Pudukkottai District - Renovation Works Of Library Buildings Package No.2 Under Agamt 2021-22 In Arimalam Bock Pudukkottai District - Renovation Works Of Library Buildings Package No.2 Under Agamt 2021-22 In Arimalam Bock
Tender Overview
Project Description
Pudukkottai District - Renovation Works Of Library Buildings Package No.2 Under Agamt 2021-22 In Arimalam Bock Pudukkottai District - Renovation Works Of Library Buildings Package No.2 Under Agamt 2021-22 In Arimalam Bock
BOQ
| Sl. No. | Item Description |
| 1 | 1. Renovation of Library Building @ Namburanipatti in Nallammalsamuthiram Panchayat |
| 2 | Plastering with CM 1:5 mix 12mm thicknessincluding cost of conveyance of all materials to work site and all labour charges etc. complete |
| 3 | Dismantling the damaged Pressed Tiles over roof including all labour charges etc., complete. |
| 4 | Pointing with CM 1:3 mix to full depth of tiles including cost and conveyance of all materials to work site including all labour charges etc., complete |
| 5 | Roof Top of Pressed Tiles including cost and conveyance cost of al materials to work site and labour charges and finishing with one layer of pressed tiles of size 20 cm x 20 cm x 20mm embadded in cement morter 1:3 mix with water profing course and pointed with same mixed morter to full depth of tiles etc., complete. |
| 6 | Supply and fixing of Ceramic Tiles including cost and conveyance of all materials to site and all labour charges etc. complete |
| 7 | Supply and fixing of Glazed Wall Tiles including cost and conveyance of all materials to site and all labour charges etc. complete |
| 8 | White washing 2 coats with shell lime including cost and conveyance of all labour charges etc., complete. |
| 9 | Distempering the old walls and ceiling one coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer |
| 10 | Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358 |
| 11 | Painting TWO coats of Old iron works such as steel doors, windows, ventilators, window bars, balustrades, etc, with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats, etc., complete complying with standard specification. |
| 12 | Supply and run of 2 of 1.50 sqm (22/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100V Grade on 7/20 GI bearer wire for service connetion mains. |
| 13 | Supply and fitting of single box type 4\"40W flu fitting complete with copper choke and condensor with conduit pipe sispension from the ceiling with PVC unsheathed Copper leads from terminals to the fitting with tube |
| 14 | Supply and fixing of 1200mm(48\") AC ceiling FAN complete with stepped etecronic 300w regulator with 300mm down rod on the existing clamp |
| 15 | Construction of Toilet - Sub Estimate |
| 16 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation. |
| 17 | Filling with good river sand including cost and conveyance of sand to work site including all labour charges for filling etc complete. |
| 18 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. |
| 19 | Random Rubble Masontry CM 1:5 mix using rough stone and bond stone including cost and conveyance of all materials and all labour chargesetc complete |
| 20 | Brick work in cement mortor 1:5 mix using country bricks of size 8¾ x 4¼ x 2¾ including cost and conveyance of all materials of all materials to site and labour charges etc. complete |
| 21 | Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete. |
| 22 | Supplying and fabrication of steel rods including all cost and conveyance and all labour charges and all other incidental charges. |
| 23 | R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete. |
| 24 | Providing Granolithic Pattern Floor finish with plain cement concrete 1:2:4 using 10-12 mm ISS HBG metal and top rubbed smooth etc., comp |
| 25 | Plastering with CM 1:5 mix 12mm thicknessincluding cost of conveyance of all materials to work site and all labour charges etc. complete |
| 26 | Supply and fixing ofToilet Door size of 1.0 x 1.80m incluidng all charges etc., complete |
| 27 | Supply and fixing ofEuropean Water Closet incluidng all charges etc., complete |
| 28 | Supply and fixing of 110mm dia PVC Pipes etc., complete |
| 29 | Colour washing 2 coats with shell lime including cost and conveyance of all labour charges etc., complete. |
| 30 | Repairs to the Library Building atPiliyavayal in Piliyavayal Panchayat |
| 31 | Pointing with CEMENT MORTOR 1:3 MIX to tilespointingincluding all labour chrges etc., complete |
| 32 | Finishing with one layer pressed tilesincluding cost and conveyance costof al materials to work site and labour charges and finishing with one layer etc complete |
| 33 | PLASTERING WITH CEMENT MORTER 1:5 MIX 12MM THICKNESS including cost of conveyance of all materials to work site and all labour charges etc. complete |
| 34 | White washing 2 coats with shell lime including cost and conveyance of all labour charges etc., complete. |
| 35 | Distempering two coats with Oil Bound Distemper two coats with one Coat of Primary Coatincluding cost and conveyance of all materials to site and all labour charges etc., complete. |
| 36 | Emulsion two coats including cost of conveyance of all materials to work site and all labour charges etc. complete |
| 37 | Painting two coatsold ironworks including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 38 | Supply and run of 2 of 1.50 sq.mm (22/0.30) PVC insulated SC unsheathed copper Conductor of1100 V grade on 7/20GI bearer wire for service connection mains SD 63 |
| 39 | Supply and fixing of 9W LED Bulb |
| 40 | Supply and fixing of single box tube ligtht |
| 41 | Supply and fixing of 1200 mm ( 48\") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mmdown rod on the existing clamp. SD 106 |
| 42 | TOILET |
| 43 | EARTH WORK EXCAVATION in all clauses of soil such as hard stiff clay, murramn stoney earth mixed 50% fair mixed boulders etc., complete as per SS 20B. |
| 44 | Cement Concrete 1:4:8 Using 40mm gauge Hand Broken Granite stone jelly for foundation including watering whenever necessary and jaid in layers not more than 15 cm thick compacting etc., complete complete |
| 45 | RR in cm 1:5 mix using rough and bond stoneincluidng cost and conveyance and all labour charges etc., complete - |
| 46 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x43/8\"x23/4\" including cost and conveyance of all materials to site and all labour charges etc complete. |
| 47 | Supply and errction of centring for sides and soffits incluidng cost and conveyance and all labour charges etc., complete - |
| 48 | Supply and fabrication of RTS Steel bars incluidng cost and conveyance and all labour charges etc., complete - |
| 49 | RCC 1:1.5:3 mix using 20mm ISS size of HBG metal incluidng cost and conveyance and all labour charges etc., complete - |
| 50 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and labour charges etc complete |
| 51 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 52 | Distempering two coats with Oil Bound Distemper two coats with one Coat of Primary Coatincluding cost and conveyance of all materials to site and all labour charges etc., complete. |
| 53 | Supply and fixing ofToilet Door size of 1.0x1.80 |
| 54 | Supply and fixing ofEuropean water closet |
| 55 | Supply and fixing of110 mmPVC pipe |
| 56 | Repairs to the Library Building atEmbal in Embal Panchayat |
| 57 | Finishing with one layer pressed tilesincluding cost and conveyance costof al materials to work site and labour charges and finishing with one layer etc complete |
| 58 | PLASTERING WITH CEMENT MORTER 1:5 MIX 12MM THICKNESS including cost of conveyance of all materials to work site and all labour charges etc. complete |
| 59 | White washing 2 coats with shell lime including cost and conveyance of all labour charges etc., complete. |
| 60 | Distempering two coats with Oil Bound Distemper two coats with one Coat of Primary Coatincluding cost and conveyance of all materials to site and all labour charges etc., complete. |
| 61 | Emulsion two coats including cost of conveyance of all materials to work site and all labour charges etc. complete |
| 62 | Painting two coatsold ironworks including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 63 | Supply and run of 2 of 1.50 sq.mm (22/0.30) PVC insulated SC unsheathed copper Conductor of1100 V grade on 7/20GI bearer wire for service connection mains SD 63 |
| 64 | Supply and fixing of 9W LED Bulb |
| 65 | Supply and fixing of single box tube ligtht |
| 66 | Supply and fixing of 1200 mm ( 48\") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mmdown rod on the existing clamp. SD 106 |
| 67 | TOILET |
| 68 | EARTH WORK EXCAVATION in all clauses of soil such as hard stiff clay, murramn stoney earth mixed 50% fair mixed boulders etc., complete as per SS 20B. |
| 69 | Cement Concrete 1:4:8 Using 40mm gauge Hand Broken Granite stone jelly for foundation including watering whenever necessary and jaid in layers not more than 15 cm thick compacting etc., complete complete |
| 70 | RR in cm 1:5 mix using rough and bond stoneincluidng cost and conveyance and all labour charges etc., complete - |
| 71 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x43/8\"x23/4\" including cost and conveyance of all materials to site and all labour charges etc complete. |
| 72 | Supply and errction of centring for sides and soffits incluidng cost and conveyance and all labour charges etc., complete - |
| 73 | Supply and fabrication of RTS Steel bars incluidng cost and conveyance and all labour charges etc., complete - |
| 74 | RCC 1:1.5:3 mix using 20mm ISS size of HBG metal incluidng cost and conveyance and all labour charges etc., complete - |
| 75 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and labour charges etc complete |
| 76 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 77 | Distempering two coats with Oil Bound Distemper two coats with one Coat of Primary Coatincluding cost and conveyance of all materials to site and all labour charges etc., complete. |
| 78 | Supply and fixing ofToilet Door size of 1.0x1.80 |
| 79 | Supply and fixing ofEuropean water closet |
| 80 | Supply and fixing of110 mmPVC pipe |
| 81 | Repairs to the Library Building at Keeranipatti in Thuraiyur Panchayat |
| 82 | Pointing with CEMENT MORTOR 1:3 MIX to tilespointingincluding all labour chrges etc., complete |
| 83 | Finishing with one layer pressed tilesincluding cost and conveyance costof al materials to work site and labour charges and finishing with one layer etc complete |
| 84 | PLASTERING WITH CEMENT MORTER 1:5 MIX 12MM THICKNESS including cost of conveyance of all materials to work site and all labour charges etc. complete |
| 85 | White washing 2 coats with shell lime including cost and conveyance of all labour charges etc., complete. |
| 86 | Distempering two coats with Oil Bound Distemper two coats with one Coat of Primary Coatincluding cost and conveyance of all materials to site and all labour charges etc., complete. |
| 87 | Emulsion two coats including cost of conveyance of all materials to work site and all labour charges etc. complete |
| 88 | Painting two coatsold ironworks including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 89 | Supply and run of 2 of 1.50 sq.mm (22/0.30) PVC insulated SC unsheathed copper Conductor of1100 V grade on 7/20GI bearer wire for service connection mains SD 63 |
| 90 | Supply and fixing of 9W LED Bulb |
| 91 | Supply and fixing of single box tube ligtht |
| 92 | Supply and fixing of 1200 mm ( 48\") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mmdown rod on the existing clamp. SD 106 |
| 93 | TOILET |
| 94 | EARTH WORK EXCAVATION in all clauses of soil such as hard stiff clay, murramn stoney earth mixed 50% fair mixed boulders etc., complete as per SS 20B. |
| 95 | Filling with GOOD RIVER SAND including cost and conveyance of sand to work site including all labour charges for filling etc., complete for 1CUM |
| 96 | Cement Concrete 1:4:8 Using 40mm gauge Hand Broken Granite stone jelly for foundation including watering whenever necessary and jaid in layers not more than 15 cm thick compacting etc., complete complete |
| 97 | RR in cm 1:5 mix using rough and bond stoneincluidng cost and conveyance and all labour charges etc., complete - |
| 98 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x43/8\"x23/4\" including cost and conveyance of all materials to site and all labour charges etc complete. |
| 99 | Supply and errction of centring for sides and soffits incluidng cost and conveyance and all labour charges etc., complete - |
| 100 | Supply and fabrication of RTS Steel bars incluidng cost and conveyance and all labour charges etc., complete - |
| 101 | RCC 1:1.5:3 mix using 20mm ISS size of HBG metal incluidng cost and conveyance and all labour charges etc., complete - |
| 102 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and labour charges etc complete |
| 103 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 104 | Distempering two coats with Oil Bound Distemper two coats with one Coat of Primary Coatincluding cost and conveyance of all materials to site and all labour charges etc., complete. |
| 105 | Supply and fixing ofToilet Door size of 1.0x1.80 |
| 106 | Supply and fixing ofEuropean water closet |
| 107 | Supply and fixing of110 mmPVC pipe |
| 108 | Repairs to the Library Building at Samanthanpatti in Samuthiram Panchayat |
| 109 | Pointing with CEMENT MORTOR 1:3 MIX to tilespointingincluding all labour chrges etc., complete |
| 110 | PLASTERING WITH CEMENT MORTER 1:5 MIX 12MM THICKNESS including cost of conveyance of all materials to work site and all labour charges etc. complete |
| 111 | White washing 2 coats with shell lime including cost and conveyance of all labour charges etc., complete. |
| 112 | Distempering two coats with Oil Bound Distemper two coats with one Coat of Primary Coatincluding cost and conveyance of all materials to site and all labour charges etc., complete. |
| 113 | Emulsion two coats including cost of conveyance of all materials to work site and all labour charges etc. complete |
| 114 | Painting two coatsold ironworks including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 115 | Supply and run of 2 of 1.50 sq.mm (22/0.30) PVC insulated SC unsheathed copper Conductor of1100 V grade on 7/20GI bearer wire for service connection mains SD 63 |
| 116 | Supply and fixing of 9W LED Bulb |
| 117 | Supply and fixing of single box tube ligtht |
| 118 | Supply and fixing of 1200 mm ( 48\") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mmdown rod on the existing clamp. SD 106 |
| 119 | TOILET |
| 120 | EARTH WORK EXCAVATION in all clauses of soil such as hard stiff clay, murramn stoney earth mixed 50% fair mixed boulders etc., complete as per SS 20B. |
| 121 | Cement Concrete 1:4:8 Using 40mm gauge Hand Broken Granite stone jelly for foundation including watering whenever necessary and jaid in layers not more than 15 cm thick compacting etc., complete complete |
| 122 | RR in cm 1:5 mix using rough and bond stoneincluidng cost and conveyance and all labour charges etc., complete - |
| 123 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x43/8\"x23/4\" including cost and conveyance of all materials to site and all labour charges etc complete. |
| 124 | Supply and errction of centring for sides and soffits incluidng cost and conveyance and all labour charges etc., complete - |
| 125 | Supply and fabrication of RTS Steel bars incluidng cost and conveyance and all labour charges etc., complete - |
| 126 | RCC 1:1.5:3 mix using 20mm ISS size of HBG metal incluidng cost and conveyance and all labour charges etc., complete - |
| 127 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and labour charges etc complete |
| 128 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 129 | Distempering two coats with Oil Bound Distemper two coats with one Coat of Primary Coatincluding cost and conveyance of all materials to site and all labour charges etc., complete. |
| 130 | Supply and fixing ofToilet Door size of 1.0x1.80 |
| 131 | Supply and fixing ofEuropean water closet |
| 132 | Supply and fixing of110 mmPVC pipe |
| 133 | Repairs to the Library Building at Irumbanadu in Irumbanadu Panchayat |
| 134 | Finishing with one layer pressed tilesincluding cost and conveyance costof al materials to work site and labour charges and finishing with one layer etc complete |
| 135 | PLASTERING WITH CEMENT MORTER 1:5 MIX 12MM THICKNESS including cost of conveyance of all materials to work site and all labour charges etc. complete |
| 136 | White washing 2 coats with shell lime including cost and conveyance of all labour charges etc., complete. |
| 137 | Distempering two coats with Oil Bound Distemper two coats with one Coat of Primary Coatincluding cost and conveyance of all materials to site and all labour charges etc., complete. |
| 138 | Emulsion two coats including cost of conveyance of all materials to work site and all labour charges etc. complete |
| 139 | Painting two coatsold ironworks including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 140 | Supply and run of 2 of 1.50 sq.mm (22/0.30) PVC insulated SC unsheathed copper Conductor of1100 V grade on 7/20GI bearer wire for service connection mains SD 63 |
| 141 | Supply and fixing of 9W LED Bulb |
| 142 | Supply and fixing of single box tube ligtht |
| 143 | Supply and fixing of 1200 mm ( 48\") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mmdown rod on the existing clamp. SD 106 |
| 144 | TOILET |
| 145 | EARTH WORK EXCAVATION in all clauses of soil such as hard stiff clay, murramn stoney earth mixed 50% fair mixed boulders etc., complete as per SS 20B. |
| 146 | Cement Concrete 1:4:8 Using 40mm gauge Hand Broken Granite stone jelly for foundation including watering whenever necessary and jaid in layers not more than 15 cm thick compacting etc., complete complete |
| 147 | RR in cm 1:5 mix using rough and bond stoneincluidng cost and conveyance and all labour charges etc., complete - |
| 148 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x43/8\"x23/4\" including cost and conveyance of all materials to site and all labour charges etc complete. |
| 149 | Supply and errction of centring for sides and soffits incluidng cost and conveyance and all labour charges etc., complete - |
| 150 | Supply and fabrication of RTS Steel bars incluidng cost and conveyance and all labour charges etc., complete - |
| 151 | RCC 1:1.5:3 mix using 20mm ISS size of HBG metal incluidng cost and conveyance and all labour charges etc., complete - |
| 152 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and labour charges etc complete |
| 153 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 154 | Distempering two coats with Oil Bound Distemper two coats with one Coat of Primary Coatincluding cost and conveyance of all materials to site and all labour charges etc., complete. |
| 155 | Supply and fixing ofToilet Door size of 1.0x1.80 |
| 156 | Supply and fixing ofEuropean water closet |
| 157 | Supply and fixing of110 mmPVC pipe |
| 158 | Repairs to the Library Building at Kurungalore in Kurungalore Panchayat |
| 159 | Pointing with CEMENT MORTOR 1:3 MIX to tilespointingincluding all labour chrges etc., complete |
| 160 | Finishing with one layer pressed tilesincluding cost and conveyance costof al materials to work site and labour charges and finishing with one layer etc complete |
| 161 | PLASTERING WITH CEMENT MORTER 1:5 MIX 12MM THICKNESS including cost of conveyance of all materials to work site and all labour charges etc. complete |
| 162 | White washing 2 coats with shell lime including cost and conveyance of all labour charges etc., complete. |
| 163 | Distempering two coats with Oil Bound Distemper two coats with one Coat of Primary Coatincluding cost and conveyance of all materials to site and all labour charges etc., complete. |
| 164 | Emulsion two coats including cost of conveyance of all materials to work site and all labour charges etc. complete |
| 165 | Painting two coatsold ironworks including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 166 | Supply and run of 2 of 1.50 sq.mm (22/0.30) PVC insulated SC unsheathed copper Conductor of1100 V grade on 7/20GI bearer wire for service connection mains SD 63 |
| 167 | Supply and fixing of 9W LED Bulb |
| 168 | Supply and fixing of single box tube ligtht |
| 169 | Supply and fixing of 1200 mm ( 48\") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mmdown rod on the existing clamp. SD 106 |
| 170 | TOILET |
| 171 | EARTH WORK EXCAVATION in all clauses of soil such as hard stiff clay, murramn stoney earth mixed 50% fair mixed boulders etc., complete as per SS 20B. |
| 172 | Cement Concrete 1:4:8 Using 40mm gauge Hand Broken Granite stone jelly for foundation including watering whenever necessary and jaid in layers not more than 15 cm thick compacting etc., complete complete |
| 173 | RR in cm 1:5 mix using rough and bond stoneincluidng cost and conveyance and all labour charges etc., complete - |
| 174 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x43/8\"x23/4\" including cost and conveyance of all materials to site and all labour charges etc complete. |
| 175 | Supply and errction of centring for sides and soffits incluidng cost and conveyance and all labour charges etc., complete - |
| 176 | Supply and fabrication of RTS Steel bars incluidng cost and conveyance and all labour charges etc., complete - |
| 177 | RCC 1:1.5:3 mix using 20mm ISS size of HBG metal incluidng cost and conveyance and all labour charges etc., complete - |
| 178 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and labour charges etc complete |
| 179 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 180 | Distempering two coats with Oil Bound Distemper two coats with one Coat of Primary Coatincluding cost and conveyance of all materials to site and all labour charges etc., complete. |
| 181 | Supply and fixing ofToilet Door size of 1.0x1.80 |
| 182 | Supply and fixing ofEuropean water closet |
| 183 | Supply and fixing of110 mmPVC pipe |
| 184 | GST Amount for providing Service to Government Contract Works for the above RENEWALWorks. { GST Amount is the Total GST Amount for overall quoted amountabove this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender