|
| 1 | Civil Works |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m: All kinds of soil. |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 4 | Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete. |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work up to plinth level : |
| 6 | 1:2:4 (1 cement : 2 coarse sand (Zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 7 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : |
| 8 | 1:2:4 (1 cement : 2 coarse sand (Zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level: |
| 10 | Thermo-Mechanically Treated bars. |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form for : |
| 12 | Foundations, footings, bases of columns, etc. for mass concrete. |
| 13 | Brick work withcommon burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: |
| 14 | Cement mortar 1:4 (1 cement : 4 coarse sand). |
| 15 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in: |
| 16 | Cement mortar 1:4 (1 cement : 4 coarse sand). |
| 17 | 12 mm cement plaster of mix : |
| 18 | 1:6 (1 cement: 6 coarse sand). |
| 19 | 12 mm cement plaster finished with a floating coat of neat cement of mix : |
| 20 | 1:3 (1 cement: 3 fine sand). |
| 21 | Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand): |
| 22 | Ordinary cement without any pigment. |
| 23 | Providing and laying Ceramic glazed floor tiles 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick Cement Mortar 1:4 (1 Cement : 4 Coarse sand) including pointing the joints with white cement and matching pigment etc., complete. |
| 24 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 25 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge: |
| 26 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix). |
| 27 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge: |
| 28 | In cement mortar. |
| 29 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. |
| 30 | Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in: |
| 31 | Channels, angles, tees and flats. |
| 32 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. |
| 33 | Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. Pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc complete. |
| 34 | 450 mm dia. R.C.C. pipe. |
| 35 | Structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 36 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 37 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade-Two or more coats on new work. |