Supply And Installation Of Wifi At Block B Supply, Installation, Commissioning And Testing Of Wifi At Block B Of Hostel, Img
Tender Value
Ref. Documents
Estimated cost
Bid Submission
14 Feb 2022
0 days left
EMD
20000
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Thiruvananthapuram → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Supply And Installation Of Wifi At Block B Supply, Installation, Commissioning And Testing Of Wifi At Block B Of Hostel, Img
BOQ
| Sl. No. | Item Description |
| 1 | A - Active components |
| 2 | 2.4Ghz Ceiling Mount AP -Supply and Installation of 300Mbps Wireless N Ceiling Mount Access Point with 2 x 4dbi internal antenna, Centralized Cloud / HW based Management, Intelligent Monitoring. PoE Support, Minimum transmission Power =19 dBm, Ceiling Mounting Kit. Approved Makes: Cisco, Aruba, TpLink, Sophos |
| 3 | 2.4Ghz + 5.0Ghz Dual Band Ceiling Mount AP - Supply and Installation of AC1350 Wireless MU-MIMO Gigabit Ceiling Mount Access Point with internal antennas, Centralized Cloud /HW based Management, and Intelligent Monitoring. PoE 802.3af Support, Minimum transmission Power =20 and =23 dBm, Ceiling Mounting Kit. Approved Makes : Cisco, Aruba, TpLink, Sophos |
| 4 | H/W AP Controller. - Supply and installation of H/W based Access Point Controller with minimum two network ports. This controller should be from the same manufacturer as the access point. Approved Makes : Cisco, Aruba, TpLink, Sophos |
| 5 | Distribution Switch - Supply of 24× gigabit RJ45 ports and 4× gigabit SFP Slots provide high-speed connections which helps route internal traffic for more efficient use of network resources, IP-MAC-Port Binding, ACL, Port Security, DoS Defend, Storm control, DHCP Snooping, 802.1X, Radius Authentication, L2/L3/L4 QoS and IGMP snooping., Web, CLI (Console Port, Telnet, SSH), SNMP, RMON, and Dual Image bring powerful management capabilities. Approved Makes : Cisco, Aruba, TpLink, Sophos |
| 6 | POE Switch 24 Port 250 W - Supply and Installation of 24× 802.3at/af-compliant PoE+ ports with a total power supply of 250 W*. provide high-speed connections which helps route internal traffic for more efficient use of network resources, IP-MAC-Port Binding, ACL, Port Security, DoS Defend, Storm control, DHCP Snooping, 802.1X, Radius Authentication, L2/L3/L4 QoS and IGMP snooping., Web, CLI (Telnet, SSH), SNMP, RMON, and Dual Image bring powerful management capabilities. Approved Makes : Cisco, Aruba, TpLink, Sophos |
| 7 | POE Switch 16 Port 250 W - Supply and Installation of 16× 802.3at/af-compliant PoE+ ports with a total power supply of 110 W*. provide high-speed connections which helps route internal traffic for more efficient use of network resources, IP-MAC-Port Binding, ACL, Port Security, DoS Defend, Storm control, DHCP Snooping, 802.1X, Radius Authentication, L2/L3/L4 QoS and IGMP snooping., Web, CLI (Telnet, SSH), SNMP, RMON, and Dual Image bring powerful management capabilities. Approved Makes : Cisco, Aruba, TpLink, Sophos |
| 8 | SPD - Supply and Installation of single phase SPD according to EN 61643-11, IEC 61643-11 should be atype 1 + type 2 / class I + class II, 230VAC, Lightning impulse current (10/350 µs) [L+N-PE] (Itotal)50 kA, Lightning impulse current (10/350 µs) [L-N]/[N-PE] (Iimp)25 / 50 kA, Voltage protection level [L-N]/[N-PE] (UP)= 1.5 kV / = 1.5 kV kV, TOV= [L-N] (UT) – Characteristic440 V / 120 min. – withstand, Temporary overvoltage (TOV) [N-PE] (UT) – Characteristic1200 V / 200 ms – withstand, Visual indication on L-N and N-PE, Approvals = KEMA, required metal enclosure, Approved Makes : DEHN, Erico, ABB, Eaton |
| 9 | Gigabit Media Convertor - Supply of Gigabit Single-Mode Media Converter with 1× 10/100/1000Mbps Auto-Negotiation RJ45 port supporting Auto-MDI/MDIX,Auto-negotiation of Half-Duplex / Full-Duplex transfer mode, Complies with IEEE 802.3ab and IEEE 802.3z, Extends fiber distance up to 20km. Approved Makes : Cisco, Aruba, TpLink, Sophos |
| 10 | Programming, Policy framing, & Configuration charges- Programming, Configuration and linking charges. |
| 11 | B. Passive components |
| 12 | 9U Rack- Supply of 9U Rack with one shelf, PDU, Fan, Cable manager. Approved Makes : Rittal, APW President, Netrack, MAS Rack |
| 13 | 6U Rack- Supply of 6U Rack with one shelf, PDU, Fan, Cable manager. Approved Makes : Rittal, APW President, Netrack, MAS Rack |
| 14 | Unloaded 24Port Patch panel. - Supply of 1U Straight Patch Panel 24-Port, gray, empty, With a capacity of up to 24 connection modules shielded or unshielded. Exceed TIA /EIA 568.C.2, accepts class E/EA connection module, with optional rear cable manager. Approved Makes : Molex, CommScope, Belden, R&M |
| 15 | Patch Panel IO- Supply of Connection Module, Cat.6, 1 x RJ45, unshielded,RJ45 connection module of Category 6, for the establishing of transmission channels of class E with up to 4 plugged connections, complies with Category 6 requirements of the standards ISO/IEC 11801:2002, EN 50173-1: May 2007,DIN-EN 50173-1: Dec. 2007 as well as ANSI/TIA/EIA 568-B.2-1, de-embedded tested in acc. with IEC 60603-7-4, interoperable and backwards compatible with Cat.5e and Cat.5.Suitable for 10GBase-T applications in acc. with IEEE 802.3an up to 500 MHz and 55 m.. Approved Makes : Molex, CommScope, Belden, R&M |
| 16 | LIU 12Port - Supply 19\" rack mountable12 Port rack mountable complete steel housing fully powder coated LIU required 6 number of SC connectors having FR grade Nylon Cable grommets, ABS Splice Trays with fully cushioned splice holder containing grooves for fixing splice protection sleeves, , Cable Spools made upof flame retardant plastic, high impact resistance, stackable design for providing sufficient room for storage of excess cables, Blanking plates, necessary pigtails etc. 1 Nos Fiber Patch Cord , SC Duplex – SC Duplex, LSZH, metal-free, zero-halogen, flame-retardant, semi-tight buffer, gel-filled, E9/125µm, Singlemode (SM), Length (meter) 3.0, Standards like IEC 61754-4 should be met. Should be included. Approved MakesMolex, CommScope, Belden, R&M |
| 17 | 1KVA Double Conversion Online UPS. - Supply of 1KVA Double Conversion Online UPS with built in Battery and necessary mounting kit. Approved Makes: Socomec, APC, Emerson , Hykon |
| 18 | Copper patch cord 1.0 Meter CAT6 - Supply of Patch Cord Cat.6, U/UTP, 4 Pair, Low Smoke Zero Halogen, Yellow, RJ45/u-RJ45/u 1m Cable should support Standardization Compliant with Cat.6 requirements of ISO/IEC 11801, EN 50173, EN 50168 and EIA/TIA 568.C.x. Approved Makes : Molex, CommScope, Belden, R&M |
| 19 | PVC Back Box - Supply of PVC White back box 86 × 86 × 50 mm on which the wall plate AP is fixed. Approved Makes : Vinay, ABB, Kolors |
| 20 | 305Mtr CAT 6 Box - Supply of Cat.6, U/UTP, 4 Pair, 23 AWG cable, 100 Ohm impedance, Standardization ISO/IEC 11801 ed. 2.2; IEC 61156-5 2nd ed.; EN 50173-1; EN 50288-6-1; TIA 568-C.2, Data transmission frequencies of up to 250 MHz Low Smoke Zero Halogen, Cable Box Length 305 m.. Approved Makes : Molex, CommScope, Belden, R&M |
| 21 | Conduit Laying - Supply of Ivory / white color 25mm Medium ISI branded Pipe and Accessories including, junctions and fasteners. |
| 22 | 1.5 sqmm power cable wire- Supplying of 1.5 sq. mm 3 run FR PVC insulated (ISI Standard) copper conductor, single core cable in the existing surface/recessed steel/ PVC conduit as required. Approved makes: Finolex, Havells, Polycab |
| 23 | OFC Armored cable- Supply of 6 core Armored Single Mode, OS2,Core/ Cladding diameter:9/125 micron, Attenuation: @1310nm <=0.34 db/KM MAX, @1550nm <=0.22 db/KM MAX, Standard:ITU G.652, TIA OS2, IEC B1.3, Armor: Corrugated Steel Tape Armor ,Outer Sheath : HDPE,Cable type: Gel free, multi-tube, and if required, trenching to be done and covering it with a lining of bricks and sand as required. ApprovedOEMs :Molex, CommScope, Belden, R&M |
| 24 | Electrical Switch & Socket - Supply and Installation of 3 module white/off white modular - S&F front plate on the 3-module molded plastic box/ Cable manager and fixing one electrical socket & on/off switch and giving necessary connections as required. Approved Make: - Legrand, ABB |
| 25 | Labour Charges - Conduit laying, cable pulling, cable mapping charges |
AI Tender Summary
Tender Timeline
Feb 07, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedFeb 14, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedFeb 16, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender