Supply Installation Testing Commissioning Sitc, O And M And Amc Of Intelligent Traffic Management System Itms In Srinagar City. Sitc, O And M And Amc Of Intelligent Traffic Management System Itms In Srinagar City.
Tender Overview
Project Description
Supply Installation Testing Commissioning Sitc, O And M And Amc Of Intelligent Traffic Management System Itms In Srinagar City. Sitc, O And M And Amc Of Intelligent Traffic Management System Itms In Srinagar City.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 24-Feb-2022 | Pre Bid Meeting Video Conference Link | Other | 05-Mar-2022 |
| 2 | 28-Feb-2022 | Corrigendum No 01 (updated Bank Details) | Technical Bid | 05-Mar-2022 |
| 3 | 28-Feb-2022 | Corrigendum no 02 | Technical Bid | 05-Mar-2022 |
| 4 | 28-Feb-2022 | Response to Queries etc | Other | 05-Mar-2022 |
| 5 | 28-Feb-2022 | Documents to be submitted along with the Bid | Technical Bid | 05-Mar-2022 |
| 6 | 28-Feb-2022 | Replies to Pre-Bid Queries | Other | 05-Mar-2022 |
BOQ
| Sl. No. | Item Description |
| 1 | CAPEX COST |
| 2 | SITC of following ITMS Field Components: |
| 3 | ANPR (IR included) Camera |
| 4 | PTZ Camera |
| 5 | RLVD (IR included) Camera |
| 6 | Analytics Camera (Box/Bullet) |
| 7 | Cost per switch ( 8 port)- L2 Industrial Grade with housing and SFP\"s |
| 8 | Cost per switch ( 24 port)- L2 Industrial Grade with housing and SFP\"s |
| 9 | Aggregation Router |
| 10 | Pre-Aggregation Router |
| 11 | Junction BOX with Passive cablingsincludes with 50MM HDPE Pipe ,UTP Cables and Power cables with 5% in buffer |
| 12 | Junction box Online UPS System (3KVA and 2 Hour backup), Power cablingRacks , Fitting , gantry and patch panels etc |
| 13 | UPS at Aggregation and Pre-Aggregation Junctions |
| 14 | PA system IP Based (pairs) |
| 15 | Civil work at per Junction, including L-Shape Pole and other accessories, GI Cantilever, Lightning Arrestor at pole with 10% buffer |
| 16 | SITC of following Infra to be deployed within ICCC |
| 17 | VMS Software |
| 18 | VMS Camera License |
| 19 | Video Analytics License as follows: |
| 20 | Wrong Direction Driving |
| 21 | No Helmet |
| 22 | No Seat Belt |
| 23 | Triple Riding on Two wheelers |
| 24 | Mobile Phone use while driving |
| 25 | Face Recognition |
| 26 | SVD |
| 27 | ITMS Software & Licenses |
| 28 | VMS DB Server |
| 29 | VMSRecording Server |
| 30 | VMSManagement server |
| 31 | Video Analytics Servers |
| 32 | NMS/EMS/PA system Server |
| 33 | Storage - 2 PB |
| 34 | EMS Solution |
| 35 | Digital Key-Board (joystick) and all accessories compatible with P/T/Z cameras. |
| 36 | NMS for City Network & IE Switches |
| 37 | PC Workstation for viewing, monitoring and system management including 24\" 4K UHD LED monitors, all |
| 38 | IP Phones |
| 39 | Civil Works and SITC of components at Police HQ: |
| 40 | Design and Construction of Control Centre Building at SSP Office, Srinagar, including all Civil, Electrical, Sanitary, Plumbing, Air-conditioning and allied works. (The building shall have a Stilt Floor and a First Floor having approx. floor area of 2500 Sq. ft. and will be constructed as RCC framed structure). The Job includes all types of surveys, planning, designing, preparation of drawings, procurement, and construction activities. The designs and drawings shall be got approved from the Employer before execution of works. The cost shall include vetting of structural designs by third party accredited agency approved by the Employer. |
| 41 | SITC of following Infra to be deployed PHQ |
| 42 | Digital Key-Board (joystick) and all accessories compatible with P/T/Z cameras. |
| 43 | 24 Port switch at Police HQ |
| 44 | PC Workstation for viewing, monitoring and system management including 24\" 4K LED monitors, all |
| 45 | Police HQ UPS-5 KVA +2 hrs backup |
| 46 | Supply of 55\" LED screens for monitoring centers |
| 47 | Air Conditioner At HQ Police |
| 48 | MFD |
| 49 | IP Phones with licenses |
| 50 | E-Challan Handheld device |
| 51 | OPEX COST |
| 52 | Operation and Maintenance Costsfor 3 years: |
| 53 | 1st Year |
| 54 | 2nd Year |
| 55 | 3rd Year |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-6 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed