Construction C / O Collection Centre At Soda Dhayadhi, Distt. Sirmour, H.P. C / O Collection Centre At Soda Dhayadhi, Distt. Sirmour, H.P.
Tender Value
4.90 Lakhs
Estimated cost
Bid Submission
25 Feb 2022
0 days left
EMD
9900
Bank guarantee accepted
Document Fee
413
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
sirmour → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction C / O Collection Centre At Soda Dhayadhi, Distt. Sirmour, H.P. C / O Collection Centre At Soda Dhayadhi, Distt. Sirmour, H.P.
BOQ
| Sl. No. | Item Description |
| 1 | Cutting in earth work in by mechanical means all heights and depths in all kinds of soils, including saturated soils comprising of pick work , Jumper work and blasting workboth in soft and hard rock with chiseling and wedging out of rock (Where blasting is prohibited) and their intermediate classificationof soil including, dewatring where required, setting out to required lines, levels as shown on the drawing and directed by the Engineer-in - charge at site,according to the HP.PWD. specification of 1990( One Thousand Nine Hundred ninety) Volume-I (One)and sorting out useful and unuseful matreial and Transportation of the unuseful matreial for disposing at dumping site ( To be arranged by the Contractor) as per satisfacation of Engineer -in- Charge through all modes of transportationincluding head load , animal load or mechnical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the workby mechnical means and labour( If required). All useful material such as stone , shingles aggregate and slates Shall be properly Stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation as per direction of the Engineer -in -charfe .Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have tobe duly compensated by him in all respects including all incidental charges. |
| 2 | Excavation in foundation and trenches in earth work in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock, with chiseling and wedging out of rock;(where blasting is prohibited) and their intermediate classification of soils including ,dewatering including pumping or bailing out of water wherever required, setting out to required lines, levels as shown on the drawing and as directed by the Engineer-in- Charge at site, according to the H.P.PWD. specification of 1990 (One thousand Nine hundred Ninety) Volume-I and sorting outuseful & unuseful materials andstackingthe same in all leads and lifts and transportation of theunuseful materialson approved dumping sites through all modes of transportation including head load, animal load or mechanical means along with its leveling fine dressing and all labour, machineries, materials, tools equipments and safety measures and iincidentials necessary to complete the work by mechanized means and labour (if any required) . All usefull materials, such as stones, shingles, aggregate andslates shall be sortedto the maximum possible extentin all leads and lifts through all modes of transportation. Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects, including all iincidential charges. |
| 3 | Providing and laying cement concrete 1:6:12 (1 cement:6 sand : 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of centring and shuttering in Foundation and plinth:as per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-in-chargeincluding carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government |
| 4 | Stone fillingunder floor dry hand packed with hard stone of approved quality consolidated properly with hand or mechanical hammer to required level as perHP.PWD specification 1990 Volume-1 including carriage of materials, labour tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge. |
| 5 | Providing and laying cement concrete 1:4:8 (1 cement:4 sand :8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of centring and shuttering in Foundation and plinth:as per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-in-chargeincluding carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government |
| 6 | Providingform work with steel plates 3.15mm(threepoint one fivemillimeters) thick,welded with angle iron in frame30x30x5mm(thirty into thirty into five millimeters),so as to give a fair finishincluding centering ,shuttering, strutting andpropping etceterawith wooden battens and ballies, height of propping and centering in all heights belowsupporting floor to ceiling and removal of the same for in situ reinforced concrete and plain concrete workin foundation, footing, basis of column etcetra . and massconcrete complete as per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-in-chargeincluding carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government |
| 7 | Providingform work with steel plates 3.15mm(threepoint one fivemillimeters)thick welded with angle iron in frame 30x30x5mm(thirty into thirty into five millimeters),so as to give a fair finishincluding centering ,shuttering, strutting andpropping etceterawith wooden battens and ballies, height of propping and centering in all heights belowsupporting floor to ceiling and removal of the same for in situ reinforced concrete and plain concrete workin flat surfaces such as soffits of suspended floors, roofs, landings , shelves andthe like floor etcetra .upto anythicknessupto all floor level as per HP.PWD.specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-in-chargeincluding carriage of materialswithin all leads and liftsand other incidentals..The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government |
| 8 | Providingform work with steel plates 3.15mm(threepoint one fivemillimeters)thick welded with angle iron in frame 30x30x5mm(thirty into thirty into five millimeters),so as to give a fair finishincluding centering ,shuttering, strutting andpropping etceterawith wooden battens and ballies, height of propping and centering in all heights belowsupporting floor to ceiling and removal of the same for in situ reinforced concrete and plain concrete work in Columns, pillars post and struts (square rectangular or polygonal in plain in any heights / thickness/depths etcetera upto all foor level as per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-in-chargeincluding carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government |
| 9 | Providingform work with steel plates 3.15mm(threepoint one fivemillimeters)thick welded with angle iron in frame 30x30x5mm(thirty into thirty into five millimeters),so as to give a fair finishincluding centering ,shuttering, strutting andpropping etceterawith wooden battens and ballies, height of propping and centering in all heights belowsupporting floor to ceiling and removal of the same for in situ reinforced concrete and plain concrete work in Beams, cantilevers, girders and lintels, sides of soffits of beams, beams haunchings, girders, cantilevers, bressumers and lintels uptoanydepth /heights upto all floor levelas per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-in-charge including carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government |
| 10 | Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in:Edges of slabs and breaks in floors and walls:Under 20 cm. wide as per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-in-chargeincluding carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government |
| 11 | P/L reinforced cement concrete 1:1½:3( one cement : one and half sand : threegraded crushed hard stone aggregate 20 mm (twenty milimeter) nominal size) ,mechanically mixed vibrated and curing complete excluding cost of form work and reinforcement for reinforced concrete work as per H.P. PWD. Specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all iincidential charges. inFoundations,footings bases of columns and the like and mass concrete. |
| 12 | P/L reinforced cement concrete 1:1½:3( one cement : one and half sand : threegraded crushed hard stone aggregate 20 mm (twenty milimeter) nominal size) ,mechanically mixed vibrated and curing complete excluding cost of form work and reinforcement for reinforced concrete work as per H.P. PWD. Specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all iincidential charges. in Suspended Floor roofs, landing and shelves and their support balconies,beams, girders,bressumers and contilever upto floor two level |
| 13 | P/L reinforced cement concrete 1:1½:3( one cement : one and half sand : threegraded crushed hard stone aggregate 20 mm (twenty milimeter) nominal size) ,mechanically mixed vibrated and curing complete excluding cost of form work and reinforcement for reinforced concrete work as per H.P. PWD. Specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all iincidential charges. inColumns, pillars posts and struts upto floor two level. |
| 14 | Providing and laying tor steel reinforcementTATAsail Rashtrya Ispat or its substantial equivalentmake for reinforced cement concrete work including bending, binding, cutting ,straightingand placing in position including cost ofbinding wirecompleteuptoall floor levelas per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-in-chargeincluding carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government |
| 15 | Brick work using Second class common burnt clay building bricks in super structure above plinth level in all floors up to all heights and levels in cement mortar 1:6(One cement isto Six sand) as per HP.PWD specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour equipment and material to various location through all modes of transportation in all leads and lifts, including all iincidential charges.The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government |
| 16 | Providing and fixing angle iron door window clerestory window frame manufactured from steel iron section of 40x40x6mm thickness including hinges jamb lock jamb beed and if required angle thrashold of mild steel angle 50x25 mm welded or rigidly fixed by mechanical means lugs with split end tails to each jamb including steel butt hinges 2.5 mm thick with provision for locking arrangement and shock absorber as specified and applying a coat of approved ateel primer after preteatment of the surface as directed by Engineer-in- Charge. including carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Governmentl. 100x 10mm (onehundred into tenmillimeter). |
| 17 | Providing and fixing 1 mm thick M.S sheet garrage door with frame of 40 mmx40mmx6mm angle iron 3.15 mm M.S gusset plates at the junctions and corners all necessary fittings complete including applying a priming coat of red lead paint Using M.S angle 40 mmx40mmx6mm for diaganal braces, including carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Governmentl. 100x 10mm (onehundred into tenmillimeter). |
| 18 | Providing 40x3 mm flat iron hold fast 40cm. Long including fixing to frame with 10mm diameter bolts & nuts and wooden plugs and embeding in cement concrete block 30x10x15cm. 1:3:6 ( 1 cement : 3 sand: 6 graded stone aggregate 20mm nominal size) as per HP.PWD specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour equipment and material to various location through all modes of transportation in all leads and lifts, including all iincidential charges.The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government. |
| 19 | Supplying and fixing rolling shutters of approved make made of 80 mm x 0.80 mmGalvanised MS laths interlocked together through their entire length and joined together at the end by end locks mounted on specially designed pipe shaft with brackets side guides and arrangements for inside and outside locking with push pull operation complete but excluding the cost of the top cover and springshutter having width below 3.5 metreincluding carriage of material within all leads and lifts as per direction of Engineer-in-charge. |
| 20 | Providing and fixing top cover for rolling shutters Shutters having width below 3.5 metreincluding carriage of material within all leads and lifts as per direction of Engineer-in-charge. |
| 21 | Providing and fixing ball bearing for rollingshutters, including carriage of material within all leads and lifts as per direction of Engineer-in-charge. |
| 22 | Providing and fixing 27.5 cm longwire spring grade No. 2 for rolling shutterincluding carriage of material within all leads and lifts as per direction of Engineer-in-charge. |
| 23 | Cement concrete flooring 1:2:4 (1cement :2 sand :4 graded stone aggregate 20 mm nominal size) laid in one layer finished with a floating coat of neat cement 50mm thickincluding carriage of material within all leads and lifts as per direction of Engineer-in-charge. |
| 24 | 6 mm. (six milimeter) thick cement plaster in cement mortar 1:3(one cement : three sand)in ceiling an soffits of stairs as per H.P. PWD. Specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all iincidential charges |
| 25 | 15 (Fifteen) millimeters thick cement plaster in single coat on the rough side of brick/concrete/ stone walls for interior plastering up to all heights including arises. Internal rounded angles, chamfers and/or rounded angles not exceeding 80 (Eighty) millimeters in girth and finished even and smooth in cement mortar 1:6(One cement: Six sand)as per H.P. PWD. Specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One),including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all iincidential charges.The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government |
| 26 | 15 (Fifteen) millimeters thick cement plaster in single coat on the fair side of brick/concrete/ stone walls for interior plastering up to all heights including arises. Internal rounded angles, chamfers and/or rounded angles not exceeding 80 (Eighty) millimeters in girth and finished even and smooth in cement mortar 1:6(One cement: Six sand)as per H.P. PWD. Specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all iincidential charges |
| 27 | Distempering (two or more coats)with oil bound washabledistemper of Asian /Nerolacapproved brand and manufacture and of required shade on undecorated wall surfaces to give an even shade over and including priming coat of distemper primer of approved brand and manufactureafterthoroughly brushing the surface free from mortar droppings and other foreign matter including preparing the surface even and sand papered smooth priming coat with distemper primer upto all floor levelcompleteas per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-in-chargeincluding carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government |
| 28 | Finishing wallwith weather proof exterior gradeemulsion of approved design (Apexultima) of Asian paints/Nerolac paints or its equarlied brand and manufacture ofapproved shadeon undecorated concrete / stone / plastered wall surfaces with two coats to give an even shade andfinal finish afterthoroughly cleaning / brushing the surfaces free from alldirt, dustmortar dropping and other foreign matter and sand papered smooth including applyingof puttyas required for making the surfaces upto all floor levelcompleteas per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-in-chargeincluding carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the govt. |
| 29 | Painting two costs (excluding priming cost on new steel and other metal surfaces with enamel paint other than white brushing to give an even shade including cleaning the surface of all dirt,dust and other foregin matter paint complete as per HP.PWD., Specifications of 1990 volume-I includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge. |
| 30 | Stone filling behind abutment, wing wall and return wall , retaining walls complete as per drawings and technical specification as per the entire satisfaction and directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
AI Tender Summary
Tender Timeline
Feb 11, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedFeb 25, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedFeb 28, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender