Tender For Selection Of Contractor ( S ) For Establishment And Comprehensive Maintenance ( 3 Years ) Of Post Entry Quarantine Facilities For Imported Apple, Walnut, And Other Fruit Plants At 04 Different Locations- Shopian, West Kameng , Shimla And

Issued by Government Departments · Gurugram, Haryana
Tender Value
Ref. Documents
Estimated cost
Bid Submission
21 Mar 2022
0 days left
EMD
50 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Gurugram → Haryana
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Selection Of Contractor ( S ) For Establishment And Comprehensive Maintenance ( 3 Years ) Of Post Entry Quarantine Facilities For Imported Apple, Walnut, And Other Fruit Plants At 04 Different Locations- Shopian, West Kameng , Shimla And Magra Tender For Selection Of Contractor ( S ) For Establishment And Comprehensive Maintenance ( 3 Years ) Of Post Entry Quarantine Facilities For Imported Apple, Walnut, And Other Fruit Plants At 04 Different Locations- Shopian, West Kameng , Shimla And Magra

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 21-Feb-2022 Virtual Pre-bid conference to be held on 22nd February 2022 at 1130 AM in response to the Tender published for selection of Contractors for Establishment and Comprehensive 3 years Maintenance of Post Entry Quarantine Facilities Other 14-Mar-2022
2 25-Feb-2022 Replies to Pre-bid Queries held on 22.02.2022 in response to the Tender for Selection of Contractor(s) for Establishment and Comprehensive Maintenance (3 years) of Post Entry Quarantine (PEQ) Facilities - reg. Date 21-Mar-2022
3 25-Feb-2022 Replies to Pre-bid Queries held on 22.02.2022 in response to the Tender for Selection of Contractor(s) for Establishment and Comprehensive Maintenance (3 years) of Post Entry Quarantine (PEQ) Facilities - reg. Other 21-Mar-2022

BOQ

Name of Work: Establishment and Comprehensive Maintenance (3 years) of Post Entry Quarantine (PEQ) Facilities for imported Apple, Walnut, and other fruit plants at four (04) different locations i.e., Shopian (J&K), West Kameng (Arunachal Pradesh), Shimla (Himachal Pradesh) and Magra (Uttarakhand)Note: The Bidder may submit component-wise quote for single/ multiple locations in the format given below. Bidder may especially refer Para No.10.2 at page no.7 of Tender Document before submitting the financial bid
Sl. No. Item Description
1Location -1: Advance Centre of Excellence for Horticulture at Zainapora in Distt.- Shopian (J&K) (Area – 20 Ha.)
2Fencing
3Chain linked fencing of the required area
4Fixation of Green net cover up to 3 meter all over the fencing.
5Land development, internal road (minimum as per the requirement of project), retaining wall, drainage system contouring etc.
6Working shed
7Administrative & Ancillary Civil structure with one in lavatory /Committee room
8Cold Chamber for planting material
9Saw Dust Machine 1 to 10 TPH
10Water Storage structure
11Drip irrigation system for open field
12Irrigation source (bore well with 5 HP pump motor with other accessories and water discharge pipe 1.25 inch etc.)
13Hi-tech Green House - Area 500 m2 each
14Electricity supply 3 phase (including transformer)
15Grafting machine (Approx. 300 grafts/hour)
16Nursery Management Tools – as per requirement
17Power backup facility, Generator capacity 62.5 KVA with automatic on/off panel
18Comprehensive Maintenance Contract for 3 years after completion of the project and Training of Departmental staff.
19Govt. Horticulture Garden Magra, Tehri Garhwal, (Uttrakhand). (Area – 14 Ha.)
20Fencing
21Chain linked fencing of the required area
22Fixation of Green net cover up to 3 meter all over the fencing.
23Land development, internal road (minimum as per the requirement of project), retaining wall, drainage system contouring etc.
24Working shed
25Administrative & Ancillary Civil structure with one in lavatory /Committee room
26Cold Chamber for planting material
27Saw Dust Machine 1 to 10 TPH
28Water Storage structure
29Drip irrigation system for open field
30Irrigation source (bore well with 5 HP pump motor with other accessories and water discharge pipe 1.25 inch etc.)
31Hi-tech Green House - Area 500 m2 each
32Electricity supply 3 phase (including transformer)
33Grafting machine (Approx. 300 grafts/hour)
34Nursery Management Tools – as per requirement
35Power backup facility, Generator capacity 62.5 KVA with automatic on/off panel
36Comprehensive Maintenance Contract for 3 years after completion of the project and Training of Departmental staff.
37Location-3:Seed Potato Farm, Dhurla, Gram Panchayat, Makroj Establishment, Chaupal, Distt.- Shimla (HP) (Area – 14 Ha.)
38Fencing
39Chain linked fencing of the required area
40Fixation of Green net cover up to 3 meter all over the fencing.
41Land development, internal road (minimum as per the requirement of project), retaining wall, drainage system contouring etc.
42Working shed
43Administrative & Ancillary Civil structure with one in lavatory /Committee room
44Cold Chamber for planting material
45Saw Dust Machine 1 to 10 TPH
46Water Storage structure
47Drip irrigation system for open field
48Irrigation source (bore well with 5 HP pump motor with other accessories and water discharge pipe 1.25 inch etc.)
49Hi-tech Green House - Area 500 m2 each
50Electricity supply 3 phase (including transformer)
51Grafting machine (Approx. 300 grafts/hour)
52Nursery Management Tools – as per requirement
53Power backup facility, Generator capacity 62.5 KVA with automatic on/off panel
54Comprehensive Maintenance Contract for 3 years after completion of the project and Training of Departmental staff.
55Location-4:State Horticulture Farm, Shergaon, Distt.- West Kameng (Arunachal Pradesh)(Area - 5.00 Ha)
56Fencing
57Chain linked fencing of the required area
58Fixation of Green net cover up to 3 meter all over the fencing.
59Land development, internal road (minimum as per the requirement of project), retaining wall, drainage system contouring etc.
60Working shed
61Administrative & Ancillary Civil structure with one in lavatory /Committee room
62Cold Chamber for planting material
63Saw Dust Machine 1 to 10 TPH
64Water Storage structure
65Drip irrigation system for open field
66Irrigation source (bore well with 5 HP pump motor with other accessories and water discharge pipe 1.25 inch etc.)
67Hi-tech Green House - Area 500 m2 each
68Electricity supply 3 phase (including transformer)
69Grafting machine (Approx. 300 grafts/hour)
70Nursery Management Tools – as per requirement
71Power backup facility, Generator capacity 62.5 KVA with automatic on/off panel
72Comprehensive Maintenance Contract for 3 years after completion of the project and Training of Departmental staff.

AI Tender Summary

OUR REF NO 31102056
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 21-03-2022
Authority
Authority Name National Horticulture Board
Work Description Tender For Selection Of Contractor ( S ) For Establishment And Comprehensive Maintenance ( 3 Years ) Of Post Entry Quarantine Facilities For Imported Apple, Walnut, And Other Fruit Plants At 04 Different Locations- Shopian, West Kameng , Shimla And Magra Tender For Selection Of Contractor ( S ) For Establishment And Comprehensive Maintenance ( 3 Years ) Of Post Entry Quarantine Facilities For Imported Apple, Walnut, And Other Fruit Plants At 04 Different Locations- Shopian, West Kameng , Shimla And Magra
Basic Detail
Tender No NHB/PEQ/Tender/2022
Bidding Type Tender
Location
City Gurugram
State Haryana
Key Dates
Publish Date 25 Feb 2022
Submission Date 21 Mar 2022
Open Date 22 Mar 2022
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 50 Lakhs
Exemption Not Available
Document List
3dfab7e2-2f19-4d49-98d3-bc0255deeec5.html
BidDocumentPEQfacility.pdf
BOQ_708955.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Feb 25, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 14, 2022
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 21, 2022
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 21, 2022
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 21, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 22, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

3dfab7e2-2f19-4d49-98d3-bc0255deeec5.html

pdf

BidDocumentPEQfacility.pdf

xls

BOQ_708955.xls

pdf

Tendernotice_1.pdf