Heavey Water Board-HWB has published Hot Insulation Works In Xu-1 And 2, Lpg, Isg And Flare Stack Areas At Main Plant Of Hwpm. Submission Date for this Tender is 23-02-2022. Insulation work Tenders in manuguru Telangana. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Item-1 (upto 25 Mtrs height only) |
2 | Removal of existing hot insulation from pipe lines/equipment, preserving the clading, ST screws, insulation material (if re-usable), disposing the non re-usable insulation material to Central Stores in HDPE bags.The HDPE/gunny bags for collection of the removed insulation shall be arranged by the contractor. Scaffolding erection & removal for work execution if any will be measured under item Sl No.:1.6 of this SOQ |
3 | Fixing back of removed usable insulation /new 100mm thick on XU towers, on pipe line equipment upto the height of 25m, as per the enclosed technical specification. Scaffolding erection & removal for work execution if any will be measured under item Sl No.:1.6 of this SOQ |
4 | Fixing of Al-foil (on SS piping/SS equipment surfaces only) having thickness 0.05 mm or 0.1 mmon the Stainless Steel surface and tying them with SS binding wire as per the enclosedtechnical specification. Scaffolding erection & removal for work execution if any will be measured under item Sl No.:1.6 of this SOQ |
5 | Surface preparation and laying of new insulation (first time application) on the new surfaces to the required thickness as instructed by the EIC of work excluding Al.Foil fixing but including aluminium sheet work as per the enclosed technical specifcation.Scaffolding erection & removal for work execution if any will be measured under item Sl No.:1.6 of this SOQ |
6 | Painting of exposed CS surfaces (CS Pipe or equipment surfaces) after removal of insulation or new surfaces, application of paintas per the enclosed technical specification at all elevations.Scaffolding erection & removal for work execution if any will be measured under item Sl No.:1.6 of this SOQ |
7 | Erection and dismantling of temporary platforms up to an height of 25 Mtrs wherever necessary for insulation work execution only as per the enclosed technical specification |
8 | Item-2 (From 26Mtrs to 54 Mtrs height) |
9 | Removal of existing hot insulation from pipe lines/equipment, preserving the clading, ST screws, insulation material (if re-usable), disposing the non re-usable insulation material to Central Stores in HDPE bags.The HDPE/gunny bags for collection of the removed insulation shall be arranged by the contractor.Scaffolding erection & removal for work execution if any will be measured under item Sl No.: 2.6 of this SOQ |
10 | Fixing back of removed usable insulation /new 100mm thick on XU towers, on pipe line equipment from 25 mtrs height and upto 54 mtrs, as per the enclosed technical specification. Scaffolding erection & removal for work execution if any will be measured under item Sl No.: 2.6 of this SOQ |
11 | Fixing of Al-foil (on SS piping/SS equipment surfaces only) having thickness 0.05 mm or 0.1 mmon the Stainless Steel surface and tying them with SS binding wire as per the enclosedtechnical specification. Scaffolding erection & removal for work execution if any will be measured under item Sl No.: 2.6 of this SOQ |
12 | Surface preparation and laying of new insulation (first time application) on the new surfaces to the required thickness as instructed by the EIC of work excluding Al.Foil fixing but including aluminium sheet work as per the enclosed technical specifcation including erection and removal of temproray platforms for painting work execution wherever necessary. Scaffolding erection & removal for work execution if any will be measured under item Sl No.: 2.6 of this SOQ |
13 | Painting of exposed CS surfaces (CS Pipe or equipment surfaces) after removal of insulation or new surfaces, application of paintas per the enclosed technical specification at all elevations. Scaffolding erection & removal for work execution if any will be measured under item Sl No.: 2.6 of this SOQ |
14 | Erection and dismantling of temporary platforms from 20 Mtrs above upto 54 Mtrs wherever necessary for insulation work execution only as per the enclosed technical specification |