|
| 1 | Table A (Survey, Planning, Supply, Installation, end to end intergation, testing and commissioning)*Supply (Material) (As per technical specifications given in Annexure-A, B & CServices (As per technical specifications given in Annexure-A TEC GR No.) and Engineering Instructions |
| 2 | Passive infrastructure24F Metal free optical fibre cable with double HDPE sheath (G.652D Fibre) loose tube type |
| 3 | Passive infrastructurePLB HDPE Telecom Duct (40/33mm) along with required accessories |
| 4 | Passive infrastructureSplitters 1:2 |
| 5 | Passive infrastructureSplitters 1:4 |
| 6 | Passive infrastructureFDMS Type 3B at GP location as per GR/FDM-01/02 APR 2007 with latest amendments. |
| 7 | Passive infrastructureBranch Joint Closure |
| 8 | Passive infrastructurePatch Cord 5 mtr length SC-APC |
| 9 | Active infrastructureSupply of ONT |
| 10 | Power infrastructureSupply of Solar Photovoltaic Power Supply including Solar Power Panel, VRLA batteries, Charge Controller Unit (along with the suitable stand) and installation material |
| 11 | (Services (As per technical specifications given in Annexure-A TEC GR No.) and Engineering Instruction Passive infrastructure:Excavation of trench for PLB pipe laying, PLB pipe/pipes laying, Backfilling, Reinstatement and Compaction after laying of PLB pipe/pipes, laying / blowing of optical Fibre Cable inside laid PLB pipe/pipes, splicing and jointing of Optical Fibre Cables including supply of As Built Diagram (ABD) of constructed OFC Route,GIS mapping and Acceptance Testing, commissioning and makeover of the routes. The work also includes road / bridge crossing, laying of PLB inside DWC pipe, wherever required and obtaining Right-of-Way (RoW) permissions. Commissioning of 24/48/96 core/ribbon optical fibre connectivity from the Block PoP to GP room and termination at GP ONT. The cost shall include fixing of joint chamber, manhole, splice closure, Fixing, painting and sign writing of Route /Joint Indicators, termination at FTB and all the relevant accessories etc. and end to end testing of dark and lit fibre per GP (For Underground laying) (As per the Engineering Instruction issued by BBNL) |
| 12 | Services (As per technical specifications given in Annexure-A TEC GR No.) and Engineering Instruction Active infrastructureInstallation and commissioning of ONT (Including enclosure) |
| 13 | Services (As per technical specifications given in Annexure-A TEC GR No.) and Engineering Instruction Active infrastructureIntegration of ONT (Including enclosure) |
| 14 | Services (As per technical specifications given in Annexure-A TEC GR No.) and Engineering Instruction Active infrastructureIntegration with BBNL NOC (as per clause 26 of Annexure-B of section-VI) |
| 15 | Solar Panel (Power) (As per technical specifications given in Annexure-A TEC GR No.) Material and ServicesInstallation, integration and commissioning of Solar Photovoltaic Power Supply including Solar Power Panel, VRLA batteries, Charge Controller Unit (along with the suitable stand) and installation material |