ) with Goose Neck& Coarse wire Mesh
25Roof Vent Nozzles 150 class S.O.R.F.. ( Size - 300 mm NB ) with Goose Neck& Coarse wire Mesh
263" CS Dip Pipe for nozzle : Fabrication, erection welding and testing for Sch 40 dip pipe with holes as per specification, standard and up-to satisfaction of HPCL Engineer-in-Charge
27Emergency Venting System for each Tanks : Fabrication, Installation welding and testing as per Drawings and Specification
28TANK UNDER BOTTOM CONNECTION
291.5" Carbon Steel SR Elbow and associated pipe for tank Under-bottom connection. Welding and installation and testing as required by specification.
302" Carbon Steel SR Elbow and associated pipe for tank Under-bottom connection. Welding and installation and testing as required by specification.
314" Carbon Steel SR Elbow and associated pipe, flange, blind, gasket, nuts, bolts including Spares for tank Under-bottom connection. Welding and installation and testing as required by specification.
326" Carbon Steel SR Elbow and associated pipe, flange, blind, gasket, nuts, bolts including Spares for tank Under-bottom connection. Welding and installation and testing as required by specification.
338" Carbon Steel SR Elbow and associated pipe, flange, blind, gasket, nuts, bolts including Spares for tank Under-bottom connection. Welding and installation and testing as required by specification.
34INSTALLATION OF AGITATOR ASSEMBLY : Taking delivery from B&R Store, handling & transportation to erection site and installation of Agitator Assembly with Motor and all accessories in position as per Data Sheet, Manufacturer"s recommendation, Job Procedure and as per instruction of Engineer in Charge/Manufacturer.
35INSTALLATION OF BREATHER VALVE / PVRV / VRV : Taking delivery from B&R Store, handling & transportation to erection site and installation of Breather Valves / PVRV / VRValong with gaskets & Fasteners to complete the work as per drawings, Specifications, Standards, Codes, Scope of Work, Job Procedure and instructions of Engineer in Charge.
36INSTALLATION OF WATER SPARKLE : Taking delivery of all required Piping materials from B&R Store, handling & transportation of the same to erection site, fabrication, erection, welding, installation and testing of Water Sparkle for Molasses Tank (Tank No. T-9320) in line with Drawing, Technical Specification, Job Procedure of tender Document. The scope of the work shall be including supply of all labour, Plant & Machineries, consumables, whatever is required to complete the work in all respect as per drawings, Technical Specification, Job Procedure and direction of the Engineer in Charge
37INSTALLATION OF STEAM PURGER : Taking delivery of all required Pipe & Pipe Fittings from B&R Store, handling & transportation of the same to erection site, fabrication, erection, welding, installation and testing of Steam Purgerfor CIP Tank (Tank No. T-9303) in line with Drawing, Technical Specification, Job Procedure of tender Document. The scope of the work shall be including supply of all labour, Plant & Machineries, consumables, whatever is required to complete the work in all respect as per drawings, Technical Specification, Job Procedure and direction of the Engineer in Charge
38INSTALLATION OF PERIPHERAL VENTS : Taking delivery of all required Piping materials from B&R Store, handling & transportation of the same to erection site, fabrication, erection, welding, and testing of Peripheral Vents with Water Ingress Protection for Tanks of Rectangular/Circular Cross section of with minimum Free Area of 0.30 Sq. M. with Goose Neck / Weather Shield to prevent the Ingress from rain water and Coarse-mesh screen of opening 13 MM minimum made of SS304. The scope of the work shall be including supply of all labour, Plant & Machineries, consumables, whatever is required to complete the work in all respect as per drawings, Technical Specification, Job Procedure, Code, Standard and direction of the Engineer in Charge
39Tank No. T-9801 A
40Tank No. T-9803 A & T-9806
41INSTALLATION OF GALVANISED CARBON STEEL PIPING SYSTEM FOR WATER SPRINKLER SYSTEM/FOAM POURER SYSTEM : Taking delivery of all required Free Issue Piping materials from B&R Store, handling & transportation of the same to erection site, fabrication, erection, testing and commissioning of Galvanised Carbon Steel piping system for Water Sprinkler System/Foam Pourer System including installation of Pipe and Pipe Fittings like Elbows, Flanges, Equal Tee, Reducing Tee, Concentric Reducer, Eccentric Reducer, Threadolet, Eccentric Swage, Strainers, Orifice Flange with Restricted Orifice Plate, Blind Flange, Valves of all ratings & Sizes, Fasteners, Gaskets, Drain Valves in each Fire Water/Foam Header as shown in the scope limit drawings all other items like Fixtures, Deflector Plates, Piping (all Horizontal Circular Rings, Vertical Riser), all structural/ pipe supports, Water Spray Nozzles, Revolving Head, Reverse Action Water Spray Nozzle, Breaching connection (Two way), PCC encasing for pipes crossing the dyke etc. This job includes providing all required labour, Plant & Machineries (along with Operators & Fuel), consumables, whatever is required to complete the work in all respect as per drawings, Specifications, Standards, Codes, Job Procedure and instructions of the Engineer in Charge. Agency has to carry out the reconciliations of Free Issue Materials and return the surplus material/off cuts scrap to B&R"s storage point/Stores.
42PIPE Size : 0.5 Inch, S-160 SMLS, ASME B36.10, ASTM A106 Gr.B Galv.
43PIPE Size : 2.0 Inch, S-160 SMLS, ASME B36.10, ASTM A106 Gr.B Galv.
44PIPE Size : 2.5 Inch, S-160 SMLS, ASME B36.10, ASTM A106 Gr.B Galv.
45PIPE Size : 3.0 Inch, S-STD, ASME B36.10, ASTM A106 Gr.B Galv.
46PIPE Size : 4.0 Inch, S-STD, ASME B36.10, ASTM A106 Gr.B Galv.
47INSTALLATION OF FIRE FIGHTING EQUIPMENT : Taking delivery of all required Fire Fighting Equipments (will be issued on Free Issue Materials basis) from B&R Store, handling & transportation of the same to erection site, installation, testing and commissioning of following Fire Fighting equipment in line with relevant Technical Specifications, Data Sheet, Drawing by fixing of fasteners & gaskets, by welding (wherever needed for fixing the equipment with matching Flange etc.) including providing of all required labour, Plant & Machineries, consumables, whatever is required to complete the work in all respects as per drawings, Specifications, Standards, Data Sheet, Job Procedure and direction of the Engineer in Charge.
48Medium Expansion Foam Generator (Fixed Type).
49Foam Inductor: Inlet Size: 100 NB
50Foam Chamber: Inlet Size: 65 NB
51Flushing Connector
52Earthing Boss (Rate is including fixing of Brass Stud & Washers, MS Bolts etc. complete as per technical specification and standard drawings)
53"NOTE:- THE ABOVE RATE SHALL BE INCLUSIVE OF ALL TAXES & DUTIES, ROYALTIES, CESS, ENVIORMENTAL & POLLUTION, FITNESS & SAFETY CLEARANCE CHARGES (IF ANY), OR ANY OTHER INCIDENTAL CHARGES ETC BUT EXCLUDING GST."
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail