}

Repair / Maintenance Of Earthing, Dg Set, Voltage Stabilizer, Transformer And Amf Panels Along With Certain Other Connected External Electrification Works At Af-I And Af-Ii Under Ge ( Af ) Jamnagar No.2 Repair / Maintenance Of Earthing, Dg Set, , jamnagar-Gujarat

Military Engineer Services-MES has published Repair / Maintenance Of Earthing, Dg Set, Voltage Stabilizer, Transformer And Amf Panels Along With Certain Other Connected External Electrification Works At Af-I And Af-Ii Under Ge ( Af ) Jamnagar No.2 Repair / Maintenance Of Earthing, Dg Set, . Submission Date for this Tender is 01-03-2022. Electrification Work Tenders in jamnagar Gujarat. Bidders can get complete Tender details and download the document.




Tender Notice

31014562
Repair / Maintenance Of Earthing, Dg Set, Voltage Stabilizer, Transformer And Amf Panels Along With Certain Other Connected External Electrification Works At Af-I And Af-Ii Under Ge ( Af ) Jamnagar No.2 Repair / Maintenance Of Earthing, Dg Set,
Open Tender
Indian
Gujarat
jamnagar
01-03-2022

Tender Details

Repair / Maintenance Of Earthing, Dg Set, Voltage Stabilizer, Transformer And Amf Panels Along With Certain Other Connected External Electrification Works At Af-I And Af-Ii Under Ge ( Af ) Jamnagar No.2 Repair / Maintenance Of Earthing, Dg Set, Voltage Stabilizer, Transformer And Amf Panels Along With Certain Other Connected External Electrification Works At Af-I And Af-Ii Under Ge ( Af ) Jamnagar No.2

Key Value

Document Fees
INR 500 /-
EMD
INR 83000.0 /-
Tender Value
INR 41.50 Lakhs /-

BOQ Items

NAME OF WORK : REPAIR / MAINTENANCE OF EARTHING, DG SET, VOLTAGE STABILIZER, TRANSFORMER AND AMF PANELS ALONG WITH CERTAIN OTHER CONNECTED EXTERNAL ELECTRIFICATION WORKS AT AF-I AND AF-II UNDER GE (AF) JAMNAGAR NO.2
Sl. No. Item Description
1Repair to Diesel engine generator set 125 KVA installed at (i) Main Pump House Jamnagar Make : Kirloskar SM No.177253 and (ii) DSC Pump House, Jamnagar SM No: 6001/1400172 Kirloskar Make by taking out and repair/ replacement of defective parts with new parts as under
2Diesel filter element with gasket
3Inhibitor corrosion tube water bypass & water outlet
4Air cleaner element
5Engine oil filter element complete
6Air Filter (inner & outer)
7Fuel filter bowl pre element & micro element
8Solenoid switch with wiring complete
9Governor cable both inner and outer including RPM adjustment assembly
10Set of ring set, dowel for connection rod, bolt for connecting rod, conneting rod assembly and joint for gear assembly
11Taking out radiator from engine drain out coolant and descaling and cleanning with cleaning agent cleaning of fins by applying pressuried air using blower including replacement of rubber housing set complete
12Taking out old/unsv engine belt and replacement of grooved belt complete
13Taking out fuel pump, transporting to authorise workshop, dismantling of pump carefully and overhauling complete, replacement of complete pump kit and plunger kitand all other defective parts of fuel pump complete incl reassembling and refixing complete
14Taking out all leaked/deterioted rubber hoses of engine and replacement of hose pipes including clamps complete.
15Taking out old unsv fuel pipes and replacement of new nylon reinforced PVC fuel pipes with threaded sockets complete set, oil seal, seal O ring, screw captive washer cap
16Taking out defective dynamo from diesel engine for repair and replacementof all bearing, armature, carbon bushes, coil etc as per existing specification and reassembling and refixing incl testing complete
17Scraping of old existing paint, oil from body of alternator, radiator, engine, base frameincluding exhaust pipe/silencer, preparation of surface and filling of cavity using filler material andspray painting to complete DG set 125 KVA alongwith all accessories including fuel tank with two coats ofsuper enamelled paint of superior quality as approved by AGE E/M and writing of MES/SM No. using black paint of suitable font of letters in background of white paint complete all as specified and directed.
18Repair to self starter by taking of defective parts and replacement of armature,field coils, carbon bush, pinion, shocker arm, bearing complete including testing all as specified and directed.
19Flywheel ring complete
20Supply and fixed in repairs ofmultifunctionmeter which indicates KWH/PF/RPM/V/A and other parameters suitable for 35 KVA DG set
21Material & labour for battery copper cable PVC Insulated single core of size 35sqmm, 1100 volt including brass terminal with nuts & bolts and apply petroleum jelly on battery terminals including taking out existing cable
22Emergency stop button
23Replacement of ignition switch with wiring complete including providing necessary protective covering to cables etc.
24Solenoid switch with wiring complete
25Repair to Diesel engine generator set 160KVA,air cooled, installed at (i) Central Sewage treatment plant JamnagarMake: Kirloskar SM No.527/6020/DG/12and (ii) AF-II Filtration PlantJamnagar Make: Kirloskar by taking out and repair/replacement of defective parts with new parts as under
26Diesel filter element with gasket
27Inhibitor corrosion tube water bypass & water outlet
28Air cleaner element
29Engine oil filter element complete
30Air Filter (inner & outer)
31Fuel filter bowl pre element & micro element
32Solenoid switch with wiring complete
33Governor cable both inner and outer including RPM adjustment assembly
34Set of ring set, dowel for connection rod, bolt for connecting rod, conneting rod assembly and joint for gear assembly
35Taking out radiator from engine drain out coolant and descaling and cleanning with cleaning agent cleaning of fins by applying pressuried air using blower including replacement of rubber housing set complete
36Taking out old/unsv engine belt and replacement of grooved belt complete
37Taking out fuel pump,transporting to auth workshop, dismantling of pump carefully and overhauling complete, replacement of complete pump kit and plunger kit and all other defective parts of fuel pump complete incl reassembling and refixing complete
38Taking out all leaked/deterioted rubber hoses of engine and replacement of hose pipes including clamps complete.
39Taking out old unsv fuel pipes and replacement of new nylon reinforced PVC fuel pipes with threaded sockets complete set, oil seal, seal O ring, screw captive washer cap
40Taking out defective dynamo from diesel engine for repair and replacementof all bearing, armature, carbon bushes, coil etc as per existing specification and reassembling and refixing incl testing complete
41Scraping of old existing paint, oil from body of alternator, radiator, engine, base frameincluding exhaust pipe/silencer, preparation of surface and filling of cavity using filler material andspray painting to complete DG set 125 KVA alongwith all accessories including fuel tank with two coats ofsuper enamelled paint of superior quality as approved by AGE E/M and writing of MES/SM No. using black paint of suitable font of letters in background of white paint complete all as specified and directed.
42Repair to self starter by taking of defective parts and replacement of armature, field coils, carbon bush, pinion, shocker arm, bearing complete including testing all as specified and directed.
43Flywheel ring complete
44Supply and fixed in repairs ofmultifunctionmeter which indicates KWH/PF/RPM/V/A and other parameters suitable for 35 KVA DG set
45Material & labour for battery copper cablePVC Insulated single core of size 35sqmm ,1100 volt including brass terminal with nuts & bolts and apply petroleum jelly on battery terminals including taking out existing cable
46Emergency stop button
47Replacement of ignition switch with wiring complete including providing necessary protective covering to cables etc.
48Solenoid switch with wiring complete
49Repair to Diesel engine generator set 25KVA installed at (i) PS-I STP Installation at Jamnagar Make:Kirloskar SM No. 527/6016/DG/12(ii) STP KhambhaliyaMake : Greaves No:1108031405501 and (iii) AF Net area DwarkaMake : Cummins No.83061103987 by taking out and repair/replacement of defective parts with new parts as under
50Diesel filter element with gasket
51Inhibitor corrosion tube water bypass & water outlet
52Air cleaner element
53Engine oil filter element complete
54Air Filter (inner & outer)
55Fuel filter bowl pre element & micro element
56Solenoid switch with wiring complete
57Governor cable both inner and outer including RPM adjustment assembly
58Set of ring set, dowel for connection rod, bolt for connecting rod, conneting rod assembly and joint for gear assembly
59Taking out radiator from engine drain out coolant and descaling and cleanning with cleaning agent cleaning of fins by applying pressuried air using blower including replacement of rubber housing set complete
60Taking out old/unsv engine belt and replacement of grooved belt complete
61Taking out fuel pump,transporting to auth workshop, dismantling of pump carefully and overhauling complete, replacement of complete pump kit and plunger kitand all other defective parts of fuel pump complete incl reassembling and refixing complete
62Taking out all leaked/deterioted rubber hoses of engine and replacement of hose pipes including clamps complete.
63Taking out old unsv fuel pipes and replacement of new nylon reinforced PVC fuel pipes with threaded sockets complete set, oil seal, seal O ring, screw captive washer cap
64Taking out defective dynamo from diesel engine for repair and replacementof all bearing, armature, carbon bushes, coil etc as per existing specification and reassembling and refixing incl testing complete
65Scraping of old existing paint, oil from body of alternator, radiator, engine, base frameincluding exhaust pipe/silencer, preparation of surface and filling of cavity using filler material andspray painting to complete DG set 125 KVA alongwith all accessories including fuel tank with two coats of super enamelled paint of superior quality as approved by AGE E/M and writing of MES/SM No. using black paint of suitable font of letters in background of white paint complete all as specified and as directed by Engr-in-charge
66Repair to self starter by taking of defective parts and replacement of armature, field coils, carbon bush, pinion, shocker arm, bearing complete including testing all as specified and as directed
67Flywheel ring complete
68Supply and fixed in repairs ofmultifunctionmeter which indicates KWH/PF/RPM/V/A and other parameters suitable for 35 KVA DG set
69Material & labour for battery copper cablePVC Insulated single core of size 35sqmm ,1100 volt including brass terminal with nuts & bolts and apply petroleum jelly on battery terminals including taking out existing cable
70Emergency stop button
71Replacement of ignition switch with wiring complete including providing necessary protective covering to cables etc.
72Solenoid switch with wiring complete
73Repair to Diesel engine generator set 35KVA installed at(i) PS-II STP Installation at Jamnagar Make:Kirloskar SM No:527/6017/DG/12and (ii) AFNET Area Khambhaliya Make: Kirloskar No;0920598 by taking out and repair/replacement of defective parts with new parts as under
74Diesel filter element with gasket
75Inhibitor corrosion tube water bypass & water outlet
76Air cleaner element
77Engine oil filter element complete
78Air Filter (inner & outer)
79Fuel filter bowl pre element & micro element
80Solenoid switch with wiring complete
81Governor cable both inner and outer including RPM adjustment assembly
82Set of ring set, dowel for connection rod, bolt for connecting rod, conneting rod assembly and joint for gear assembly
83Taking out radiator from engine drain out coolant and descaling and cleanning with cleaning agent cleaning of fins by applying pressuried air using blower including replacement of rubber housing set complete
84Taking out old/unsv engine belt and replacement of grooved belt complete
85Taking out fuel pump, transporting to auth workshop, dismantling of pump carefully and overhauling complete, replacement of complete pump kit and plunger kitand all other defective parts of fuel pump complete incl reassembling and refixing complete
86Taking out all leaked/deterioted rubber hoses of engine and replacement of hose pipes including clamps complete.
87Taking out old unsv fuel pipes and replacement of new nylon reinforced PVC fuel pipes with threaded sockets complete set, oil seal, seal O ring, screw captive washer cap
88Taking out defective dynamo from diesel engine for repair and replacementof all bearing, armature, carbon bushes, coil etc as per existing specification and reassembling and refixing incl testing complete
89Scraping of old existing paint, oil from body of alternator, radiator, engine, base frameincluding exhaust pipe/silencer, preparation of surface and filling of cavity using filler material andspray painting to complete DG set 125 KVA alongwith all accessories including fuel tank with two coats of super enamelled paint of superior quality as approved by AGE E/M and writing of MES/SM No. using black paint of suitable font of letters in background of white paint complete all as specified and as directed by Engr-in-charge
90Repair to self starter by taking of defective parts and replacement of armature,field coils, carbon bush, pinion, shocker arm, bearing complete including testing all as specified and as directed
91Flywheel ring complete
92Supply and fixed in repairs ofmultifunctionmeter which indicates KWH/PF/RPM/V/A and other parameters suitable for 35 KVA DG set
93Material & labour for battery copper cablePVC Insulated single core of size 35sqmm, 1100 volt including brass terminal with nuts & bolts and apply petroleum jelly on battery terminals including taking out existing cable
94Emergency stop button
95Replacement of ignition switch with wiring complete including providing necessary protective covering to cables etc.
96Solenoid switch with wiring complete
97Repair to Diesel engine generator set 75KVA installed at PS-III STP Installation Make: CumminsSM No. 527/6017/DG/12 by taking out and repair/replacement of defective parts with new parts as under
98Diesel filter element with gasket
99Inhibitor corrosion tube water bypass & water outlet
100Air cleaner element
101Engine oil filter element complete
102Air Filter (inner & outer)
103Fuel filter bowl pre element & micro element
104Solenoid switch with wiring complete
105Governor cable both inner and outer including RPM adjustment assembly
106Set of ring set, dowel for connection rod, bolt for connecting rod, conneting rod assembly and joint for gear assembly
107Taking out radiator from engine drain out coolant and descaling and cleanning with cleaning agent cleaning of fins by applying pressuried air using blower including replacement of rubber housing set complete
108Taking out old/unsv engine belt and replacement of grooved belt complete
109Taking out fuel pump,transporting to auth workshop, dismantling of pump carefully and overhauling complete, replacement of complete pump kit and plunger kit and all other defective parts of fuel pump complete incl reassembling and refixing complete
110Taking out all leaked/deterioted rubber hoses of engine and replacement of hose pipes including clamps complete.
111Taking out old unsv fuel pipes and replacement of new nylon reinforced PVC fuel pipes with threaded sockets complete set, oil seal, seal O ring, screw captive washer cap
112Taking out defective dynamo from diesel engine for repair and replacementof all bearing, armature, carbon bushes, coil etc as per existing specification and reassembling and refixing incl testing complete
113Scraping of old existing paint, oil from body of alternator, radiator, engine, base frameincluding exhaust pipe/silencer, preparation of surface and filling of cavity using filler material andspray painting to complete DG set 125 KVA alongwith all accessories including fuel tank with two coats of super enamelled paint of superior quality as approved by AGE E/M and writing of MES/SM No. using black paint of suitable font of letters in background of white paint complete all as specified and as directed by Engr-in-charge
114Repair to self starter by taking of defective parts and replacement of armature,field coils, carbon bush, pinion, shocker arm, bearing complete including testing all as specified and as directed
115Flywheel ring complete
116Supply and fixed in repairs ofmultifunctionmeter which indicates KWH/PF/RPM/V/A and other parameters suitable for 35 KVA DG set
117Material & labour for battery copper cablePVC Insulated single core of size 35sqmm ,1100 volt including brass terminal with nuts & bolts and apply petroleum jelly on battery terminals including taking out existing cable
118Emergency stop button
119Replacement of ignition switch with wiring complete including providing necessary protective covering to cables etc.
120Solenoid switch with wiring complete
121Repair to Diesel engine generator set 50KVA-03 nos installed AF-II Pump HouseInstallation Jamnagar (i) Make: KirloskarSM No. 527/6014/DG/12& (ii) Make: Greaves SM No. 527/6029/DG/13 and (iii) Air Men Mess Khambhaliya Make:Mahindra No.N4D16500841 by taking out and repair/replacement of defective parts with new parts as under
122Diesel filter element with gasket
123Inhibitor corrosion tube water bypass & water outlet
124Air cleaner element
125Engine oil filter element complete
126Air Filter (inner & outer)
127Fuel filter bowl pre element & micro element
128Solenoid switch with wiring complete
129Governor cable both inner and outer including RPM adjustment assembly
130Set of ring set, dowel for connection rod, bolt for connecting rod, conneting rod assembly and joint for gear assembly
131Taking out radiator from engine drain out coolant and descaling and cleanning with cleaning agent cleaning of fins by applying pressuried air using blower including replacement of rubber housing set complete
132Taking out old/unsv engine belt and replacement of grooved belt complete
133Taking out fuel pump,transporting to auth workshop, dismantling of pump carefully and overhauling complete, replacement of complete pump kit and plunger kitand all other defective parts of fuel pump complete incl reassembling and refixing complete
134Taking out all leaked/deterioted rubber hoses of engine and replacement of hose pipes including clamps complete.
135Taking out old unsv fuel pipes and replacement of new nylon reinforced PVC fuel pipes with threaded sockets complete set, oil seal, seal O ring, screw captive washer cap
136Taking out defective dynamo from diesel engine for repair and replacementof all bearing, armature, carbon bushes, coil etc as per existing specification and reassembling and refixing incl testing complete
137Scraping of old existing paint, oil from body of alternator, radiator, engine, base frameincluding exhaust pipe/silencer, preparation of surface and filling of cavity using filler material andspray painting to complete DG set 125 KVA alongwith all accessories including fuel tank with two coats ofsuper enamelled paint of superior quality as approved by AGE E/M and writing of MES/SM No. using black paint of suitable font of letters in background of white paint complete all as specified and as directed by Engr-in-charge
138Repair to self starter by taking of defective parts and replacement of armature,field coils, carbon bush, pinion, shocker arm, bearing complete including testing all as specified and as directed
139Flywheel ring complete
140Supply and fixed in repairs ofmultifunctionmeter which indicates KWH/PF/RPM/V/A and other parameters suitable for 35 KVA DG set
141Material & labour for battery copper cablePVC Insulated single core of size 35sqmm ,1100 volt including brass terminal with nuts & bolts and apply petroleum jelly on battery terminals including taking out existing cable
142emergency stop button
143Replacement of ignition switch with wiring complete including providing necessary protective covering to cables etc.
144Solenoid switch with wiring complete
145Repair to Diesel engine generator set 20KVA installed at(i)Main Pump House Khambhaliya Make: Kirloskar 1000001and (ii) Dwarka Pump House Make:Kirloskar SM No.527/6026/DG/12 by taking out and repair/replacement of defective parts with new parts as under:
146Diesel filter element with gasket
147Inhibitor corrosion tube water bypass & water outlet
148Air cleaner element
149Engine oil filter element complete
150Air Filter (inner & outer)
151Fuel filter bowl pre element & micro element
152Solenoid switch with wiring complete
153Governor cable both inner and outer including RPM adjustment assembly
154Set of ring set, dowel for connection rod, bolt for connecting rod, conneting rod assembly and joint for gear assembly
155Taking out radiator from engine drain out coolant and descaling and cleanning with cleaning agent cleaning of fins by applying pressuried air using blower including replacement of rubber housing set complete
156Taking out old/unsv engine belt and replacement of grooved belt complete
157Taking out fuel pump, transporting to auth workshop,dismantling of pump carefully and overhauling complete, replacement of complete pump kit and plunger kitand all other defective parts of fuel pump complete incl reassembling and refixing complete
158Taking out all leaked/deterioted rubber hoses of engine and replacement of hose pipes including clamps complete.
159Taking out old unsv fuel pipes and replacement of new nylon reinforced PVC fuel pipes with threaded sockets complete set, oil seal, seal O ring, screw captive washer cap
160Taking out defective dynamo from diesel engine for repair and replacementof all bearing, armature, carbon bushes, coil etc as per existing specification and reassembling and refixing incl testing complete
161Scraping of old existing paint, oil from body of alternator, radiator, engine, base frameincluding exhaust pipe/silencer, preparation of surface and filling of cavity using filler material andspray painting to complete DG set 125 KVA alongwith all accessories including fuel tank with two coats ofsuper enamelled paint of superior quality as approved by AGE E/M and writing of MES/SM No. using black paint of suitable font of letters in background of white paint complete all as specified and as directed by Engr-in-charge
162Repair to self starter by taking of defective parts and replacement of armature,field coils, carbon bush, pinion, shocker arm, bearing complete including testing all as specified and as directed
163Flywheel ring complete
164Supply and fixed in repairs ofmultifunctionmeter which indicates KWH/PF/RPM/V/A and other parameters suitable for 35 KVA DG set
165Material & labour for battery copper cablePVC Insulated single core of size 35sqmm ,1100 volt including brass terminal with nuts & bolts and apply petroleum jelly on battery terminals including taking out existing cable
166Emergency stop button
167Replacement of ignition switch with wiring complete including providing necessary protective covering to cables etc.
168Solenoid switch with wiring complete
169M&L for repair to Diesel engine generator set 100KVA installed at(i)MAP Pump house, Jamnagar Make: Greaves No 1308041 and (ii) New offr mess khambhaliya Make:Mahindra No ERG2D13109 by taking out and repair/replacement of defective parts with new parts as under:
170Diesel filter element with gasket
171Inhibitor corrosion tube water bypass & water outlet
172Air cleaner element
173Engine oil filter element complete
174Air Filter (inner & outer)
175Fuel filter bowl pre element & micro element
176Solenoid switch with wiring complete
177Governor cable both inner and outer including RPM adjustment assembly
178Set of ring set, dowel for connection rod, bolt for connecting rod, conneting rod assembly and joint for gear assembly
179Taking out radiator from engine drain out coolant and descaling and cleanning with cleaning agent cleaning of fins by applying pressuried air using blower including replacement of rubber housing set complete
180Taking out old/unsv engine belt and replacement of grooved belt complete
181Taking out fuel pump, transporting to auth workshop, dismantling of pump carefully and overhauling complete, replacement of complete pump kit and plunger kitand all other defective parts of fuel pump complete incl reassembling and refixing complete
182Taking out all leaked/deterioted rubber hoses of engine and replacement of hose pipes including clamps complete.
183Taking out old unsv fuel pipes and replacement of new nylon reinforced PVC fuel pipes with threaded sockets complete set, oil seal, seal O ring, screw captive washer cap
184Taking out defective dynamo from diesel engine for repair and replacementof all bearing, armature, carbon bushes, coil etc as per existing specification and reassembling and refixing incl testing complete
185Scraping of old existing paint, oil from body of alternator, radiator, engine, base frameincluding exhaust pipe/silencer, preparation of surface and filling of cavity using filler material andspray painting to complete DG set 125 KVA alongwith all accessories including fuel tank with two coats ofsuper enamelled paint of superior quality as approved by AGE E/M and writing of MES/SM No. using black paint of suitable font of letters in background of white paint complete all as specified and as directed by Engr-in-charge
186Repair to self starter by taking of defective parts and replacement of armature,field coils, carbon bush, pinion, shocker arm, bearing complete including testing all as specified and as directed
187Flywheel ring complete
188Supply and fixed in repairs ofmultifunctionmeter which indicates KWH/PF/RPM/V/A and other parameters suitable for 35 KVA DG set
189Material & labour for battery copper cablePVC Insulated single core of size 35sqmm ,1100 volt including brass terminal with nuts & bolts and apply petroleum jelly on battery terminals including taking out existing cable
190Emergency stop button
191Replacement of ignition switch with wiring complete including providing necessary protective covering to cables etc.
192Solenoid switch with wiring complete
193Repair to Diesel engine generator set 15KVA installed atTech Area at DwarkaMake: Kirloskar 1221092 by taking out and repair/replacement of defective parts with new parts as under:
194Diesel filter element with gasket
195Inhibitor corrosion tube water bypass & water outlet
196Air cleaner element
197Engine oil filter element complete
198Air Filter (inner & outer)
199Fuel filter bowl pre element & micro element
200Solenoid switch with wiring complete
201Governor cable both inner and outer including RPM adjustment assembly
202Set of ring set, dowel for connection rod, bolt for connecting rod, conneting rod assembly and joint for gear assembly
203Taking out radiator from engine drain out coolant and descaling and cleanning with cleaning agent cleaning of fins by applying pressuried air using blower including replacement of rubber housing set complete
204Taking out old/unsv engine belt and replacement of grooved belt complete
205Taking out fuel pump, transporting to auth workshop, dismantling of pump carefully and overhauling complete, replacement of complete pump kit and plunger kit and all other defective parts of fuel pump complete incl reassembling and refixing complete
206Taking out all leaked/deterioted rubber hoses of engine and replacement of hose pipes including clamps complete.
207Taking out old unsv fuel pipes and replacement of new nylon reinforced PVC fuel pipes with threaded sockets complete set, oil seal, seal O ring, screw captive washer cap
208Taking out defective dynamo from diesel engine for repair and replacementof all bearing, armature, carbon bushes, coil etc as per existing specification and reassembling and refixing incl testing complete
209Scraping of old existing paint, oil from body of alternator, radiator, engine, base frameincluding exhaust pipe/silencer, preparation of surface and filling of cavity using filler material andspray painting to complete DG set 125 KVA alongwith all accessories including fuel tank with two coats ofsuper enamelled paint of superior quality as approved by AGE E/M and writing of MES/SM No. using black paint of suitable font of letters in background of white paint complete all as specified and as directed by Engr-in-charge
210Repair to self starter by taking of defective parts and replacement of armature,field coils, carbon bush, pinion, shocker arm, bearing complete including testing all as specified and as directed
211Flywheel ring complete
212Supply and fixed in repairs ofmultifunctionmeter which indicates KWH/PF/RPM/V/A and other parameters suitable for 35 KVA DG set
213Material & labour for battery copper cablePVC Insulated single core of size 35sqmm, 1100 volt including brass terminal with nuts & bolts and apply petroleum jelly on battery terminals including taking out existing cable
214Emergency stop button
215Replacement of ignition switch with wiring complete including providing necessary protective covering to cables etc.
216Solenoid switch with wiring complete
217M&L for replacement of battery 12 V 105 Ah maintenance free for DG set. Make: Exide Gen plus cat no: GP115E41L or equivelent as approved by Engr-in-charge.
218M&L for replacement of battery 12 V 90 Ah maintenance free for DG set. Make: Exide Gen plus cat no: GP110D31R or equivelent as approved by Engr-in-charge.
219M & L for earthing with SAFE EARTHING ELECTRODE (S.E.E) conforming to IS :3043-1987 with zinc coated earthing electrode with coating thickness of 100 microns using pipe in pipe technologymethod with 3 Mtr long, 42mm inner dia and 76mm outerdia GI rod connected with and including 25 mm x 3 mm size GI strip upto 7.5 m, fixing of electrode by boring 150 mm dia hole up to 3.30 meter depth in any type of soil with mechanical apparatus, returning filling with back fill compound(BFC) 25*2 KGcompound bags including GI tubing 40 mm dia with necessary fittings light grade as protection to GI strip complete with FRP earthing protection chamber along of size 420 mm x 420 mm at top, 340 mm x 340 mm at bottom, height 210 mm with FRP chamber cover and including FRP Earthing result display board of size 254 mm x 380 mm made out of plastic material showing the information replated to type of earthing, earthing result, due date of testing etc along with fixing stand 610 mm height made of angle ironas per manufactures instruction and as specified. Make:- POWERTRAC McML Earthing solution
220M&L for Earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or fixed to poles or any other indicated situation for loop earthing etc. as required 25x4mm galvanised iron strip
221M& L for strip opening of battery charger 12V/24V ,dismantling and taking out defectivepartsof battery charging sets with replacement of following items :-
222Power Transformer to convert AC 100V to 24V
223Voltage Regulator
224Diode Bridge 2A
225Variable Resister 2 Watt
226Ampere meter 0-500A analog type
227Voltmeter 0-30V analog type
228AC input cable cord complete with 2 pin plug
229S & F electricalinsulated rubber mat of size 1m x 2m x 12mm thick confirming to IS:15652:2006 complete all as specified and directed.
230S&F in repair MCCB 160 Amps, 4 pole, breaking capacity 25 kA, fixed type fixed in existing panel & connecting complete all as specified & directed. Make :- Havell"s/C&S/ABB
231S&F in repair MCCB 100 Amps, 3 pole, breaking capacity 25 kA, fixed typefixed in existing panel & connecting complete all as specified & directed. Make :- Havell"s/C&S/ABB
232Supply & fix in repair lubricant oil pump assembly suitable for DG set 10 KVA to 75 KVA Make: Kirloskar
233Supply & fix in repair lubricant oil pump assembly suitable for DG set 82.5KVA to 200 KVA Make: Kirloskar /Greaves/Cummins
234Supply & fix in repair silencer assembly complete suitable for DG set cap 10 to 75 KVA Make : Kirloskar/Cummins
235Supply and fix in repair oil pressure gauge all as specified. Make:- Kirloskar / Cummins / Greaves
236S&F in repair Digital type DC Voltmeter, 0 to 30 V DC, size 96 mm x 96 mmfixing in existing AMF panel & connecting complete all as specified & directed.
237S&F in repair Digitaltype DC Ammeter, 0 to 20 ADC, size 96 mm x 96 mmfixing in existing AMF panel & connecting complete all as specified & directed.
238M & L for AMF panel maintainance including power relay terminals blocks for DG set of capacity 63KVA to 160 KVA complete all as specified and directed.
239M & L for Tank Repair of 125/160/100 KVA DG Set as specified and directed.
240M & L for Tank Repair of up to100 KVA DG Set as specified & directed.
241Supply & filling of new Coolant oil including taking out unserviceable oil. Make:Castrol/Valvoline/Servo
242Draining out old unsv engine oilfrom chamber, cleaning of oil sump complete and filling of new oil confirming to specification. Make:Castrol/Valvoline/Servo
243M&L for Plain cement concrete 1:4:8 type D2 (Using 40mm graded crushed stone agg) as in foundation of poles and mass concrete complete including necessary excuavation and earth work in any type of soil all as specified.
244S&F in repair 4 Pole 140 Amp power contactor,AC 3 rating, fixed in existing panel & connecting complete all as specified & directed. Make L&T (Type MNX 140) or equivalent of make siemens / ABB
245S&F in repair 4 Pole 95 Amp power contactor,AC 3 rating, fixed in existing panel & connecting complete all as specified & directed. Make L&T (Type MNX 95) or equivalent of make siemens/ABB
246M&L in repair for Dial type mechanical fuel level indicator for any capacity DG set complete all as specified & directed.
247S&F in repair Automatic voltage regulator (AVR) Suitable for DG Set 125/160/100 KVA
248Supply & fix in repair turbocharger assemblysuitable for DG up to 100 KVA Make: Kirloskar/Greaves/Cummins
249S&F in repair Automatic voltage regulator (AVR) Suitable for DG Set 10 to 83KVA
250Supply & fix in repair turbocharger assemblysuitable for DG above 100 and up to 200 KVA Make: Kirloskar/Greaves/Cummins
251Supply & fix in repair water pump pulley SPA section (120 PCD) suitable for DG set 10KVA to 75 KVA Make: Kirloskar
252Supply & fix in repair water pump pulley SPA section (120 PCD) suitable for DG set 82.5KVA to 200 KVA Make: Kirloskar / Greaves / Cummins
253S & F in repair electronic controller for AMF panel of capacity 63to 100 KVA DG sets showing the complete details to run the DG sets and to stop the DG sets complete with logical programming as per existing AMF panel all as directed. Make : Wood Word / Deep sea Electronic
254S & F in repair electronic controller for AMF panel of capacity 125 to 160 KVA DG sets showing the complete details to run the DG sets and to stop the DG sets complete with logical programming as per existing AMF panel all as directed. Make : Wood Word / Deep sea Electronic
255Preventive maintenance for indoor and outdoor type RMU (safeplus or safelink ring type) comprising preventive maintenance activities and repairing the RMU during breakdown / emergency and routine testing including taking out and repair / replacement of defective parts with new parts all as specified below:- Note: Quoted rates shall be deemed to include for the following:- (i) Preventive maintenance shall be carried out one time in year. (ii) Contractor shall also responsible for repairing the RMU during any breakdown / emergency. (with in contract period deemed including coated rates) (iii) Routine testing shall be carried out once in a year. (iv) Contractor shall also responsible for supply & refilling of gas required for RMU.
256A. The following scope of work shall be included under preventive maintenance :-
257(a)Condition monitoring as per the scope defined:- Condition based & Predictive maintenance. Preventive maintenance. Breakdown maintenance. Overhauling, reconditioning & testing of existingequipment. Failure analysis for major breakdown
258(b)Performance Health Check-up Checking of CB & Isolator mechanical & electrical operation Closing & tripping Checking of Breaker close & open operation. Mechanism Critical setting & adjustment shall be done. Lubrication of mechanical critical part of Circuit breaker. Lubrication of spring charging mechanism. Operational Movement & alignment. Alignment of open cable doors. Physical healthiness of switches, indication lamp, auxiliary relay etc. Bus bar tightness, bus joint healthiness checks & contact resistance check.
259(c) Routine Tests (performed once in a year) Testing of protection relays. CB contact resistance, contact condition the pole. Interupter health check by HV test.
260(d)Reports: Relay test report Breaker test report CT/PT test report Failure reports of major failure-Which includes failure mechanism analysis & remedies Interpretation of condition monitoring data.
261B.Check list for breaker preventive maintenance :-
262Mimic diagram checking. Spring Charging of HT breaker -by manual operation. Spring Charging of HT breaker -by motor if available. All limit switch operation healthiness for motorized module. Closing of breaker by push button. Opening of breaker by push button . BKR on/ off indication sticker. Disconnector closing and opening. Disconnector Earth switch closing and opening checking. Disconnector ON/Off indication sticker.
263Remote close of BKR if closing coil available. Remote opening of BKR by series trip coil. Remote opening of BKR by shut trip coil if available. Padlock Movement of Disconnector and Breaker. Interlock between breaker On condition and Disconnector. Interlock between BKR OFF condition and Disconnector. Cable door interlock with Earth switch on/off condition. Handle locater of Disconnecter healthiness. Interlock of cable door with respect to BKR and disconnector. Relay self power battery healthiness - if self power. Relay display healthiness. Remote Closing - if available. Series trip coil healthiness.
264Remote tripping of relay. Shunt trip coil healthiness/ remote tripping . Termination boots position / termination bushing cover. Proper Termination boot earthing for 22/33 KV. Termination Tightness ( 30/ 50 Nm). Terminated cable support condition. Cable gland sealing checking. VPIS healthiness OK. CT ratio installed in BKR compartment. CT connection tightness. Cable boot fixing healthiness. Cable boot earthing for 22 KV and 33 KV. Cable support. Cable Gland provision.
265C. Check list for RMU preventive Maintenance :- Grouting of Frame/ channel on foundation tightened. Earthing connection of RMU . Outer Visual inspection of RMU. Sealing of RMU / any opening for insertion RMU. SF6 gas level indication position in zone. DC power pack operation healthiness - 24 V. Battery 24 V DC healthiness. 230 V AC supply requirement / availability. Coupling Box Cover fixing if RMU extensible and coupled. Coupling Bus bar tightness. Coupling boot earthing. Not any opening on box up. Electrical testing status.
266D.Operational check points for isolator / cable switch Module :- Operational Check Points for Isolator Module Mimic diagram checking. Isolator / cable switch on/off manual operation by handle. Isolator / cable switch on/off operation by motor operation if available (Locally). Isolator / cable switch on operation by motor operation if available (Remotely). Isolator / cable switch off operation by motor operation if available (Remotely). All limit switch operation healthiness for motorized Rmu.
267Padlock Movement of Isolator / Cable switch. Isolator on/ off indication sticker. Earth switch Operation. Cable door opening and closing smoothness. Cable door interlock with Earth switch on/off condition. Pad lock & selector switch movement. Handle locater of Disconnecter healthiness. VPIS healthiness. Termination tightness. Cable boot fixing healthiness . Cable boot earthing for 22 KV and 33 KV. Cable support. Cable Gland provision.
268Note: (i) RMU of make ABB & Crompton are installed at site. Preventive maintenance, repairing the RMU during breakdown / emergency and routine testing shall be carried out through authorised representative of OEM (ii) Spare parts required for Preventive maintenance, repairing the RMU during breakdown / emergency will be measured & paid separately as supply only. Make of spare part shall be as existing make or as recommended by the OEM. (iii)Contractor shall submit necessary documentary evidence that Preventive maintenance, repairing the RMU during breakdown / emergency and routine testing has been performed by the OEM. (vi)RMU any type any way including VCB, load break switch and metering unit will be measured as one unit for payment. (v) After Preventive maintenance, repairing the RMU during breakdown / emergency RMU shall be tested as directed by the Engineer-in-Charge and test result in triplicate copy shall be submitted to Engineer-in-Charge
269Preventive maintenance for 160-400 KVA compact substation (CSS) comprising transformer, RMU / VCB, LT Panel / APFC Panelby performing preventive maintenance activities and repairing the CSS during breakdown / emergency and routine testing including taking out and repair / replacement of defective parts with new parts all as specified below:-
270Note:- Quoted rates shall be deemed to include for the following:- (i) Preventive maintenance shall be carried out one time in year. (ii) Contractor shall also responsible for repairing the CSS during any breakdown / emergency (with in contract period deemed including coated rates) (iii) routine testing shall be carried out once in a year. (iv)Dehydration/filtration/oil filling carried out by contractor. (v)Spare parts required for Preventive maintenance, repairing the CSS during breakdown / emergency will be deemed to included in this item. Make of spare part shall be as per existing make or as recommended by the OEM.
271Checking of circuit breaker mechanical & electrical operation closing & tripping. Checking of CSS & earth s/w close & open operation. Mechanism critical setting and adjustment shall be done. Lubrication of mechanical critical parts of circuit breaker shall be done. Lubrication of spring mechanism shall be carried out. Checking the movement and interlocks of RMU with VCB & isolator. Checking of alignment of open cable doors. Physical healthiness of switches, indication lamp, aux relays. Bus bar tightness , bus joint healthiness checks by torque wrench and contact resistance check. Any other service point observed Planning & updating maintenance
272Routine testing of CSS Testing of protection relay by secondary injection test. Routine testing of transformer. Check the trip operation of the breaker through relay Primary injection test on CTs. Contact resistance testing on breaker and bus joints Ratio check of potential transformer Checked the open delta voltage ( if applicable) Megger & HV test.
273B. Check list for CSS preventive Maintenance :- (a) Common check point :- Visual Inspection of CSS Visual Inspection of side wall of CSS Earthing pit connection checking Earthing pit Healthiness verification-ground resistance Opening and Closing of HT door Opening and Closing of Metering Door Opening and Closing of Trafo door -1 Opening and Closing of Trafo door -2 Opening and Closing of LT door Operation Healthiness HT door limit switch Operation Healthiness Trfo door limit switch -1- HT tripping /alarm Operation Healthiness Trafo door limit switch -2- HT tripping / alarm Operation Healthiness LT door limit switch
274(c) Operational checking point of HT panel :- SF6 gas level indication - position in zone DC power pack operation healthiness Battery 24 V DC healthiness Spring Charging of HT breaker -by manual operation Spring Charging of HT breaker -by motor operation if available Closing of breaker by push button Opening of breaker by push button Off load Isolator closing and opening Earth switch closing and opening checking Interlock between breaker and off load isolator Interlock between Earth switch and off load isolator Interlock of earth switch and BKR cable door
275ON load isolator operation of closing and opening by manual ON load isolator operation of closing and opening by motor if available ON load isolatorearth switch operation ON load Isolator Interlock of earth switch and cable door Individual opening and closing of cable door -ON load isolater Individual opening and closing of cable door -Breaker-3 Earthing tightness checking of HT Breaker.
276Termination Tightness verification of all three HT module Ensure - for proper Gland plate, Cable support , termination boot. Ensure - cable bushing must be unloaded Tripping coil healthily in operation Remote tripping of HT breaker. Relay self power battery checking. Relay trip test operation checking Reading in measurement checking / healthiness of relay by testing . VPIS healthiness Transformer protection Relay working Earth Fault indicator testing / resetting All Padlock checking of RMU
277(d) Transformer Check Points :- Visual inspection of transformer Check oil leakage Check oil level in transformer Visual inspection of bushing & bolt. Insulation resistance of Trafo cable Insulation resistance of Transformer Tightness of HT bushing Tightness of Bus bar Transformer earthing CSS body earthing Hooter operation healthiness checking Pressure relief Valve healthiness Pressure relief Valve and HT tripping/alarm verification if provided WTI reading verification WTI operation tripping / alarm checking OTI reading verification OTI operation tripping / alarm checking Tap change over operation healthiness. Transformer compartment lamp Proper HT Cable support GI earthing strip supporting Insulator condition
278(e) LT compartment Check Points :- Manual operation of ACB - charging , Manual closing and opening. Charging of ACB by Motor if available Tightness off all bus bar Earthing connection verification. Indication Lamp of Phase LT BKR / ACB indication ( alarm / trip) & Protection relay working- LT
279Note: (i) Preventive maintenance, repairing the CSS during breakdown / emergency and routine testing shall be carried out through authorized representative of OEM. (ii)Contractor shall submit necessary documentary evidence that Preventive maintenance, repairing the CSS during breakdown / emergency and routine testing has been performed by the OEM (iii) After Preventive maintenance, repairing the CSS during breakdown / emergency CSS shall be tested as directed by the Engineer-in-Charge and test result in triplicate copy shall be submitted to Engineer-in-Charge
280Supply only spare part to be used for SAFEPLUS RING MAIN UNIT as under:-
281Supply only Bushing 400 Series Bolted Type item Code NHP201699R1
282Supply only O Ring 72 x 6 BUSHING 400 SERIES BOLTED item Code NHP402076P15
283Supply only SHAFT FOR OPERATING HANDEL item code NHP304961P1
284Supply only 2PA Mechanism w/o hex rod item code NHP101985R002
285Supply only TRIP COIL SAFEO FORCE AMPL WIC & ASHDA item code 1VDP000142R1
286Supply only Linkage between K and A item code NHP201703R1
287Supply only PUSH BUTTON RED W/ LABEL "O" item code 1SFA616199R1104
288Supply only PUSH BUTTON GREEN W/LABEL "I" item code 1SFA616199R1106
289Supply only BRACKET "A" Mechanism hldg 2 push buttons item codeNHP201536P1
290Supply only Opening Finger, Manual Operating_D item code 2RAA011099A0001
291Supply only Closing Finger, Manual Operating_C item code 2RAA011100A0001
292Supply only BRACKET for "K" Mechanism item codeNHP201495P1
293Supply onlyBRACKET FOR CT MTG RMU RHS item code NHP304233P1
294Supply only24 kV VPIS cord item code PTMVT120702-01
295Supply only Capacitor Unit, VPIS, 9-15kV without cord item code YN1V400916-587
296Supply only PRESSURE REFILLING EQUIPMENT( KAR-6) item code IN54280001-K
297Supply only RONIS KEY WITH HARDWARE item code 4200669056.9005
298Supply only RONIS LOCK & KEY FOR RMU WITH KEY A item code 4200040617.1001
299Supply only RONIS KEY INTERLOCK OF LBS WITH KEY C item code 4200130305.9001
300Supply only RONIS INTERLOCK EL11P OF LBS WITH KEY B item code 4200033538.9005
301Supply only Fuse Holder Assembly item code NHP201487R001
302Supply only TERMINAL PROTECTOR SILCAB (RAYCHEM) for 11kV item code 1VYN303050-060
303Supply only T SHROUD (NEW) for 11kV item code 1VYN403250-92N
304Supply only Reducer Stud for Cable Bushing_A 128 item code 2REA024265P0001
305Supply only Trip Coil Only Y1 Control Volt 24 VDC item code NHP304453R1
306Supply only Close Coil Only Y2 Control Volt 24 VDC item code NHP304453R6
307Supply only O Ring 65 x 5 For LBS Mech Bushing item code NHP402076P24
308Supply only Spring charging Motor with Gear 24 V DC item code NHP201491R1
309Supply only WIKA make Manometer+Gas density switch item code YN1V400929-420
310Supply only ELECTRONIC MOTOR KIT FOR C MODULE-MGVCL item code 4200901778.9004
311Supply only STANDARD MOTORISED KIT FOR V MODULE item code YN1V400922-023
312Supply only BRACKET-FOR RMU (New Indication) item code NHP304264P1
313Supply only Position indicator item code 1VDP001531P001
314Supply only Indicator local item code 1VDP002477P001
315Supply only Shaft item code 1VDP002579P001
316Supply only Indicator Flag C-module OFF item code 1VYN403050-496
317Supply only Indicator Flag C-module ON item code 1VYN403050-498
318Supply only Indicator Flag C-module PLAIN item no 1VYN403050-499
319Supply only Manometer+Gas density switch(CO contact) item code 4200800466.5012
320Supply only STANDARD MOTORISED KIT FOR C MODULE item code YN1V400922-022
321Supply only BATTERY -12VDC ,12AH item code 1VYN401350-173
322Supply only Capacitor Unit,VPIS 15-24kV without cord item code YN1V400916-588
323Supply only S series bushings item code 2REA020480A0001
324Supply only O ring for S series bushing item code 3WEA010283P0001
325Supply only spare part to be used forSAFELINK RING MAIN UNIT as under
326Supply only GEARED MOTOR 24VDC (MS) item code No 1VCR012079G0001
327Supply only SHUNT CLOSING RELEASE -MC 24VDC item code no 1VCR004291G0001
328Supply only VD4 MC Closing Coil (48V AC-DC)) item code no 1VCR004291G0003
329Supply only SHUNT CLOSING RELEASE 110VDC/AC -MC item code No 1VCR004291G0005
330Supply only MC Closing Coil (220-250V DC/220-250V AC) item code no 1VCR004291G0007
331Supply only Tripping coil of VD4 24 VDC item code no 1VCR004289G0001
332Supply only SHUNT OPENING RELEASE 110DC/AC -M01 item code no1VCR004289G0005
333Supply only Open. Coil Mo1 (220-250V DC/220-250V AC) item code no1VCR004289G0007
334Supply only MO2 Assy. (24Vcc)(Additional Trip) item code no 1VCR002985G0001
335Supply only AUX.SWITCH 2NO+3NC PLUG CONN, FORK TYPE item code no GCE7002397R0122
336Supply only AUX.SWITCH 3NO+2NC PLUG CONN, FORK TYPE item code no GCE7002397R0121
337Supply only BKR Auxiliary Switch Assy._C item code no 2REA016209A0001
338Supply only Closing spring signalling item code no 510831-802
339Supply only SWITCH ELEMENT S826 E/L item code no NZN000859P11
340Supply only Auxiliary Switch Assembly item code no 2REA009781A0001
341Supply only Disconnector Mechanism assembly item code no 2REA016749A0001
342Supply only Ring switch mechanism RH item code no 2REA009811A0004
343Supply only Ring switch mechanism LH item code no 2REA014003A0001
344Supply only Bushing+Contact Knives Assembly RH_B item code no 2REA010249A0001
345Supply only Bushing+Contact Knives Assembly LH_B item code no2REA010249A0002
346Supply only TP bushing assembly item code no 2REA010376A0002
347Supply only T-off cable bushing item code no 2REA009169A0001
348Supply only Capacitor Unit, VPIS, 9-15 kV With Cord item code no YN1V400916-587
349Supply only VPIS Cable Switch L1-0.7, L2-0.6, L3-0.5 item code no 2REA014974P0002
350Supply only VPIS Cable T-Off L1-1.36, L2-1.255, L3-1.15 item code no 2REA014974P0001
351Supply only ABB RELAY TYPE REJ 603-REJ603BB401NN3XE item code no YN1V400919-532
352Supply only Operating Handle Assembly_C item code no 2REA017122A0001
353Supply only OPERATION COUNTER item code no 510753-802
354Supply only OPENING SOLENOID ASSEMBLY_B item code no 2REA016775A0001
355Supply only GAS SPRING FRONT DOOR_03 item code no 308(A)-02
356Supply only Manometer assembly item code no 2REA013719P0001
357Supply only Mamometer with density switch assembly item code no 2REA013719P0002
358Note for items No 43 & 44 of BOQ:- Item Code No given for spear part are of make ABB contractor may use spare part of other make as approved by the OEM.
359Note for items No 41 to 44 BOQ:-If any above HT/LT Equipment and connected items become breakdown, the contractor shall locate the problem/fault at site within 12 hours on intimation by JE/Engineer-In-Charge and ensure that the fault is rectified within 24 to 48 Hours , failing which an amount of Rs 200 /- per hour will be recovered as penal recovery from any payment due to the contractor after expiry of 48 hours.)
360Excavation in trenches in hard/dense soil n.exc 1.5 mtr wide & n.exc1.5mtr in depth for laying cables in trenches/pole foundation and getting out complete allas specified.
361Returning, filling in including spreading, levelling, watering and well ramming excavated soilin layers not exceeding 25 cm thick each, filling back in trenches after cables have been laid and tested, poles, stays , struts have been erected and tested complete all as specified.
362Removing of surplus soil to a distance n.exc 50 mtr and depositing at a level n.exc 1.5 mtr above starting point where directed.
363Material & Labour for Sand Cushioning to UG cable 40mm wide 15cm and 8cm thick above and below the cable respectively excluding PCC cable cover on the top of the sand cushioning complete all as specified. Note : Punned thickness of sand will be measured & paid.
364Taking out old unsvreinforced precast concrete cable cover any type from the trenches etc complete all as specified and directed.
365Laying only PCC cable cover for LT / HT UG cable, of any description retrieved from taking down cable covers all as specified and directed.
366Supplying and laying reinforced precast concrete cable cover, class LV Type 2, flat, size 300mm x 180mm x 40mm thick complete all as specified and directed.
367Supply & Fixing GI tubing light grade 80 mm bore for cable protection fixed to poles under floor/ground complete with all fittings all as specified. Make: Jindal/Tata/SuryaPrakash
368Supply & Fixing GI tubing light grade 50 mm bore for cable protection fixed to poles under floor/ground complete with all fittings all as specified.Make: Jindal/Tata/SuryaPrakash
369Taking out old/unsv LT/HT cable any size from trenches/duct , stacking at site , checking by megger and carry out repair/replacement of defective cable complete all as specified and directed by Engr-in-Charge.
370Supply andlaying in trenches or fixing on poles or passing through pipe or under floors LT PVC sheathed armoured cable 1100 Volts grade "Heavy duty", XLPE insulated, multistarnded aluminium conductor served with inner sheating of PVC tape armoured with galvanised steelstrip/wire or tape and overall PVC sheathed of size 150 Sqmm nominal cross sectional area 3.5 core confirming to IS-7098,1998 (part-I) specification. Note: Excavation, earth work, bricks, sand and pipe protection shall be measuredand paid separately (Make : Nicco/RPG/Asain/Finolex)
371Supply andlaying in trenches or fixing on poles or passing through pipe or under floors LT PVC sheathed armoured cable 1100 Volts grade "Heavy duty", XLPE insulated, multistarnded aluminium conductor served with inner sheating of PVC tape armoured with galvanised steelstrip/wire or tape and overall PVC sheathed of size 120 Sqmm nominal cross sectional area 3.5 core confirming to IS-7098,1998 (part-I) specification. Note: Excavation, earth work, bricks, sand and pipe protection shall be measuredand paid separately (Make : Nicco/RPG/Asain/Finolex)
372Supply, laying, jointing, testing and commissioning XLPE insulated, sceened PVC bedded, galvanised stell strip or wire armoured, electricpower cable (heavy duty) with multistranded aluminium conductors,11KV grde of size 95 Sqmm x 3 core, IS-7098 marked , suitable for HT 11KV(E) system, laid in trenches/ducts/encased in GI pipe/fixed to pole complete including taking out old us UG cable all as specified and directed.
373Supply and fixingcable jointing kit for 11 KV grade cable for indoor termination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured Aluminium conductor cable of size 50 to 95 Sq mm.
374Supply and fixingcable jointing kit for 11 KV grade cable forOutdoor termination heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured Aluminium conductor cable of size 50 to 95 Sq mm.
375Supply and fixingcable jointing kit for 11 KV grade cable for straight through heat shrink type joint complete with jointing material and accessories suitable for 3 core XLPE armoured Aluminium conductor cable of size 50 to 95 Sq mm.
376Material & labour for PCC 1:4:8 type D2 using 40mm graded stone aggregate as in foundation of electric poles, struts, blocks with and including necessary form work, and fair finish to exposed surfaces without using extra cement complete all as specified.
377M&L for Earthing complete with galvanised steel earth electrode plate of size 600x600x6mm thick, buried directly in ground (earth pit not less than 2.25m deep below normal ground level) with top edge of the plate not less than 1.50m below normal ground level, connected to galvanised iron earth strip 25 x 4mm up to test point with suitable GI nuts/bolts and brazed properly up to main board including earth pit in cement concrete 1:2:4 type B-1, precast RCC cover in 1:2:4 reinforced with expanded metal, with suitable handle, excavation and earth work in any type of soil and including medium grade GI watering pipe 25mm bore with funnel wire mesh and medium grade GI earth wire protection pipe 50mm bore up to main board complete as shown in electrical plate no 3 of MES schedule Part-I 1991, connected to earthing testing point including taking out existing unsv earthing complete all as specified and testing on completioncomplete all as specified and directed by Engr-in-charge
378All as per item no. 62 above but using galvanised earth lead wire 4.0mm dia as earthing lead
379Supply & fix lightning arrester, metal oxide type suitable for 11 KV system, discharge current capacity 65KA, station class III, with surge monitor and base type mounted on steel structure complete with the following system parameters :-(a) Normal system voltage – 11 KV, System earthing –effectively earth system, Frequency – 50 Hz complete all as specified and directed by engr in charge.
380Taking shut down from main receiving station and disconnecting EHT & HT connection from transformer ofany capacityand disconnecting/ removing of earthing strip from transformer complete all as directed by Engr-in-Charge.
381Repair of transformer of 315KVA capacity and type of step down transformer including re-fixing the transformer on its existing position & connecting the power supply, testing and commissioning, up to the entire satisfaction of Engr-in-Charge in the presence of rep of the Accepting Officer and repair / replacement of the followings: (a) Draining out of existing transformer oil (b) Lifting of core and and winding assembly complete from insidethe transformer after unscrewing all nuts bolts washers and cleaning old / used insulating oil (c) Dismantling damaged laminated sheet cutting / shaping new laminated sheets as per existing part & refixing with existing frame (d) Wrapinginsulating paper over high voltage coil (e) Necessary rewinding of primary core with existing size and quality of copper strip / wire all as directed and approved by Garrison Engineer. (f) Necessary rewinding of secondery core with existing copper wire with new insulation of internally all as directed by Engr-in-charge. (g) Repair / replacement of all other minior parts if found unservicable worn outduring repair. (h) changing all gaskets and Reassembling the transformer transportingto its loation installing testing and commissioningup to the entiresatisfication of Engr in charge in presence of rep of the Acepting officer.
382M&L for rewinding of transformer with Copper winding wire as per existing size and shape duly insulated with 3 layer paper insulation machine wrapping over the winding strips suitable for HV & LV coils including re-assembling the Transformer after re-winding/tightening of transformer core, tightening/replacing of bushing/studs, oil seal etc. both primary and secondary, fixing top cover conservator tank, breather, top cover gasket etc complete all as specified and directed.
383M&L for de-hydration and filteration of Transformer oil of any type and capacity ofTransformers at AF Stn Jamnagar with a dehydration machine till the desired level of dielectric strength of tranformer oil comes to 60 KV (The contractor will test the dielectric strength of oil of each Tranformer & voltage stabilizer before starting dehydration & filteration and after completion of dehydration & filteration process and he will submit a record of same. Each sample of oil will be tested with a transformer oil test machine at site in presence ofconcerned JE"s/Engr-in-charge and test result will be submitted accordingly).
384Supply and refill new Transformer oil in transformershaving low level after heating to the required Temperature for top up. (Transformer oil should be 60 KV dielectic strength and in sealed barrel having proper test certificate from manufacturer).Make of Transformer oil : Transol/Power oil/any brand of Indian oil corporation).
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail