|
| 1 | Lab Items |
| 2 | SO2 Analyser Model: (To be Filled by supplier) |
| 3 | NO-NO2-NOx AnalyserModel: (To be Filled by supplier) |
| 4 | CO Analyser Model: (To be Filled by supplier) |
| 5 | CO2 Analyser Model: (To be Filled by supplier) |
| 6 | PM2.5 Analyser Model: (To be Filled by supplier) |
| 7 | PM10 Analyser Model: (To be Filled by supplier) |
| 8 | Ammonia Analyser Model: (To be Filled by supplier) |
| 9 | Benzene Analyser Model: (To be Filled by supplier) |
| 10 | Ozone Analyser Model: (To be Filled by supplier) |
| 11 | Multipoint, Multi-Gas Calibrator Model: (To be Filled by supplier) |
| 12 | Zero Air Generator, Model: (To be Filled by supplier) |
| 13 | Hydrogen Generator, Model: (To be Filled by supplier) |
| 14 | SO2 Gas Cylinder with Regulator & Valve |
| 15 | NOx Gas Cylinder with Regulator & Valve |
| 16 | CO Gas Cylinder with Regulator & Valve |
| 17 | CO2 Gas Cylinder with Regulator & Valve |
| 18 | Gas Cylinder for Benzene Analyzer with Regulator & Valve |
| 19 | Gas Cylinder for Ammonia Analyzer with Regulator & Valve |
| 20 | Gas Sampling System with SS hood |
| 21 | Local DAS with Work Station(PC) & Laser Jet (A4) Printer |
| 22 | RF Wireless Connectivity for Local DAS, Central DAS, Display board, PCB ServerLicense & Renewal for use of wireless communication for 3 years |
| 23 | Central DAS with PC, Laser Jet Printer & UPS (6 Hour Back up) |
| 24 | UPS (5 KVA Minimum for Analysers & DAS, 1 Hour Battery Back-up) |
| 25 | Analyzer Shelter with 19” Rack Cabinet, Furniture (01 Cupboard, 01 Table & 02 Revolving Chairs), 1.5T Air Conditioners (2 No. for each AAQMS) |
| 26 | Meteorological Monitoring System Model: |
| 27 | Consumables/spares required for one year after commissioning of stations |
| 28 | O&M contract for one year after commissioning of stations |
| 29 | Electronic Display along with Platform and Mounting structure |
| 30 | In any other item required for the completeness of the system |
| 31 | Any other component/system required for the installation, comissioning and operation of the quoted model |
| 32 | Lumpsum Erection, Commissioning & Training charges for complete scope of work as per clause 9.1 & 9.2 of Annexure-2 (inclusive of everything i.e. To & Fro charges, local conveyance, lodging and boarding etc. and irrespective of no. of man-days) Note: Construction (with material) of suitable plateform,earthpit, Installation & Commisioning of the system, Training to the Power Plant Staff at site will be vendor\"s scope completely. |