Petroleum and Natural Gas Boards / Undertakings / PSU Closing in 0 days TDR #31118233

Geotechnical Investigation, Cadastral Survey, Providing Services For Establishment Of Rou In Row And Activities Related To Row Opening During Pipeline Construction And Obtaining Permissions For Proposed Negg Pipeline Under Phase-Iii

Issued by Boards / Undertakings / PSU · guwahati, Assam
Tender Value
Ref. Documents
Estimated cost
Bid Submission
09 Mar 2022
0 days left
EMD
7.97 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
guwahati → Assam
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Geotechnical Investigation, Cadastral Survey, Providing Services For Establishment Of Rou In Row And Activities Related To Row Opening During Pipeline Construction And Obtaining Permissions For Proposed Negg Pipeline Under Phase-Iii

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 25-Feb-2022 Corrigendum No 01 Technical Bid 09-Mar-2022

BOQ

Name of Work: GEOTECHNICAL INVESTIGATION, CADASTRAL SURVEY, PROVIDING SERVICES FORESTABLISHMENT OF ROU IN ROW AND ACTIVITIES RELATED TO ROW OPENING DURING PIPELINE CONSTRUCTION AND OBTAINING PERMISSIONS FOR PROPOSED NEGG PIPELINE UNDER PHASE-III IN WEST BENGAL, SIKKIM, NAGALAND & MANIPUR
Sl. No. Item Description
1PART: AWEST BENGAL
2Deployment-& Erection of Boring craft & rig in each borehole location as per specifications,. SCC. Scope ofwork. and direction of Engineer-in-charge Note. Ï) Boring depth shall be measured from Ground Level/River Bed level. Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be as per specification
3In Land
4In Water
5Conducting Boring at site in soil, as per specification ,SCC ,Scope of work and direction of Engineer-in-charge ,NOTE: i) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification
6In Land
7In Water
8Drilling through rock with Nx size double tube core, barrel up to a depth asSpecified in SCC below GL/bed level using TC bit/diamondbit as per specifications , SC C, Scope of work and direction of Engineer-in-charge . NOTE :i) ) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification
9In Land
10In Water
11Standard penetration test at different depth as per specification,SCC,Scope of work and direction of Engineer-in-charge
12Collection of undisturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge
13Collection of disturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge.
14Sieve analysis
15Hydrometer analysis
16Atterberg limits
17Natural moisture content
18Bulk density of soil
19Dry density of soil
20Specific gravity
21Direct Shear Test
22Triaxial Shear Test (UD)
23Permeability Test
24Cosolidation Test
25Unconfined compression test
26Swelling pressure test
27Free swell index test
28Shrinkage limit test
29Uniaxial compressive strength of rock sample
30Specific gravity test of rock sample
31PART: ASIKKIM
32Deployment-& Erection of Boring craft & rig in each borehole location as per specifications,. SCC. Scope ofwork. and direction of Engineer-in-charge Note. Ï) Boring depth shall be measured from Ground Level/River Bed level. Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification
33In Land
34In Water
35Conducting Boring at site in soil, as per specification ,SCC ,Scope of work and direction of Engineer-in-charge ,NOTE: i) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification
36In Land
37In Water
38Drilling through rock with Nx size double tube core, barrel up to a depth asSpecified in SCC below GL/bed level using TC bit/diamondbit as per specifications , SC C, Scope of work and direction of Engineer-in-charge . NOTE :i) ) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification
39In Land
40In Water
41Standard penetration test at different depth as per specification,SCC,Scope of work and direction of Engineer-in-charge
42Collection of undisturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge
43Collection of disturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge
44Sieve analysis
45Hydrometer analysis
46Atterberg limits
47Natural moisture content
48Bulk density of soil
49Dry density of soil
50Specific gravity
51Direct Shear Test
52Triaxial Shear Test (UD)
53Permeability Test
54Cosolidation Test
55Unconfined compression test
56Swelling pressure test
57Free swell index test
58Shrinkage limit test
59Uniaxial compressive strength of rock sample
60Specific gravity test of rock sample
61PART: ANAGALAND
62Deployment-& Erection of Boring craft & rig in each borehole location as per specifications,. SCC. Scope ofwork. and direction of Engineer-in-charge Note. Ï) Boring depth shall be measured from Ground Level/River Bed level. Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification
63In Land
64In Water
65Conducting Boring at site in soil, as per specification ,SCC ,Scope of work and direction of Engineer-in-charge ,NOTE: i) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification
66In Land
67In Water
68Drilling through rock with Nx size double tube core, barrel up to a depth asSpecified in SCC below GL/bed level using TC bit/diamondbit as per specifications , SC C, Scope of work and direction of Engineer-in-charge . NOTE :i) ) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification
69In Land
70In Water
71Standard penetration test at different depth as per specification,SCC,Scope of work and direction of Engineer-in-charge
72Collection of undisturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge
73Collection of disturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge.
74Sieve analysis
75Hydrometer analysis
76Atterberg limits
77Natural moisture content
78Bulk density of soil
79Dry density of soil
80Specific gravity
81Direct Shear Test
82Triaxial Shear Test (UD)
83Permeability Test
84Cosolidation Test
85Unconfined compression test
86Swelling pressure test
87Free swell index test
88Shrinkage limit test
89Uniaxial compressive strength of rock sample
90Specific gravity test of rock sample
91PART: A MANIPUR
92Deployment-& Erection of Boring craft & rig in each borehole location as per specifications,. SCC. Scope ofwork. and direction of Engineer-in-charge Note. Ï) Boring depth shall be measured from Ground Level/River Bed level. Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification
93In Land
94In Water
95Conducting Boring at site in soil, as per specification ,SCC ,Scope of work and direction of Engineer-in-charge ,NOTE: i) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification
96In Land
97In Water
98Drilling through rock with Nx size double tube core, barrel up to a depth asSpecified in SCC below GL/bed level using TC bit/diamondbit as per specifications , SC C, Scope of work and direction of Engineer-in-charge . NOTE :i) ) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling inwater unless : it is actually carried out in water, iii) Rateshall be inclusiveof grouting back the boreholes as Specifiedincluding cost for material, equipments and Labouriy) Core recovery >25% shall be designated as rockv)Records rig of rock core characteristics shalI be a? per specification
99In Land
100In Water
101Standard penetration test at different depth as per specification,SCC,Scope of work and direction of Engineer-in-charge
102Collection of undisturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge
103Collection of disturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge
104Sieve analysis
105Hydrometer analysis
106Atterberg limits
107Natural moisture content
108Bulk density of soil
109Dry density of soil
110Specific gravity
111Direct Shear Test
112Triaxial Shear Test (UD)
113Permeability Test
114Cosolidation Test
115Unconfined compression test
116Swelling pressure test
117Free swell index test
118Shrinkage limit test
119Uniaxial compressive strength of rock sample
120Specific gravity test of rock sample
121Submission of final technical report, in hard copy (six sets) as well assoft copy (in CD),asper tender specifications and instruction of EIC/ Site Engineer for all States
122PART-B: WEST BENGAL
123Cadestral survey (upto preparation of Schedule u/s 3(1) of P&MPAct ,1962
124Carrying out Cadastral Survey, for laying cross country petroleumpipeline, obtaining/ procuring latest village maps from Revenueauthorities (actual cost incurred on procurement to be reimbursed byowner on reciept of proof of payment), tracing/ scanning the same andstorage in both hard and soft reproducible forms, plotting the pipelineroute on village maps and marking on them the Intermediate Points (IPs)and Turning Points (TPs) of the surveyed route as staked on ground,identification of survey numbers of individual owners and plotting onvillage maps as per latest revenue records, preparation of field bookand computation of area in each plot coming within limits of ROUcorridor, collection of Jamabandi (the record of right holders) fromrevenue authorities in respect of each plot falling within ROU limits and identification of owner and occupier thereof, collection of interimmutations, if any, and incorporation in Jamabandi and other works asper detailed scope of work specified in Special Conditions of Contract(SCC) and specifications of tender documents and direction of Engineer-in-Charge, inclusive of all labour, material, equipment etc.including compensation to farmers on account of any damage to crops,fields etc. while conducting survey through fields, works complete inall respects, upto and including preparation & submission of schedule for 3(1) Notification for establishing right of users (ROU) in Right of Way (ROW) under P&MP Act 1962 for new/additonal pieline ROW, complete in all respects.Integrating cadastral & 3(1) details on Owner\"s Arc GISserver to obtain seamless Geo-referenced data.
125Providing services for establishing Right of Users (ROU) in Right of Way (ROW) under P&MP Act 1962, for laying cross country pipeline including followup for 3(1) Gazette notification, preparation of Erratum & Corrigendum (it required), preparation & serving of 3 (1) notices. facilitating hearing & disposal of objections, preparation of schedule for 6(1) Notification, followup for Gazette notification, preparation of Erratum & Corrigendum, preparation & serving of 6(1) notices, entry of Gazette notification in village records. collection of land rates, calculation of land compensation payable & serving of compensation notices, assistance to Competent Authority in preparation of award to individual landowners etc. as per detailed scope of work specified in special conditions of contract and specifications of tender document and direction of Engineer-in-Charge/ Site Engineer inclusive of all labour, material, equipment etc. complete in all respects. Integration of ROU details on Owners Arc GIS server to obtain seamless geo-referenced data.
126For acquinng ROW of 20 m width for newly proposed pipeline
127OBTAINING APPROVALS / PERMISSIONS FOR PIPELINE CROSSINGS
128Obtaining approvals/ permissions from appropriate respective State! National and other statutory authorities for various pipeline crossings enroute like National Highways, State Highways, other Roads, Railways, River. Canal Drain crossings or any other utility crossings etc as per detailed scope of work specified in Special Conditiosn of Contract (SCC) and specifications of the tender documents and direction of Engineer-in-Charge/ Site Engineer. Integrating all details on Owner\"s Arc GIS (ESRI) server along the entire Pipeline Route \"Note: 1) Payment shall be made for obtaining each permission. Cluster of crossings needing permission from same Authority shall be considered as one permission, for the purpose of payment 2) For Railway crossings. each crossing shall be treated as separate and payment shall be made on unit basis\"
129National Highway Crossings under each authority
130State Highway Crossings under each authority
131Other road crossings under each authority
132Railway Crossings (for each individual crossing)
133River Crossings under each authority
134Canal Crossings under each authority
135Other pipeline crossings and utilities
136Water bodies like ponds. lakes, creek, drains, nalas etc. under each authority
137Forestunder each authority
138PART-B: SIKKIM
139OBTAINING APPROVALS / PERMISSIONS FOR PIPELINE CROSSINGS
140Obtaining approvals/ permissions from appropriate respective State! National and other statutory authorities for various pipeline crossings enroute like National Highways, State Highways, other Roads, Railways, River. Canatl Drain crossings or any other utility crossings etc as per detailed scope of work specified in Special Conditiosn of Contract (SCC) and specifications of the tender documents and direction of Engineer-in-Charge/ Site Engineer. Integrating all details on Owner\"s Arc GIS (ESRI) server along the entire Pipeline Route \"Note: 1) Payment shall be made for obtaining each permission. Cluster of crossings needing permission from same Authority shall be considered as one permission, for the purpose of payment 2) For Railway crossings. each crossing shall be treated as separate and payment shall be made on unit basis\"
141National Highway Crossings under each authority
142State Highway Crossings under each authority
143Other road crossings under each authority
144River Crossings under each authority
145Canal Crossings under each authority
146Other pipeline crossings and utilities
147Water bodies like ponds. lakes, creek, drains, nalas etc. under each authority
148Forest for each state
149PART B:MANIPUR
150OBTAINING APPROVALS / PERMISSIONS FOR PIPELINE CROSSINGS
151\"Obtaining approvals/ permissions from appropriate respective State/ National and other statutory authorities for various pipeline crossings enroute like National Highways. State Highways, other Roads, Railways, River, Canal./ Drain crossings or any other utility crossings etc. as per detailed scope of work specified in Special Conditiosn of Contract (SCC) and specifications of the tender documents and direction of Engineer-in-Charge/ Site Engineer. Integrating all details on Owner\"s Arc GIS (ESRI) server along the entire Pipeline Route\" \"Note: 1) Payment shall be made for obtaining each permission. Cluster of crossings needing permission from same Authority shall be considered as one permission, for the purpose of payment 2) For Railway crossings. each crossing shall be treated as separate and payment shall be made on unit basis\"
152National Highway Crossings under each authority
153State Highway Crossings under each authority
154Other road crossings under each authority
155River Crossings under each authority
156Other pipeline crossings and utilities
157Water bodies like ponds. lakes, creek, drains, nalas etc. under each authority
158Forest for each state
159PART-B NAGALAND
160Cadestral survey (upto preparation of Schedule u/s 3(1) of P&MPAct ,1962
161Carrying out Cadastral Survey, for laying cross country petroleumpipeline, obtaining/ procuring latest village maps from Revenueauthorities (actual cost incurred on procurement to be reimbursed byowner on reciept of proof of payment), tracing/ scanning the same andstorage in both hard and soft reproducible forms, plotting the pipelineroute on village maps and marking on them the Intermediate Points (IPs)and Turning Points (TPs) of the surveyed route as staked on ground,identification of survey numbers of individual owners and plotting onvillage maps as per latest revenue records, preparation of field bookand computation of area in each plot coming within limits of ROUcorridor, collection of Jamabandi (the record of right holders) fromrevenue authorities in respect of each plot falling within ROU limitsand identification of owner and occupier thereof, collection of interimmutations, if any, and incorporation in Jamabandi and other works asper detailed scope of work specified in Special Conditions of Contract(SCC) and specifications of tender documents and direction ofEngineer-in-Charge, inclusive of all labour, material, equipment etc.including compensation to farmers on account of any damage to crops,fields etc. while conducting survey through fields, works complete inall respects, upto and including preparation & submission of schedulefor 3(1) Notification for establishing right of users (ROU) in Right ofWay (ROW) under P&MP Act 1962 for new/additonal pieline ROW, complete inall respects.Integrating cadastral & 3(1) details on Owner\"s Arc GISserver to obtain seamless Geo-referenced data
162\"Providing services for establishing Right of Users (ROU) in Right of Way (ROW) under P&MP Act 1962, for laying cross country pipeline including followup for 3(1) Gazette notification, preparation of Erratum & Corrigendum (if required), preparation & serving of 3 (1) notices, facilitating hearing & disposal of objections. preparation of schedule for 6(1) Notificatin, followup for Gazette notification, preparation of Erratum & Corrigendum. preparation & serving of 6(1) notices. entry of Gazette notification in village records, collection oftarld rates. calculation of land compensation payable & serving of compensation notices, assistance to Competent Authority in preparation of award to individual landowners etc as per detailed scope of work specified in special conditions of contract and specifications of tender document and direction of Engineer•in-Charge/ Site Engineer inclusive of all labour, material. equipment etc complete in all respects. Integration of ROU details on Owners Arc GIS server to obtain scentless gee-referenced data\"
163For acquiring ROW of 20 m width for newly proposed pipeline
164OBTAINING APPROVALS / PERMISSIONS FOR PIPELINE CROSSINGS
165\"Obtaining approvals/ permissions from appropriate respective State/ National and other statutory authorities for various pipeline crossings enroute like National Highways, State Highways, other Roads, Railways, River, Canal! Drain crossings or any other utility crossings etc. as per detailed scope of work specified in Special Conthliosn of Contract (SCC) and specifications of the tender documents and direction of Engineer•in-Charge/ Site Engineer. Integrating all details on Owner\"s Arc GIS (ESRI) server along the entire Pipeline Route\" \"Note 1) Payment shall be made for obtaining each permission. Cluster of crossings needing permission from same Authority shall be considered as one permission, for the purpose of payment 2) For Railway crossings, each crossing shall be treated as separate and payment shall be made on unit basis\"
166NH road crossing under each authority
167State Highway Crossings under each authority
168Other road crossings under each authority
169River Crossings under each authority
170Other pipeline crossings and utilities
171Water bodies like ponds. lakes, creek, drains, nalas etc. under each authority
172Forest for each state
173PART-C: WEST BENGAL
174RoU opening/for entire RoW while laying the pipe line
175Office/ establishment charges per month per camp in any state
176PART-C NAGALAND
177RoU opening/for entire RoW while laying the pipe line

AI Tender Summary

OUR REF NO 31118233
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 09-03-2022
Authority
Authority Name Indradhanush Gas Grid Limited
Work Description Geotechnical Investigation, Cadastral Survey, Providing Services For Establishment Of Rou In Row And Activities Related To Row Opening During Pipeline Construction And Obtaining Permissions For Proposed Negg Pipeline Under Phase-Iii
Basic Detail
Tender No IGGL-100028
Bidding Type Tender
Location
City guwahati
State Assam
Key Dates
Publish Date 25 Feb 2022
Submission Date 09 Mar 2022
Open Date 10 Mar 2022
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 7.97 Lakhs
Exemption Not Available
Document List
11db49e2-3d47-498b-8abe-34eac7d9e0a6.html
BOQ_115531.xls
GCC.pdf
Tender.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Feb 25, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 09, 2022
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 09, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 10, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

11db49e2-3d47-498b-8abe-34eac7d9e0a6.html

xls

BOQ_115531.xls

pdf

GCC.pdf

pdf

Tender.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders