Indradhanush Gas Grid Limited-IGGL has published Geotechnical Investigation, Cadastral Survey, Providing Services For Establishment Of Rou In Row And Activities Related To Row Opening During Pipeline Construction And Obtaining Permissions For Proposed Negg Pipeline Under Phase-Iii. Submission Date for this Tender is 09-03-2022. Geotechnical Investigation Tenders in guwahati Assam. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 25-Feb-2022 | Corrigendum No 01 | Technical Bid | 09-03-2022 |
Sl. No. | Item Description |
1 | PART: AWEST BENGAL |
2 | Deployment-& Erection of Boring craft & rig in each borehole location as per specifications,. SCC. Scope ofwork. and direction of Engineer-in-charge Note. Ï) Boring depth shall be measured from Ground Level/River Bed level. Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be as per specification |
3 | In Land |
4 | In Water |
5 | Conducting Boring at site in soil, as per specification ,SCC ,Scope of work and direction of Engineer-in-charge ,NOTE: i) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification |
6 | In Land |
7 | In Water |
8 | Drilling through rock with Nx size double tube core, barrel up to a depth asSpecified in SCC below GL/bed level using TC bit/diamondbit as per specifications , SC C, Scope of work and direction of Engineer-in-charge . NOTE :i) ) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification |
9 | In Land |
10 | In Water |
11 | Standard penetration test at different depth as per specification,SCC,Scope of work and direction of Engineer-in-charge |
12 | Collection of undisturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge |
13 | Collection of disturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge. |
14 | Sieve analysis |
15 | Hydrometer analysis |
16 | Atterberg limits |
17 | Natural moisture content |
18 | Bulk density of soil |
19 | Dry density of soil |
20 | Specific gravity |
21 | Direct Shear Test |
22 | Triaxial Shear Test (UD) |
23 | Permeability Test |
24 | Cosolidation Test |
25 | Unconfined compression test |
26 | Swelling pressure test |
27 | Free swell index test |
28 | Shrinkage limit test |
29 | Uniaxial compressive strength of rock sample |
30 | Specific gravity test of rock sample |
31 | PART: ASIKKIM |
32 | Deployment-& Erection of Boring craft & rig in each borehole location as per specifications,. SCC. Scope ofwork. and direction of Engineer-in-charge Note. Ï) Boring depth shall be measured from Ground Level/River Bed level. Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification |
33 | In Land |
34 | In Water |
35 | Conducting Boring at site in soil, as per specification ,SCC ,Scope of work and direction of Engineer-in-charge ,NOTE: i) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification |
36 | In Land |
37 | In Water |
38 | Drilling through rock with Nx size double tube core, barrel up to a depth asSpecified in SCC below GL/bed level using TC bit/diamondbit as per specifications , SC C, Scope of work and direction of Engineer-in-charge . NOTE :i) ) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification |
39 | In Land |
40 | In Water |
41 | Standard penetration test at different depth as per specification,SCC,Scope of work and direction of Engineer-in-charge |
42 | Collection of undisturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge |
43 | Collection of disturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge |
44 | Sieve analysis |
45 | Hydrometer analysis |
46 | Atterberg limits |
47 | Natural moisture content |
48 | Bulk density of soil |
49 | Dry density of soil |
50 | Specific gravity |
51 | Direct Shear Test |
52 | Triaxial Shear Test (UD) |
53 | Permeability Test |
54 | Cosolidation Test |
55 | Unconfined compression test |
56 | Swelling pressure test |
57 | Free swell index test |
58 | Shrinkage limit test |
59 | Uniaxial compressive strength of rock sample |
60 | Specific gravity test of rock sample |
61 | PART: ANAGALAND |
62 | Deployment-& Erection of Boring craft & rig in each borehole location as per specifications,. SCC. Scope ofwork. and direction of Engineer-in-charge Note. Ï) Boring depth shall be measured from Ground Level/River Bed level. Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification |
63 | In Land |
64 | In Water |
65 | Conducting Boring at site in soil, as per specification ,SCC ,Scope of work and direction of Engineer-in-charge ,NOTE: i) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification |
66 | In Land |
67 | In Water |
68 | Drilling through rock with Nx size double tube core, barrel up to a depth asSpecified in SCC below GL/bed level using TC bit/diamondbit as per specifications , SC C, Scope of work and direction of Engineer-in-charge . NOTE :i) ) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification |
69 | In Land |
70 | In Water |
71 | Standard penetration test at different depth as per specification,SCC,Scope of work and direction of Engineer-in-charge |
72 | Collection of undisturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge |
73 | Collection of disturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge. |
74 | Sieve analysis |
75 | Hydrometer analysis |
76 | Atterberg limits |
77 | Natural moisture content |
78 | Bulk density of soil |
79 | Dry density of soil |
80 | Specific gravity |
81 | Direct Shear Test |
82 | Triaxial Shear Test (UD) |
83 | Permeability Test |
84 | Cosolidation Test |
85 | Unconfined compression test |
86 | Swelling pressure test |
87 | Free swell index test |
88 | Shrinkage limit test |
89 | Uniaxial compressive strength of rock sample |
90 | Specific gravity test of rock sample |
91 | PART: A MANIPUR |
92 | Deployment-& Erection of Boring craft & rig in each borehole location as per specifications,. SCC. Scope ofwork. and direction of Engineer-in-charge Note. Ï) Boring depth shall be measured from Ground Level/River Bed level. Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification |
93 | In Land |
94 | In Water |
95 | Conducting Boring at site in soil, as per specification ,SCC ,Scope of work and direction of Engineer-in-charge ,NOTE: i) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification |
96 | In Land |
97 | In Water |
98 | Drilling through rock with Nx size double tube core, barrel up to a depth asSpecified in SCC below GL/bed level using TC bit/diamondbit as per specifications , SC C, Scope of work and direction of Engineer-in-charge . NOTE :i) ) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification |
99 | In Land |
100 | In Water |
101 | Standard penetration test at different depth as per specification,SCC,Scope of work and direction of Engineer-in-charge |
102 | Collection of undisturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge |
103 | Collection of disturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge |
104 | Sieve analysis |
105 | Hydrometer analysis |
106 | Atterberg limits |
107 | Natural moisture content |
108 | Bulk density of soil |
109 | Dry density of soil |
110 | Specific gravity |
111 | Direct Shear Test |
112 | Triaxial Shear Test (UD) |
113 | Permeability Test |
114 | Cosolidation Test |
115 | Unconfined compression test |
116 | Swelling pressure test |
117 | Free swell index test |
118 | Shrinkage limit test |
119 | Uniaxial compressive strength of rock sample |
120 | Specific gravity test of rock sample |
121 | Submission of final technical report, in hard copy (six sets) as well assoft copy (in CD),asper tender specifications and instruction of EIC/ Site Engineer for all States |
122 | PART-B: WEST BENGAL |
123 | Cadestral survey (upto preparation of Schedule u/s 3(1) of P&MPAct ,1962 |
124 | Carrying out Cadastral Survey, for laying cross country petroleumpipeline, obtaining/ procuring latest village maps from Revenueauthorities (actual cost incurred on procurement to be reimbursed byowner on reciept of proof of payment), tracing/ scanning the same andstorage in both hard and soft reproducible forms, plotting the pipelineroute on village maps and marking on them the Intermediate Points (IPs)and Turning Points (TPs) of the surveyed route as staked on ground,identification of survey numbers of individual owners and plotting onvillage maps as per latest revenue records, preparation of field bookand computation of area in each plot coming within limits of ROUcorridor, collection of Jamabandi (the record of right holders) fromrevenue authorities in respect of each plot falling within ROU limits and identification of owner and occupier thereof, collection of interimmutations, if any, and incorporation in Jamabandi and other works asper detailed scope of work specified in Special Conditions of Contract(SCC) and specifications of tender documents and direction of Engineer-in-Charge, inclusive of all labour, material, equipment etc.including compensation to farmers on account of any damage to crops,fields etc. while conducting survey through fields, works complete inall respects, upto and including preparation & submission of schedule for 3(1) Notification for establishing right of users (ROU) in Right of Way (ROW) under P&MP Act 1962 for new/additonal pieline ROW, complete in all respects.Integrating cadastral & 3(1) details on Owner"s Arc GISserver to obtain seamless Geo-referenced data. |
125 | Providing services for establishing Right of Users (ROU) in Right of Way (ROW) under P&MP Act 1962, for laying cross country pipeline including followup for 3(1) Gazette notification, preparation of Erratum & Corrigendum (it required), preparation & serving of 3 (1) notices. facilitating hearing & disposal of objections, preparation of schedule for 6(1) Notification, followup for Gazette notification, preparation of Erratum & Corrigendum, preparation & serving of 6(1) notices, entry of Gazette notification in village records. collection of land rates, calculation of land compensation payable & serving of compensation notices, assistance to Competent Authority in preparation of award to individual landowners etc. as per detailed scope of work specified in special conditions of contract and specifications of tender document and direction of Engineer-in-Charge/ Site Engineer inclusive of all labour, material, equipment etc. complete in all respects. Integration of ROU details on Owners Arc GIS server to obtain seamless geo-referenced data. |
126 | For acquinng ROW of 20 m width for newly proposed pipeline |
127 | OBTAINING APPROVALS / PERMISSIONS FOR PIPELINE CROSSINGS |
128 | Obtaining approvals/ permissions from appropriate respective State! National and other statutory authorities for various pipeline crossings enroute like National Highways, State Highways, other Roads, Railways, River. Canal Drain crossings or any other utility crossings etc as per detailed scope of work specified in Special Conditiosn of Contract (SCC) and specifications of the tender documents and direction of Engineer-in-Charge/ Site Engineer. Integrating all details on Owner"s Arc GIS (ESRI) server along the entire Pipeline Route "Note: 1) Payment shall be made for obtaining each permission. Cluster of crossings needing permission from same Authority shall be considered as one permission, for the purpose of payment 2) For Railway crossings. each crossing shall be treated as separate and payment shall be made on unit basis" |
129 | National Highway Crossings under each authority |
130 | State Highway Crossings under each authority |
131 | Other road crossings under each authority |
132 | Railway Crossings (for each individual crossing) |
133 | River Crossings under each authority |
134 | Canal Crossings under each authority |
135 | Other pipeline crossings and utilities |
136 | Water bodies like ponds. lakes, creek, drains, nalas etc. under each authority |
137 | Forestunder each authority |
138 | PART-B: SIKKIM |
139 | OBTAINING APPROVALS / PERMISSIONS FOR PIPELINE CROSSINGS |
140 | Obtaining approvals/ permissions from appropriate respective State! National and other statutory authorities for various pipeline crossings enroute like National Highways, State Highways, other Roads, Railways, River. Canatl Drain crossings or any other utility crossings etc as per detailed scope of work specified in Special Conditiosn of Contract (SCC) and specifications of the tender documents and direction of Engineer-in-Charge/ Site Engineer. Integrating all details on Owner"s Arc GIS (ESRI) server along the entire Pipeline Route "Note: 1) Payment shall be made for obtaining each permission. Cluster of crossings needing permission from same Authority shall be considered as one permission, for the purpose of payment 2) For Railway crossings. each crossing shall be treated as separate and payment shall be made on unit basis" |
141 | National Highway Crossings under each authority |
142 | State Highway Crossings under each authority |
143 | Other road crossings under each authority |
144 | River Crossings under each authority |
145 | Canal Crossings under each authority |
146 | Other pipeline crossings and utilities |
147 | Water bodies like ponds. lakes, creek, drains, nalas etc. under each authority |
148 | Forest for each state |
149 | PART B:MANIPUR |
150 | OBTAINING APPROVALS / PERMISSIONS FOR PIPELINE CROSSINGS |
151 | "Obtaining approvals/ permissions from appropriate respective State/ National and other statutory authorities for various pipeline crossings enroute like National Highways. State Highways, other Roads, Railways, River, Canal./ Drain crossings or any other utility crossings etc. as per detailed scope of work specified in Special Conditiosn of Contract (SCC) and specifications of the tender documents and direction of Engineer-in-Charge/ Site Engineer. Integrating all details on Owner"s Arc GIS (ESRI) server along the entire Pipeline Route" "Note: 1) Payment shall be made for obtaining each permission. Cluster of crossings needing permission from same Authority shall be considered as one permission, for the purpose of payment 2) For Railway crossings. each crossing shall be treated as separate and payment shall be made on unit basis" |
152 | National Highway Crossings under each authority |
153 | State Highway Crossings under each authority |
154 | Other road crossings under each authority |
155 | River Crossings under each authority |
156 | Other pipeline crossings and utilities |
157 | Water bodies like ponds. lakes, creek, drains, nalas etc. under each authority |
158 | Forest for each state |
159 | PART-B NAGALAND |
160 | Cadestral survey (upto preparation of Schedule u/s 3(1) of P&MPAct ,1962 |
161 | Carrying out Cadastral Survey, for laying cross country petroleumpipeline, obtaining/ procuring latest village maps from Revenueauthorities (actual cost incurred on procurement to be reimbursed byowner on reciept of proof of payment), tracing/ scanning the same andstorage in both hard and soft reproducible forms, plotting the pipelineroute on village maps and marking on them the Intermediate Points (IPs)and Turning Points (TPs) of the surveyed route as staked on ground,identification of survey numbers of individual owners and plotting onvillage maps as per latest revenue records, preparation of field bookand computation of area in each plot coming within limits of ROUcorridor, collection of Jamabandi (the record of right holders) fromrevenue authorities in respect of each plot falling within ROU limitsand identification of owner and occupier thereof, collection of interimmutations, if any, and incorporation in Jamabandi and other works asper detailed scope of work specified in Special Conditions of Contract(SCC) and specifications of tender documents and direction ofEngineer-in-Charge, inclusive of all labour, material, equipment etc.including compensation to farmers on account of any damage to crops,fields etc. while conducting survey through fields, works complete inall respects, upto and including preparation & submission of schedulefor 3(1) Notification for establishing right of users (ROU) in Right ofWay (ROW) under P&MP Act 1962 for new/additonal pieline ROW, complete inall respects.Integrating cadastral & 3(1) details on Owner"s Arc GISserver to obtain seamless Geo-referenced data |
162 | "Providing services for establishing Right of Users (ROU) in Right of Way (ROW) under P&MP Act 1962, for laying cross country pipeline including followup for 3(1) Gazette notification, preparation of Erratum & Corrigendum (if required), preparation & serving of 3 (1) notices, facilitating hearing & disposal of objections. preparation of schedule for 6(1) Notificatin, followup for Gazette notification, preparation of Erratum & Corrigendum. preparation & serving of 6(1) notices. entry of Gazette notification in village records, collection oftarld rates. calculation of land compensation payable & serving of compensation notices, assistance to Competent Authority in preparation of award to individual landowners etc as per detailed scope of work specified in special conditions of contract and specifications of tender document and direction of Engineer•in-Charge/ Site Engineer inclusive of all labour, material. equipment etc complete in all respects. Integration of ROU details on Owners Arc GIS server to obtain scentless gee-referenced data" |
163 | For acquiring ROW of 20 m width for newly proposed pipeline |
164 | OBTAINING APPROVALS / PERMISSIONS FOR PIPELINE CROSSINGS |
165 | "Obtaining approvals/ permissions from appropriate respective State/ National and other statutory authorities for various pipeline crossings enroute like National Highways, State Highways, other Roads, Railways, River, Canal! Drain crossings or any other utility crossings etc. as per detailed scope of work specified in Special Conthliosn of Contract (SCC) and specifications of the tender documents and direction of Engineer•in-Charge/ Site Engineer. Integrating all details on Owner"s Arc GIS (ESRI) server along the entire Pipeline Route" "Note 1) Payment shall be made for obtaining each permission. Cluster of crossings needing permission from same Authority shall be considered as one permission, for the purpose of payment 2) For Railway crossings, each crossing shall be treated as separate and payment shall be made on unit basis" |
166 | NH road crossing under each authority |
167 | State Highway Crossings under each authority |
168 | Other road crossings under each authority |
169 | River Crossings under each authority |
170 | Other pipeline crossings and utilities |
171 | Water bodies like ponds. lakes, creek, drains, nalas etc. under each authority |
172 | Forest for each state |
173 | PART-C: WEST BENGAL |
174 | RoU opening/for entire RoW while laying the pipe line |
175 | Office/ establishment charges per month per camp in any state |
176 | PART-C NAGALAND |
177 | RoU opening/for entire RoW while laying the pipe line |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy