| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40mm nominal size). |
| 3 | Random rubble masonry with hard stone in foundation and plinth Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 4 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Hot rolled deformed bars |
| 5 | Brick work with FPS bricks of class designation 75 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 6 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix 1:4 (1 cement : 4 fine/ coarse sand) sqm |
| 7 | Finishing walls with water proofing cement paint of required shade New work (Two or more coats applied @ 3.84 kg/10 sqm ) Qty Same as item no. 6 |
| 8 | Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade Two or more coats on new workQty Same as item no. 6 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20mm nominal size) |
| 10 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. |
| 11 | Construction of embankment with approved material obtained fromborrow pit with all lifts and leads, transporting to site, spreading,grading to required slope and compacting by vibratory roller 8-10tonne to meet requirement of table 300-2 including cost ofcompensation for earth taken from private land complete as perMoRT&H specification clause 305. (Lead taken upto 5 km) |
| 12 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: |