Satrod Kalan Aug Renovation Of Water Works Boosting Station Including Functional House Hold Tap Connection For Water Supply Scheme Satrod Kalan District Hissar Under Jal Jeevan Mission Const Of 400 Mm Dia Rcc Pipe Ic 1 No Rcc Ss Tanks Const Of 1Point50 Ml, hisar-Haryana

Public Health Engineering Department-PHED has published Satrod Kalan Aug Renovation Of Water Works Boosting Station Including Functional House Hold Tap Connection For Water Supply Scheme Satrod Kalan District Hissar Under Jal Jeevan Mission Const Of 400 Mm Dia Rcc Pipe Ic 1 No Rcc Ss Tanks Const Of 1Point50 Ml. Submission Date for this Tender is 15-02-2022. Concrete Pipe Tenders in hisar Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

31022772
Satrod Kalan Aug Renovation Of Water Works Boosting Station Including Functional House Hold Tap Connection For Water Supply Scheme Satrod Kalan District Hissar Under Jal Jeevan Mission Const Of 400 Mm Dia Rcc Pipe Ic 1 No Rcc Ss Tanks Const Of 1Point50 Ml
Limitted
Indian
Haryana
hisar
15-02-2022

Tender Details

Satrod Kalan Aug Renovation Of Water Works Boosting Station Including Functional House Hold Tap Connection For Water Supply Scheme Satrod Kalan District Hissar Under Jal Jeevan Mission Const Of 400 Mm Dia Rcc Pipe Ic 1 No Rcc Ss Tanks Const Of 1Point50 Mld Wtp 2 No Rcc Cwt Rcc Suction Well For Rw Rcc Scour Well For Clear Water1 No Pc Dewatering Dismantling Of Old Structures Removing Development Of Ww B Wall Iron Gate Pipe Line => Limited

Key Value

Document Fees
INR 20000 /-
EMD
INR 1211440.0 /-
Tender Value
INR 6.05 Crore /-

BOQ Items

Satrod Kalan - Aug./Renovation of Water works/Boosting Station including Functional House Hold Tap Connection for water supply Scheme Satrod Kalan District Hissar (under Jal Jeevan Mission)"Const. of 400 mm dia RCC Pipe inlet channel, 1 No.RCC S/S Tanks, Const. of 1.50 MLD WTP,2 No. RCC Clear Water Tank, RCC Suction Well for Raw water, RCC Scour Well for Clearwater,1 No. Pump Chamber, Dewatering , Dismantling of Old Structuresremoving , Development of Water Works, Boundary wall, Iron Gate, pipe line at head works, Supply & erection of Pumping machinery for raw water & clear water and O & M of WTP Only for Six Years including one year defect liability period after 3 months trial run and all other works contingent thereto"( At water WorksSatroad Kalan Hissar)
Sl. No. Item Description
1Construction of 1.50 MLD water purification plant Scada Based at Water works, comprising of labor for DI pipe form existing Raw water main/pump , inlet box, inlet channel, Alum dozing, Flash mixing, Tapered flocculate Rectangular setting tank, filter box over head reservoir for back wash including pump sets and electric control panel covers, air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement and sand bed complete in all respect as per DNIT . Labour rate for fixing DI Specials/ fitting, Fitting, ISI marked PN 1.6sluice valves including cost of excavation, laying cutting, jointing threading and jointing material in horizontal length including connection complete in all respect. From existing raw water main pump to inlet box of filter unit to clear water tank, Note- DI pipe will be supplied by the department free of cost. (Sluice valve of make IVC/ VAG ) BASED ON SCADA SYSTEM-1.50 MLD WTP
2Supply & erection of Horizontal spindle split casing type pumping sets minimum Four (4) Star rating duties coupled to AC squrrel cage induction type motor with 1440 RPM, 3 phase 50 Hz and accessories as described in Schedule No.II complete in all respect with priming arrangement with complete base frame as per IS marked complete in all respect A) Raw water pump set Raw Water Pump set 3700 LPM 12 Mtrs Head at Raw water pumping station
3Supply, erection, testing and commissioning of wall mounted electrical panel board, fabricated from 16 SWG CRCA sheet duly stouted with suitable angle iron frame work and completely powder coated of approximate size 1200x900 mm having following items. (A)For Raw Water Pump set 3700 LPM 12 Mtrs Head 2 Nos. at water works a) Main switch a100 Amp2 No.(L&T Siemens, ABB) b) Volt meter 100x100 mm range 0 to 500 volt 1 No.(AE/KAPPA/L&T) C) Amp meter 100X100mm range 0 to 100 Amp 2 Nos. (AE/KAPPA/L&T) D) CT 100/ 3 Nos. (AE/KAPPA/L&T) E) VSS 1 No.& ASS 2 No. each of approved make F) SPP 1 No. of approved make g) Motor starter, Star delta 2 No.for 3700 LPM 12 Mtr headmotor (L&T, Simens,AAB) H) Capacity KVAR as per site requirement 2 No. I) Indicating Lamp - One Set J) Change Over switch 100 Amp.as required = 1 No.
4(B) For Clear Water Pump Sets for 2000 LPM x 40 Mtrs. Head, = 2 Nos at water works a) Main switch 100 Amp2 No.(L&T Siemens, ABB) b) Volt meter 100x100 mm range 0 to 500 volt 1 No.(AE/KAPPA/L&T) C) Amp meter 100X100mm range 0 to 100 Amp 2 Nos. (AE/KAPPA/L&T) D) CT 100/ 3 Nos. (AE/KAPPA/L&T) E) VSS 1 No.& ASS 2 No. each of approved make F) SPP 1 No. of approved make g) Motor starter, Star delta 2 No.for 2000 LPM 40 Mtr H) Capacity KVAR as per site requirement 2 No. I) Indicating Lamp - One Set J) Change Over switch 100 Amp. = 1 No.
5(C) For Clear Water Pump set 1800 LPM x30 Mtrs Head 2 Nos. at W/W for filling of B/Stn. a) Main switch 100Amp.2 No.(L&T Siemens, ABB) b) Volt meter 100x100 mm range 0 to 500 volt 1 No.(AE/KAPPA/L&T) C) Amp meter 100X100mm range 0 to 100 Amp 2 Nos. (AE/KAPPA/L&T) D) CT 100/ 3 Nos. (AE/KAPPA/L&T) E) VSS 1 No.& ASS 2 No. each of approved make F) SPP 1 No. of approved make g) Motor starter, Star delta 2 No.for 1800 LPM 30 Mtr H) Capacity KVAR as per site requirement 2 No. I) Indicating Lamp - One Set J) Change Over switch 100 Amp. = 1 No.
6(D) For Clear Water Pump set 1100 LPM x 35 Mtrs Head 2 Nos. at B/Stn. Bhagana Road a) Main switch 100 Amp.2 No.(L&T Siemens, ABB) b) Volt meter 100x100 mm range 0 to 500 volt 1 No.(AE/KAPPA/L&T) C) Amp meter 100X100mm range 0 to 100 Amp 2 Nos. (AE/KAPPA/L&T) D) CT 100/ 3 Nos. (AE/KAPPA/L&T) E) VSS 1 No.& ASS 2 No. each of approved make F) SPP 1 No. of approved make g) Motor starter, Star delta 2 No.for 1100 LPM 35 Mtr H) Capacity KVAR as per site requirement 2 No. I) Indicating Lamp - One Set J) Change Over switch 100 Amp = 1 No.
7(E) For Clear Water Pump set 800 LPM 35 Mtrs Head 2 Nos.(At Boosting Station Ladwa Road) a) Main switch 100 Amp 2 No.(L&T Siemens, ABB) b) Volt meter 100x100 mm range 0 to 500 volt 1 No.(AE/KAPPA/L&T) C) Amp meter 100X100mm range 0 to 100 Amp 2 Nos. (AE/KAPPA/L&T) D) CT 100/ 3 Nos. (AE/KAPPA/L&T) E) VSS 1 No.& ASS 2 No. each of approved make F) SPP 1 No. of approved make g) Motor starter, Star delta 2 No.for 800 LPM 35 Mtr H) Capacity KVAR as per site requirement 2 No. I) Indicating Lamp - One Set J) Change Over switch 100 Amp = 1 No.
8Supplying erection, testing of ISI marked copper wire for 6 Nos. motors with under ground system in PVC and flexible pipes copper wire size complete in all respects i) 6 sq mm 3 core
9ii) 10 sq mm 3 core
10iii) 16 sq mm 3 core
11Providing erection, testing of reputed make LED light 100 watts with fitting and accessories complete in all respect
12Supply erection, testing of light fittings including wire in the Pump Chamber with material upto 10 points including switch, button, plug, PVC conduit pipe & copper wire etc. as per approved specifications complete in all respects
13Lowering of sub-soil water level upto bottom of the foundation concrete of the Structures by providing well point systemon both side of the trench including cost of 100 mm dia boring. Providing and installing pipes 100 mm dia for the bore developing for a successful bore, providing and installation of pumping machinery, suction/delivery pipes, disposal of water 20 mtr away from bore point including cost of repair maintenance, running cost machinery,and diesel oil charges, consumable items, pay of the operational staff,and dismantling of the pumping machinery, and filling the bores with sand after use and reinstallation the same to the next site for repeating of the above process of well point system, ifrequired completeconstruction/testing of the structures under dry conditionNothing extra will be paid for any difficulties met with during execution/construction,This, item is onlypayable for after Completion ofStructuresand notihing shall be payable if the water table is lowered and construction work is delayed or not done due to any reason what so far. For Const of S S Tank at Water works
14For Const of S S Well at Water works
15For Const of Clear water Tankat Water works
16For Const of Clear water Tankat B/Stn.
17Less Credit of old material Bricks
18Bricks bats
19RCC pipe 400mm i/d
20Credit of Old Pumping Machinery Raw Water = 2000 LPM x 12 Mtr Head
21Clear Water = 600 LPM x 40 Mtr Head = 1 700 LPM x 40 Mtr Head = 2 3000 LPM x 45 Mtr Head = 1 1600 LPM x 45 Mtr Head = 1
22Operation and mantenence of WTP complete scope of work ( Distiction Material Supplied by the PHED) as per schedule - iv for a period of 5 year after 12 months during defect liabilityperiod and 3 months trial run period ( wil be charged to a/mtc. estimate. Complete in all respect Operation and mantenence during defect liability period ( Operation Only ) after 3 months trial run period
23For 1st Year Operation and Maintenance after defect liability period
24For 2nd Year Operation and Maintenance after defect liability period
25For 3rd Year Operation and Maintenance after defect liability period
26For 4th Year Operation and Maintenance after defect liability period
27For 5th Year Operation and Maintenance after defect liability period
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail