|
| 1 | Brick work with common burnt clay (non-modular) bricks of class designation 7:5 in foundation and plinth including curring in : Cement mortar 1:6 (1 Cement : 6 Coarse sand) |
| 2 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level |
| 3 | Reinforced cement concrete work in beams, suspended floor, roofs having slope upto 15*, landings, balconies shelves, chajjas, lintles, bands, plain window sills, staricases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering finishing and reinformcement with (1Cement :11/2 Corse sand : 3 graded stone aggregrate 20 mm nominal size). |
| 4 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering finishing and reinformcement (1 cement : 1 1/2 coarse sand : 3 graded stone aggregrate 20 mm nominal size) |
| 5 | Centering and shuttering including strutting, propping etc and removal of form work for |
| 6 | Columns, pillars piers abutments, posts and struts |
| 7 | Suspended floors, roofs, landings balconies and platforms |
| 8 | Lintel, beams, plinth beams, girders, bressumers and cantilevers |
| 9 | Steel reinformcement for RCC work including straigthening cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars Hot rolled deformed bars |
| 10 | Providing wood work in frames of doors, windows, clerestory, windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasterners of required dia and length (hold fast lugs or with dash fasterns shall be paid for serparetly)First Class deodar wood |
| 11 | Carriage of materials by mechanical transport upto site of work including loading, unloading and stacking |
| 12 | Bricks from Vijaypur 25 km avg |
| 13 | 20 mm Bajri from avg 10 km Nagrote |
| 14 | Sand from Nagrota avg. 10 km |
| 15 | Engaging labours for maintance of lawn clearing grass and debris etc from premises and slab roof incl engagement of mali for up keeping of lawn, plantation and flowers. * |