Augmentation / Modification Of Subhash Park New Bps By Replacement Of Old Horizontal Split Casing P / Set No. 04 Along With Allied Equipments-Augumentation / Modification Of Subhash Park New Bps By Replacement Of Old Horizontal Split Casing P / Set , Delhi-Delhi

Delhi Jal Board-DJB has published Augmentation / Modification Of Subhash Park New Bps By Replacement Of Old Horizontal Split Casing P / Set No. 04 Along With Allied Equipments-Augumentation / Modification Of Subhash Park New Bps By Replacement Of Old Horizontal Split Casing P / Set . Submission Date for this Tender is 18-02-2022. Forming Tools Tenders in Delhi Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

31071193
Augmentation / Modification Of Subhash Park New Bps By Replacement Of Old Horizontal Split Casing P / Set No. 04 Along With Allied Equipments-Augumentation / Modification Of Subhash Park New Bps By Replacement Of Old Horizontal Split Casing P / Set
Open Tender
Indian
Delhi
Delhi
18-02-2022

Tender Details

Augmentation / Modification Of Subhash Park New Bps By Replacement Of Old Horizontal Split Casing P / Set No. 04 Along With Allied Equipments-Augumentation / Modification Of Subhash Park New Bps By Replacement Of Old Horizontal Split Casing P / Set No. 4. Along With Allied Equipments.S / O Horizontal Split Casing Centrifugal Pump With Impeller ( Lg2 ) And Neckring ( Bb ) And Casing ( Ci ) Shaft And Sleeve ( Ss-410 ) In Fitted Condition With Suitable Bearings Along With Ie2 Rating Tefc Motor. The Pump And Motor Coupled On M.S. Base Frame With Coupling And Coupling Guard.Duties Of Pump: Head – 45 Mtrs, Discharge:- 600 M3 / Hr. , Eff:- 86%, Rpm-1485, Suction / Delivery Size – 250Mmx200mmmotor Ratings:-150 Hp, Pole:-4, Rpm:-1485 Rpmmake Of Pump: Wilo And Mather+Platt. / Equivalent In Kbl / Djb Approved Makemake Of Motor:- Cg / Abb / Kirloskar / Djb Approved Make 2 Supply Of Suitable Fully Automatic Ats Starter For The Above Motor Including All Electrical Items Required For Installation Of This Starter With Motor. Rating For Starter : Atleast 250 Hp. Make: L&T / Schneider / Advance / Djb Approved Make 3 Closing Of Suction & Delivery Side Sluice Valves And Providing / Fixing Of Blind Flanges Of Suitable Size For Stopping The Water Leakage On Delivery And Main Header With The Help Of Proper Logistics Arrangement And Shifting The Same At Safe Place For Making The Site Workable. 4 Dismantling Of P / Set I.E. Pump And Motor From Foundation By Disconnecting Electric Connection, Removing Of Coupling Etc. By Cutting Of Nut & Bolts With The Help Of Gas Cutter And Man Power Etc. As Required And Dismantling Of Old Liquid Resistance Starter Including Removing All Electric Connections By Taking Proper Safety Precautions Including Any Manual Labour As Per Site Requirement. 5 Removing Theexisting Damaged M.S. Base Frame From The Foundation By Cutting Of Nut & Bolts With The Help Of Gas Cutter And Man Power Etc. As Required. 6 Breaking Of C.C. Foundation With Man Power And With The Help Of Pneumatic Hammer I / C Taking Out The Existing Damaged Foundation Bolt Etc. 7 Making Of New C.C. Foundation With Suitable Ratio Of Gravels, Sand And Cement As Per Standard Size Suitable For Above P / Set I / C Complete Finishing Etc. As Required. 8 Fabrication & Supply Ofms Reducer 500 Mm X 250 Mm Having Thickness 8Mm And Both Side Flanges Of 16Mm Thickness. As Site Requirement 9 Fabrication & Supply Ofms Reducer 300 Mm X 200 Mm Having Thickness 8Mm And Both Side Flanges Of 16Mm Thickness. As Site Requirement 10 Supply Of Neoprene Rubber Packing Sheet As Per Site Requirement.Isi Marked 11 Supply Of M.S Nut Bolts Washer As Per Site Requirement.Isi Marked 12 Installation Of The Above New Starter Including Fixing Of Starter At Proper Base As Per Directions Of Engineer In Charge, Making Proper Electric Connections To The Motor And Panel As Required While Taking All Safety Precautions Including Any Minor Civil Work Required Complete With Proper Finishing 13 Cleaning The Surface Ofpipe, Specials, Valves Etc, With Wire Brush And Ambry Paper And Painting The Complete Installation With Two Or More Coats Of Synthetic Enamel Paints After A Coat Of Steal Primer. 14 Installation Of Above 150 Hp Motor And Pump Along With The Ms Base Frame On Cc Foundation, The Job I / C Installing And Fixing Reducers On Both Sides, Fixing With Proper Alignment, Cartage , Taking All Safety Precautions Arranging All Tools & Tackles Etc. And Fixing Of Coupling Guardand Connection The Motor From Panel / Starter, Consumable Items, Testing And Commissioning The Pump Set After Checking The System Both Electrical And Mechanical On Full Loadin The Supervision Of Engineer In- Charge At Site. This Is A Turnkey Joband It Further Includesany Left Out Items Which May Be Required During Execution Of Work Will Be Firm Responsibility & No Extra Payment Will Be Paid. 15 Testing And Commissioning Of Above Newly Installed System, At No Load And At Full Load, While Taking All Safety Precautions And As Per Satisfaction Of Engineer In Charge 16 Cartage / Shifting The Pump & Motor From Tempo To Pump House Base Framewith Mannual Heavy Labour

Key Value

Document Fees
INR 500 /-
EMD
INR 33100.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:Augmentation/Modification of Subhash Park New BPS by replacement of old Horizontal split casing p/set No. 04 along with allied equipments
Sl. No. Item Description
1Augumentation / Modification of Subhash Park New BPS by replacement of old Horizontal split casing p/set No. 4. along with allied equipments. S/o Horizontal split casing Centrifugal pump with impeller (LG2) and neckring (BB) and casing (CI) shaft and sleeve (SS-410) in fitted condition with suitable bearings along with IE2 rating TEFC motor. The pump and motor coupled on M.S. Base frame with coupling and coupling guard. Duties of Pump: Head – 45 mtrs, Discharge:- 600 m3/hr. , Eff:- 86%, RPM-1485, Suction/Delivery Size – 250mmX200mm Motor ratings:-150 HP, Pole:-4, RPM:-1485 rpm Make of pump: Wilo and Mather+Platt./ equivalent in KBL / DJB approved make Make of motor:- CG/ABB/ Kirloskar/ DJB approved make
2Supply of suitable fully automatic ATS starter for the above motor including all electrical items required for installation of this starter with motor. Rating for starter : atleast 250 HP. Make: L&T/ Schneider/ Advance/ DJB approved make
3Closing of suction & delivery side sluice valves and providing /fixing of blind flanges of suitable size for stopping the water leakage on delivery and main header with the help of proper logistics arrangement and shifting the same at safe place for making the site workable.
4Dismantling of p/set i.e. pump and motor from foundation by disconnecting electric connection, removing of coupling etc. by cutting of nut & bolts with the help of gas cutter and man power etc. as required and dismantling of old liquid resistance starter including removing all electric connections by taking proper safety precautions including any manual labour as per site requirement.
5Removing theexisting damaged M.S. base frame from the foundation by cutting of nut & bolts with the help of gas cutter and man power etc. as required.
6Breaking of C.C. foundation with man power and with the help of pneumatic hammer i/c taking out the existing damaged foundation bolt etc.
7Making of new C.C. foundation with suitable ratio of gravels, sand and cement as per standard size suitable for above p/set i/c complete finishing etc. as required.
8Fabrication & supply ofMS Reducer 500 mm X 250 mm having thickness 8mm and both side flanges of 16mm thickness. as site requirement
9Fabrication & supply ofMS Reducer 300 mm X 200 mm having thickness 8mm and both side flanges of 16mm thickness. as site requirement
10Supply of neoprene rubber packing sheet as per site requirement.ISI marked
11Supply of M.S Nut bolts washer as per site requirement.ISI marked
12Installation of the above new starter including fixing of starter at proper base as per directions of engineer in charge, making proper electric connections to the motor and panel as required while taking all safety precautions including any minor civil work required complete with proper finishing
13Cleaning the surface ofpipe, specials, valves etc, with wire brush and ambry paper and painting the complete installation with two or more coats of synthetic enamel paints after a coat of steal primer.
14Installation of above 150 HP motor and pump along with the MS base frame on CC foundation, the job i/c installing and fixing reducers on both sides, fixing with proper alignment, cartage , taking all safety precautions arranging all tools & tackles etc. and fixing of coupling guardand connection the motor from panel / starter, Consumable items, testing and commissioning the pump set after checking the system both electrical and mechanical on full loadin the supervision of engineer in- charge at site. This is a turnkey joband it further includesany left out items which may be required during execution of work will be firm responsibility & no extra payment will be paid.
15Testing and commissioning of above newly installed system, at no load and at full load, while taking all safety precautions and as per satisfaction of engineer in charge
16Cartage/Shifting the pump & motor from tempo to pump house base framewith mannual heavy labour
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail