Housing Urban and Rular Development Government Departments Closing in 0 days TDR #30932963

Up Gradation Of Mt On Dalyanoo Pullilani Nainidhar Road Km. 0 / 0 To 22 / 800. ( Portion In Km. 12 / 0 To 22 / 800 ) . Sh Improvement Of Formation Deficiencies, Retaining Structure , C / O Cross-Drainage Works, Road Side Drain, Parapets, Road Furnitu

Issued by Government Departments · sangrah, Himachal Pradesh
Tender Value
9.35 Crore
Estimated cost
Bid Submission
17 Feb 2022
0 days left
EMD
18.70 Lakhs
Bank guarantee accepted
Document Fee
5000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
sangrah → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Up Gradation Of Mt On Dalyanoo Pullilani Nainidhar Road Km. 0 / 0 To 22 / 800. ( Portion In Km. 12 / 0 To 22 / 800 ) . Sh Improvement Of Formation Deficiencies, Retaining Structure , C / O Cross-Drainage Works, Road Side Drain, Parapets, Road Furniture, Paver Block, Essential Edges, , 6.00 Mtr Span Slab Culverts, Box Culverts , W Metal Crash Barrier And Providing Met

BOQ

Name of Work:Upgradation of MT onDalyanoo Pullilani Nainidhar road km. 0/0 to 22/800.(Portion in km. 12/0 to 22/800). (SH:- Improvement of formation defficiencies, Retaining structure ,C/O Cross-drainage works, Road side drain, parapets, Road furniture,Paver Block,Essential edges, ,6.00 mtr span slab culverts, Box Culverts , \"W\" Metalcrash barrier & Providing Metalling Tarring including 5 year annual maintenance in km.12/0 to 22/800)
Sl. No. Item Description
1Excavation in earth work inin hilly area all height and depths and in all kinds of soils by mannul/mechanical means including saturated soil comprising oforidinary soil, soft rock, hard rock chieselling, wedding out of rock( whereblasting is prohibited).and their intermediate classification of soil setting out true to the required lines, grades, width camber and super elevation levels cutting and triming of side slopes and level as shown in the drawing and as direction by Engineer-in-Charge at site according to the MORD technical specification clause 302,1603 and 1603.2 and sorting out useful meaterials and stacking the same in all leads and lifts in acquired width of road and transportation of unuseful material for filling in road ways camber,embankment for grade improvements and disposal of all materials to required width of the road or on approved dumping site through all modes of transportation including heald load or animal transport or mechnaical means alongwith its levelling fine dressing and carriage of machineries, materials, tools, equipment and safety measures and incidentals necessary to complete the work by mechanical means and labour, it required all useful materials such as stones, shingle aggregate and slates ect shall be sort out stacked and measured.The recovery at the rate of RS. 170/- ( Rupees One hundred seventy) per cubic metre shall be effected from the bills for the qyantity actually measured or 105.81 cubic metre on pro-rata basis which ever is more..Any lossto the public and private property during the course of excavation shall be the absolute responsibility of the contractor,which shall have to be duly compensated by him at his own cost in all cases.
2Excatation in soil in hilly area in all depths using manual means as per drawing and technical specification ministry of Rural Development for rural roads August 2004 (Two thousands four) clause 305.1 (three hundred five point one) including setting out, coustruction of shoring and bracing, removal of stumps and other deleterious materials including dressing of sides and bottom and back filling in trenches with excavated suitable materials and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials by all modes of transportations in all leads and lifts at specified places in specified manner, systematically with level consideration to avoiding a diverse effects on environment, trimming filling of uneverness blind age and finishing of the road to specified dimension or as directed by the Engineer-in-charge. any loss to the public or private property during the course of excavation shall be the whole responsibility of the contractor which shall have to be duly compensated by him at his on cost in all cases including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge.
3Earth work in excavation for all type of road structure such as all types of bidges work in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock, chiseling/wedding out rocks ( where blasting is prohibited) as pr drawing and MORD technical specification clause 305.1,1603.4 and as per direction of the Engineer-in-Charge including setting out, construction of shorting and bracing, removal of stumps and other deleterious materials and disposal of materials up to any lead and up to any lift including dressing of sides and bottom and back filling in trenches with excavated suitable approved materials including shorting and strutting and pumping and bailing out water (surface and sub-soil water) up to any depth any quantum to water including cleaning of slush which may arise out during dewatering as per direction of Engineer-in-Charge including carriage of materials within all leads and lifts and other incidental .
4Providing and laying plain concrete M-15(M-Fifteen) 1: 2.5 :5(One cement isto two and half sand isto five graded crushed hard stone aggregatenominal mix) mechanically mixed and vibrated in open foundations and plinths parapets or similar works as per drawing and technical specification of Ministry of rural Development for rural roads August 2004 (Two thousand four) clause 802,803,1202 and 1203 (Eight hundred two , Eight hundred three, One thousand two hundred two and one thousand two hundred three) and curing complete,including the cost of form work and haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government. (For C.D works)
5Providing and laying plain concrete M-15(M-Fifteen) 1: 2.5 :5(One cement isto two and half sand isto five graded crushed hard stone aggregatenominal mix) mechanically mixed and vibrated in open foundations and plinths parapets or similar works as per drawing and technical specification of Ministry of rural Development for rural roads August 2004 (Two thousand four) clause 802,803,1202 and 1203 (Eight hundred two , Eight hundred three, One thousand two hundred two and one thousand two hundred three) and curing complete,including the cost of form work and haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government.( For 6.00 mtr span slab culvert).
6Providing and laying plain concrete M-15(M-Fifteen) 1: 2.5 :5(One cement isto two and half sand isto five graded crushed hard stone aggregatenominal mix) mechanically mixed and vibrated in open foundations and plinths parapets or similar works as per drawing and technical specification of Ministry of rural Development for rural roads August 2004 (Two thousand four) clause 802,803,1202 and 1203 (Eight hundred two , Eight hundred three, One thousand two hundred two and one thousand two hundred three) and curing complete,including the cost of form work and haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government. (For Steel crash barrier)
7Providing and laying plain concrete M-25(M-Twenty five) 1: 1.5 :3(One cement isto one and half sand isto three graded crushed hard stone aggregate design nominal mix) mechanically mixed and vibrated in wearing coat or similar works as per drawing and technical specification of Ministry of rural Development for rural roads August 2004 (Two thousand four) clause 802,803,1202 and 1203 (Eight hundred two , Eight hundred three, One thousand two hundred two and one thousand two hundred three) and curing complete including the cost of form work and hauling carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfactionasper direction of Engineer- in-Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government. (For 6.00 mtr span slab culvert.)
8Providing and laying plain concrete M-25(M-Twenty five) 1: 1.5 :3(One cement isto one and half sand isto three graded crushed hard stone aggregate design nominal mix) mechinacally mixed and viberated in wearing coat or similar works as per drawing and technical specification of Ministery of rural Development for rural roads August 2004 (Two thousand four) clause 802,803,1202 and 1203 (Eight hundred two , Eight hundred three, One thousand two hundred two and one thousand two hundred three) and curring complet including the cost of form work and hauling carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfactionasper direction of Engineer- in-Charge.The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government. (For Box culvert.)
9Providing and laying concrete for plain/reinforced concrete 1:4:8 (One cement is to four sand is to eight graded hard crushed stone aggregate 40mm nominal size) mechanically mixed and vibrated in OPEN foundationor similar works complete works complete as per drawings and technical specification of ministry of rural Development for rural road August 2004(Two thousand four) clause 802-803, 1202 and 1203 (eight hundred two, Eight hundred three , One thousand two hundred two and one thousand two hundred three) and curing complete includingcost of form work and hauling/ carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer- in-Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government. (For CD works)
10Providing and laying concrete for plain/reinforced concrete 1:4:8 (One cement is to four sand is to eight graded hard crushed stone aggregate 25mm nominal size) mechanically mixed and vibrated in Sub-structure or similar works complete works complete as per drawings and technical specification of ministry of rural Development for rural road August 2004(Two thousand four) clause 802-803, 1202 and 1203 (eight hundred two, Eight hundred three , One thousand two hundred two and one thousand two hundred three) and curing complete includingcost of form work and hauling/ carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer- in-Charge The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government. (For Retaining structure )
11Providing and laying concrete for plain/reinforced concrete 1:4:8 (One cement is to four sand is to eight graded hard crushed stone aggregate 25mm nominal size) mechanically mixed and vibrated in Sub-structure or similar works complete works complete as per drawings and technical specification of ministry of rural Development for rural road August 2004(Two thousand four) clause 802-803, 1202 and 1203 (eight hundred two, Eight hundred three , One thousand two hundred two and one thousand two hundred three) and curing complete includingcost of form work and hauling/ carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer- in-Charge .The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government.(For C.D works.)
12Providing and laying concrete for plain/reinforced concrete 1:4:8 (One cement is to four sand is to eight graded hard crushed stone aggregate 25mm nominal size) mechanically mixed and vibrated in Sub-structure or similar works complete works complete as per drawings and technical specification of ministry of rural Development for rural road August 2004(Two thousand four) clause 802-803, 1202 and 1203 (eight hundred two, Eight hundred three , One thousand two hundred two and one thousand two hundred three) and curing complete includingcost of form work and hauling/ carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer- in-Charge .The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government. (For Parapet.)
13Providing and laying plain cement concrete M-10(M-Ten) 1:3:6 (One cement is to three sand is to six graded hard crushed stone aggregate nominal mix)40mm ( Forty milimetre by mechanically mixed and vibrated in foundation or similar works complete works complete as per drawings and technical specification of ministry of rural Development for rural road August 2004(Two thousand four) clause 802-803, 1202 and 1203 (eight hundred two, Eight hundred three , One thousand two hundred two and one thousand two hundred three) and curing complete includingcost of form work and hauling/ carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer- in-Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government. (For 6.00 mtr span slab culvert)
14Providing and laying plain cement concrete M-10(M-Ten) 1:3:6 (One cement is to three sand is to six graded hard crushed stone aggregate nominal mix)40mm ( Forty milimetre by mechanically mixed and vibrated in foundation or similar works complete works complete as per drawings and technical specification of ministry of rural Development for rural road August 2004(Two thousand four) clause 802-803, 1202 and 1203 (eight hundred two, Eight hundred three , One thousand two hundred two and one thousand two hundred three) and curing complete includingcost of form work and hauling/ carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer- in-Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government.(For Box culvert)
15Providing and laying plain cement concrete M-10(M-Ten) 1:3:6 (One cement is to three sand is to six graded hard crushed stone aggregate nominal mix) 20mm (Twenty milimetre by mechanically mixed and vibrated in foundation or similar works complete works complete as per drawings and technical specification of ministry of rural Development for rural road August 2004(Two thousand four) clause 802-803, 1202 and 1203 (eight hundred two, Eight hundred three , One thousand two hundred two and one thousand two hundred three) and curing complete includingcost of form work and hauling/ carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer- in-Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government. (For drain).
16Providing and laying plain cement concrete M-10(M-Ten) 1:3:6 (One cement is to three sand is to six graded hard crushed stone aggregate nominal mix) 20mm (Twenty milimetre by mechanically mixed and vibrated in foundation or similar works complete works complete as per drawings and technical specification of ministry of rural Development for rural road August 2004(Two thousand four) clause 802-803, 1202 and 1203 (eight hundred two, Eight hundred three , One thousand two hundred two and one thousand two hundred three) and curing complete includingcost of form work and hauling/ carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer- in-Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government.(For paver Block).
17Providing and laying reinforced cement concrete pipe NP2 for, culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 (one cement isto two sand)but excluding excavation protection works back filling concrete and masonry works in head walls and parapets clause 1108.RCC pipe NP2 900mm (nine hundred milimetre) dia as per design including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government.
18Stone filling behind abutment,wing wall and return wall complete as per drawing and technical specification clause1204.3.8 ,Granular materialas per design including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government.
19Construction of dry rabble masonry for retaining walls, breast walls, revetment walls and parapets etc. for sub structure and super structure complete as per drawing and technical specification clauses 704.6 and 1302.5 (Seven hundred four point six and One thousand three hundred two point five)including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government.
20Providing and laying filter media with granular materials crushed aggregates as per specification will be packed to a thickness of not less than 600 mm( Six hundred milimetre) with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment wing wall return walls to the full height complete to firm condition complete as per drawing and technical specification of Ministry of rural Development for rural roads August 2004 (Two thousand four) clause 1204.3.8(One thousandtwo hundred four point three point eight) and curing complete including the cost of form work and haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government .
21Providing weep holes in brick masonry/stone masonry plain cement concrete , wing wall, retune wall with 100 mm ( One hundred milimetre) dia A.C. (Air compressor) pipe extended through the full width of the structure with slop of one in vertical and Twenty in horizontal towards drawing face complete as per drawing and technical specification of Ministry of rural Development for rural roads August 2004 (Two thousand four) clause614,709,1204.3.7 (Six hundred fourteen, Seven hundred nine, One thousand two hundred four pointthree point seven ) and curing complete including the cost of form workand haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge.The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government.
22Providing and laying flooring in laid over cement concrete bedding complete in cement mortar 1:3 (One cement is to three sand) complete as per drawing & technical specification clause 1303 (One thousand three hundred three) and curing complete including the cost of form work and hauling carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction asper direction of Engineer- in-Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government
23Providing and laying of boulder apron laid in wire crates with 4mm dia ( Four milimetre) diaG.I.wire conforming to I.S. 280 ( Two hundred eighty) and I.S. 4826 ( four thousand eight hundred twenty six) in 100 mm x 100mm mesh (One hundred into one hundred milimetre)(woven diagonally] including 10 (Ten) percent extra for laps and joints laid with stone boulders weighing not less than 25kg (Twenty five kilogramme) each as per drawing and technical speciation clause 1301 (One thousand three hundred one) including all leads, lifts and carriage of materials complete as per entire satisfaction of the Engineer in charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government.
24Supplying and fitting and placing and position HYSD(High yield strength Deformed) bars reinforcement, including cost of binding wire in superstructure complete as per drawing and technical specification of Ministry of rural Development for rural roads August 2004 (Two thousand four) clause 1002,1010 and 1202 (One thousandtwo , One thousand ten , One thousand two hundred two ) and curring complete including the cost of form work and hauling carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction asper direction of Engineer- in-Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government
25Providing and laying reinforced Cement concrete wearing course M-30 ( M-Thirty) grade excluding reinforcement completed or similar works as per drawing and technical specification of Ministry of rural Development for rural roads August 2004 (Two thousand four) clause 800 and 1206.3 (One thousand two hundred six point three) and curing complete including the cost of form work and hauling carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfactionasper direction of Engineer- in-Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government
26Providing and Laying of Interlocking Concrete Block NTC Pavements having thickness 80 mm (M-40)as per drawing and Technical Specification Clause 1504 and hauling carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfactionasper direction of Engineer- in-Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government
27Drainage spouts complete as per drawing and technical specifications and hauling/ carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer- in-Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government
28Reinforced Cement Concrete M 25 (Twenty Five) grade approach slab including reinforcementand formwork complete as per drawing and technical specifications Clauses 800 and 1211. and hauling/ carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer- in-Charge.The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government
29Construction of precast RCC Railing of M-30(Thirty) grade, aggregate size not exceeding 12mm (Twelve milimetre) true to line and grade, tolerance of vertical posts not to exceed 1 (One )in 500 (five hundred) centre to centre spacing between vertical posts not to exceed 2000mm (Two thousand milimetre) leveling adequate space between vertical post for expansion complete as per approved drawing and technical specificationincludingcost of form work and hauling/ carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer- in-Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government
30Providing and erecting a \"W\" metal beam crash barrier comprising of 3mm thick corrugated sheet metal beam rail 70CM above road / ground level fixed on ISMC series channel vertical post 150X75X5 mm , spaced 2.0m centre to centre, 1.80m high, 1.1m below ground/road level , all steel parts and filaments to be galvanized by hot dip process, a fitting to confirm to I.S 1367 and IS 1364, metal beam rail to be fixed on the vertical post with a space of channel section 150X75X5 mm, 300mmlong complete as per clause 810.The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government
31Construction of sub grade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 , as per Technical Specification Clause 303.1including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government
32Construction of granular Sub base by Providing well graded materials, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with renovator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per technical Specification clause 401 as per Technical specification clause 405( four hundred five) by all means including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge.The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government
33Providing , laying, spreading and compacting stone aggregates of specific size to water bound macadam specification including spreading in uniform thickness, hand packing , rolling with three wheel 80-100kn ( eighty-One hundred kn) static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill- up the interstices of coarse aggregate ,watering and compacting to the required density Grading -ll (Three) , 53mm to 22.4mm ( fifty three milimetre to twenty two point four milimetre) (as per Technical specification clause 405( four hundred five) by all means including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge.The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government
34Providing , laying, spreading and compacting stone aggregates of specific size to water bound macadam specification including spreading in uniform thickness, hand packing , rolling with three wheel 80-100kn ( eighty-One hundred kn) static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill- up the interstices of coarse aggregate ,watering and compacting to the required density Grading -lll (Three) , 53mm to 22.4mm ( fifty three milimetre to twenty two point four milimetre) (as per Technical specification clause 405( four hundred five) by all means including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge.The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government
35Providing and applying primer coat with bitumen emulsion (SS-I) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical specification clause 502 including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge.The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government
36Providing and applying tack coat with Bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.25 to 0.30 kg/sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification clause 503.including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government
37Providing and laying 30mm thick bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6percentof mix and filler, i.e 129.50 kg per cumas per job mix formula along with addtion of anti striping agents i.e. Zycotherm @0.11% of bitumen transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge.The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government.
38Providing and laying hot applied thermoplastics compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm area thickness of 2.5mm is exclusive of surface appliedglass beads as per IRC 35 the finished surface to be leveled uniform and free from streaks and holes complete in all respects. including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge.The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government
39Reinforced cement concrete M15 grade kilo metre stone/local stone of standard designs per IRC-8 fixing in position including painting and printing etc. as per drawing and technical specification clause 1703.The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government
405th Km stone
41Ordinary Km stone
42200m stone
43Providing and fixing of typical NABARD informatory sign board with logo as per MORD specifications and drawing. Three MS plates of 1.6mm thick top and middle plate duly welded with MS flat iron 25X5mm size on edges, the lower plate will be welded with MSangle iron frame of the lower most plate will be welded with MS angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos 75X75mm of12 SRG sheet tubes posts duly embedded in cement concrete M15 grade blocks of 450X450X600mm below ground level. The top most diamond plate will be welded to middle plate by 47X47mm of 12SWG steel plate tube. All MS will be stove enameled on bothsides.Lettering and printing arrows border etc.wkill be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxty paint as per drawing clause 1701 and Annexure 17001.The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government
44Providing and fixing retroreflectioned cautionary mandatory and information sign boardas per IRC-67 made of encapsulated lenses type reflective sheetingvide clause 1701.2,3fixed over aluminum sheeting 1.5mm thick supported on a mild steel angle iron post 75mmx75mmx6mm firmly fixed to the ground by ean of properly design foundation with M-15 grade cement concrete 450mmx450mmx600mm, 600mm below ground level as per drawing and specification clause 801 complete. including haulaging/carriage of all about equipments and materials to various locations through all modes of transportation in all leads, lifts to the entire satisfaction and direction of the Engineer-in-charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government
45Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25 fixed in position including finishing and lettering but excluding painting as per drawing and technical specification clause 1704.including haulaging/carriage of all about equipments and materials to various locations through all modes of transportation in all leads, lifts to the entire satisfaction and direction of the Engineer-in-charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government
46Providing and erecting direction and place identifications of semi reflective sign boards as perIRC:67 made of 2mm thick MS sheet duly stove enameled paint in white colour in front and greycolour on back with red reflective border of 70mm width and required message letters, figures with reflective engineering grade tape as per MORD specifications of required shade and coloursupported and welded on 47X47mm of 12 SWG square tube of 3050mm height duly strengthened by 25X5mm M/S flat iron on edge on back firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450X450X600mm below ground level las per approved; drawing and technical specification clause 1701.including haulaging/carriage of all abour equipments and materials to various locations through all modes of transportation in all leads, lifts to the entire satisfaction and direction of the Engineer-in-charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government (Sizemore than 0.90 sqm).
47Providing and fixing of retro reflectorised cautionary mandatory and informatory sign as perIRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3,fixed overaluminum sheeting 2mm thick supported ona mild steel angle iron post 75mmx 75mmx6mm (2 Nos) firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 650X650X600mm,600mm below ground level as per approved drawing and technical specification clause 1701.Including haulaging/carriage of all about equipments and materials to various locations through all modes of transportation in all leads, lifts to the entire satisfaction and direction of the Engineer-in-charge. The rate including octroi, royality,malkhana, toll tax, GST or other taxes imposed by the Government(Sizemore than 0.90 sqm).
48Routine Maintenance after completion of construction workincludinghaulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - ChargeFor Ist year
49Routine Maintenance after completion of construction workincludinghaulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge For 2nd year
50Routine Maintenance after completion of construction workincludinghaulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge For 3rd year
51Routine Maintenance after completion of construction workincludinghaulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge For 4th year
52Routine Maintenance after completion of construction workincludinghaulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - ChargeFor 5th year

AI Tender Summary

OUR REF NO 30932963
AUTHORITY Government Departments
TENDER VALUE 9.35 Crore
LAST DATE 17-02-2022
Authority
Authority Name Public Works Department
Work Description Up Gradation Of Mt On Dalyanoo Pullilani Nainidhar Road Km. 0 / 0 To 22 / 800. ( Portion In Km. 12 / 0 To 22 / 800 ) . Sh Improvement Of Formation Deficiencies, Retaining Structure , C / O Cross-Drainage Works, Road Side Drain, Parapets, Road Furniture, Paver Block, Essential Edges, , 6.00 Mtr Span Slab Culverts, Box Culverts , W Metal Crash Barrier And Providing Met
Basic Detail
Tender No Sangrah 10817-67 dated 27.01.2022
Bidding Type Tender
Location
City sangrah
State Himachal Pradesh
Key Dates
Publish Date 02 Feb 2022
Submission Date 17 Feb 2022
Open Date 18 Feb 2022
Finance
Tender Value 9.35 Crore
Tender Fee 5000
EMD 18.70 Lakhs
Exemption Not Available
Document List
686398fa-760b-4da7-abab-0d56ed2dcac7.html
BOQ_84618.xls
SBD.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Feb 02, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Feb 17, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Feb 18, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

686398fa-760b-4da7-abab-0d56ed2dcac7.html

xls

BOQ_84618.xls

pdf

SBD.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders