| 1 | CONSTRUCTION OF PAVER BLOCKEarth work in exacation by mechinical means (Hydraulic excavator) manual means over areas (exceeding 30 cm in depth, 1.5 M in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5M, as directed by E/I. |
| 2 | Providing local coarse clean sand filling in foundation trenches ---do---do---- all complete job as per specification and direction of E/I. |
| 3 | Providibg designation 75A brick flat solling in road embankment joint filled with local Sand including cost of watering taxes royality all complete as per specification and direction of E/I. |
| 4 | Providing PCC M-150 in nominal of (1:2:4) in road embankment with stone chips do-----do------- All complete job as per specification and direction of E/I. |
| 5 | Providing and laying factory made chamfered edge cement concrete paver block in foot path, park & lawns driveway or light & traffic parking etc of requaired strength, thickness & size/shape, made by table vibrotary method using PU mould, laid in required colour and patern over 50mm thick compact bed of course sand, compacting and proper embeding/laying of inter locking paver blocks into the sand bedding layer through vibrotary compacting.....do......do all complete as per manufacture specification and direction of E/I. |
| 6 | Construction of RCC Drain & SlabSite Clearance by manual labour ….do…………do all complete as per direction of E/I. |
| 7 | Dismanteling pucca bricks or lime work including stacking servicable materials in countable stacks within 15M. Lead and disposal of unservicable materials with all leads all complete as per direction of E/I. |
| 8 | Dismanteling plain cement or lime concrete work including complete as per direction of E/I. |
| 9 | Providing local course clean sand filling in foundation trenches -----od-------do------- all complete as per direction of E/I. |
| 10 | Providibg designation 75A one brick flat solling joint filled with local Sand do…….….do………... all complete as per specification and direction of E/I. |
| 11 | Providing RCC M-150 with nominal mix of (1:2:4) wall designd size with approved quality of stone chips ---do-----do---- all complete as per direction of E/I. |
| 12 | Providing Tor Steel reinforcement of 10 mm dia bars as per approved design and drawing ----do------do------ all complete as per direction of E/i. |
| 13 | Providing RCC M-150 with nominal mix of (1:2:4) slab desired size with approved quality of stone chips ---do-----do---- all complete as per direction of E/I. |
| 14 | Providing Tor Steel reinforcement of 10 mm dia bars as per approved design and drawing ----do------do------ all complete as per direction of E/i. |
| 15 | Construction of PCC roadSite Clearance by manual labour ….do…………do all complete as per direction of E/I. |
| 16 | Construction of GSB by providing well graded materials, mixing in a machenical mix plant at OMC, carriage of mixed materials to work site upto lead of 1000 m spreading in uniform layers with motor grader on prepared surface and compacting with smooth wheel roller to achieve the desired density, complete as per direction of E/I. |
| 17 | Providing Separation Membrance of impermeable plastic sheeting 125 micron thick all complete as per building specification and direction of E/I. |
| 18 | Providing PCC M-150 in nominal of (1:2:4) in road embankment with stone chips …..do….do…….All complete job as per specification and direction of E/I. |
| 19 | Filling in foundation trenches and plinth in layers not exceeding 150 mm thick wellwatered, rammed, fully compacted and fine dressed with earth obtained after cutting within a lead of 50 ltl and lift of 1.5 M all complete as per direction of E/I. |
| 20 | Carriage of MaterialsCement |
| 21 | Sand |
| 22 | Stone Chips |
| 23 | Steel |
| 24 | GSB |
| 25 | Paver Block |
| 26 | Bricks |
| 27 | Goods & Service Tax (G.S.T.) - |
| 28 | Labour Cess - |