Power Boards / Undertakings / PSU Closing in 0 days TDR #30909483

Running Contract For Extension And Dismantling Of Electrical Network In Pollachi Division, Central Pollachi Sub Division Running Contract For Extension And Dismantling Of Electrical Network In Pollachi Division, Central Pollachi Sub Division

Issued by Boards / Undertakings / PSU · udumalpet, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
16 Feb 2022
0 days left
EMD
10000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
udumalpet → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Running Contract For Extension And Dismantling Of Electrical Network In Pollachi Division, Central Pollachi Sub Division Running Contract For Extension And Dismantling Of Electrical Network In Pollachi Division, Central Pollachi Sub Division

BOQ

Name of Work: Running contract for Extension and Dismantling of Electrical Network for Central Pollachisubdivision
Sl. No. Item Description
1Transporting
2Transporting of RCC / RSJ / PSC / fabricated pole fromroad side to pole pit head
3Transporting of Distribution Transformer/Metering set by using private vehicle other than bullock cart with load of one M.T minimum/vice versa Up to 30 Km
4Transporting of Distribution Transformer/Metering set by using private vehicle other than bullock cart with load of one M.T minimum/vice versa Above 30 Km
5Transporting of Line Materials from Sub-stores to section pocket or near the work spot at Road side using private vehicle other than bullock cart with load of one M.T minimum/vice versaUp to 8 Km
6Transporting of Line Materials from Sub-stores to section pocket or near the work spot at Road side using private vehicle other than bullock cart with load of one M.T minimum/vice versa Above 8 Km
7Loading of PSC / RCC pole upto 8.0 m
8Loading of metal poles of all sizes
9Loading of PSC / RCC poles 9 m & above
10Unloading of PSC / RCC pole upto 8.0 m
11Unloading of metal poles of all sizes
12Unloading of PSC / RCC poles 9 m & above
13Loading of cement bag of 50 Kgs
14Unloading of cement bag of 50 Kgs
15Loading of DistributionTransformer up to 100 KVA
16Loading of DistributionTransformer above 100 KVA and below 500 KVA
17Loading of DistributionTransformer 500 KVA
18Loading of Metering set
19Unoading of DistributionTransformer up to 100 KVA
20Unloading of DistributionTransformer above 100 KVA and below 500 KVA
21Unloading of DistributionTransformer 500 KVA
22Unloading of Metering set
23Excavation & back filling of pole pit for poles below 9 m (30\") per location by men / machine
24Excavation & back filling of pole pit for poles 9 m (30\") and above per location by men / machine
25Excavation & back filling of pole pit per location Hard rock requires blasting
26Excavation & back filling of pole pit per location Hard rock without blasting
27Excavation & back filling of pole pit per location Medium rock and dense medium rock requires blasting
28Excavation & back filling of stay pit for poles below 9 m (30\") per location by men / machine
29Excavation & back filling of stay pit for poles 9 m (30\") and above per location by men / machine
30Excavation & back filling of stay pit per locationHard rock requires blasting
31Excavation & back filling of stay pit per locationHard rock without blasting
32EExcavation & back filling of stay pit per location Medium rock and dense medium rock requires blasting
33Erection of poles by men / machine RCC / PSC / metal poles upto 8.0 m (27\")
34Erection of poles by men / machine RCC / PSC /metal poles 9 m (30\")
35Erection of poles by men / machine RSJ, PSC, Rail, Fabricated poles above 9 m (30\")
36Erection of poles by men / machine RCC / PSC /metal poles 9 m (30\")
37Erection of poles by men / machine RSJ, PSC, Rail, Fabricated poles above 9 m (30\")
38Concreting of pole including cost of cement, sand & jally with a mixture of 1:3:6, including all materials per pole Mass concreting
39Concreting of pole including cost of cement, sand & jally with a mixture of 1:3:6, including all materials per pole Sleeve concreting
40Earthing of pole with wire including burying loop and binding
41Earthing of pole with earthing coil including burying loop and binding
42Erection of stay set complete
43Fixing of 5\" V-X Arm
44Fixing of 1372 mm (4\"6\") V-X-Arm
45Fixing of 1068 mm (3\"6\") V-X-Arm
46Fixing ofL.T. 3 Phase X-Arm
47Fixing ofL.T. Single Phase X-Arm
48Fixing of H.T/L.T. T.I. Fitting
49Fixing ofDouble channel X-Arm
50Fixing of Guarding Cross Arm
51Fixing of Tapping Channel Cross Arm
52Fixing of 11 KV Pin Insulator (Porcelain / Polymer)
53Fixing of 11 KV Disc
54Fixing of 22 KV PinInsulator (Porcelain / Polymer)
55Fixing of 22 KV Disc
56Fixing of 33 KV Pin Insulators
57Fixing of33 KV Strain Disc
58Fixing of L.T.Pin Insulators
59Fixing of L.T.SHACKLE
60Fixing ofknob
61Fixing of HT LAS (3 nos)
62Fixing of LT LAS (3 nos)
63Paving of conductor, stringing binding jumpering complete with ACSR / AAAC for HT/LT line per KM7/2.50 or 7/2.59 (Weasel)
64Paving of conductor, stringing binding jumpering complete with ACSR / AAAC for HT/LT line per KM 7/3.15 or 7/3.35 (Rabbit)
65Paving of conductor, stringing binding jumpering complete with ACSR / AAAC for HT/LT line per KM7/4.09 (Raccoon)
66Paving of conductor, stringing binding jumpering complete with ACSR / AAAC for HT/LT line per KM 6/4.72 + 7/1.57 (Dog)
67Guarding arrangements per span Splitneutral guarding
68Guarding arrangements per span Flat guarding with 4 wire 11 KV & 22 KV
69Guarding arrangements per span P&T and Railway cradle guarding
70a. Double pole transformer structure erection complete including transportation (from road side to structure location), excavation, mass concreting, assembling of structure materials, AB switch, HG fuse set, HT LAS, LT LAS, stay set, support insulators & pin insulators, complete earthing, feeding arrangements, HT jumpering complete, provision of LT bus arrangements, complete wiring and painting except erection of transformer (Split up details attached)
71b. Double pole transformer structure erection complete as per item 28.a with DT metering (Whole Current Meter) arrangements
72c. Double pole transformer structure erection complete as per item 28.a with DT metering (Whole Current Meter) arrangements and fixing of MODEM
73a. Single pole transformer structure erection complete including transportation (from road side to structure location), excavation, mass concreting, assembling of structure materials, AB switch, HG fuse set, HT LAS, LT LAS, stay set, support insulators & pin insulators, complete earthing, feeding arrangements, HT jumpering complete, provision of LT bus arrangements, complete wiring and painting except erection of transformer (Split up details attached)
74b. Single pole transformer structure erection complete as per item 29.a with DT metering (Whole Current Meter) arrangements
75c. Single pole transformer structure erection complete as per item 29.a with DT metering (Whole Current Meter) arrangements and fixing of MODEM
76Erection of transformer in new structure Below 200 KVA
77Erection of transformer in new structure 200 KVA & above but below 500 KVA
78Erection of transformer in new structure 500 KVA
79i) DT Metering arrangements (for the works not covered by HQ schemes) - Whole Current Meter (including fixing of DT Meter Box)
80ii) DT Metering arrangements (for the works not covered by HQ schemes) - LTCT Meter (including fixing of DT Meter Box)
81Erection of AB Switch
82Erection of HG Fuse set complete
83Structure earthing complete (3 Nos. earth pits and 3 Nos. earth pipes complete)
84Feeding arrangementswith open type fuse unit
85HT & LT LAS fixing and jumpering complete
86Fixing of support insulator angle and erection of 3 Nos. Pin insulators
87Erection of HT LAS
88Erection of LT LAS
89H.T Jumpering complete
90Erection ofdouble pole structure including fixing of top channel, x- bracings, earthing, providing stays, etc., complete
91Erection of four pole structure including fixing of top channels, x-bracing, earthing, providing stays, etc., complete
92Manufacturing of special type clamps for rail poles, RS joists, tubular pole, distribution transformer strucutre with material
93Drilling of hole in channelangles etc., 3/4 & 1\" per hole
94a. Cutting of Flat per cutting
95b. Cutting of channel per cutting
96c. Cutting of Angle-per cutting
97d. Cutting of pipe-per cutting
98Alteration of back clamp to suit works Back clamp
99Alteration of back clamp to suit works Stay clamp
100a. Fixing of new street light fittings
101b. Fixing of new Sodium/Mercury lamp fittings
102c. Street light switch box erection complete with pipe provision
103a. Erection of metering set 11 KV / 22 KV / 33 KV
104b. Dismantling of metering set 11 KV / 22 KV / 33 KV
105T.I. Fitting welding withclamps
106a. Cutting of R.S. Joist pole
107b. Welding in R.S. Joist pole
108a. New service connection wires dismantling and re-errection for Single Phase Service
109b. New service connection wires dismantling and re-errection for Three Phase Service
110Releasing of Single Phase Meter and refixing (for works not covered under HQ schemes)
111Releasing of Three Phase Meter and refixing (for works not covered under HQ schemes)
112Destruction of pole concreting at site
113Retrievinggrill from Deteriorated RCC pole
114a. Painting (2 coats) of Distribution Transformer below 100 KVA
115b. Painting (2 coats) of Distribution Transformer 100 KVA & above upto 250 KVA
116c. Painting (2 coats) of Distribution Transformer above 250 KVA
117Painting of RSJ, Tubular pole including cross arms T.I fittings single coating
118Painting of Red Oxide RSJ 36\"
119Painting of Red Oxide RSJ 42\"
120Painting of AluminiumRSJ 36\"
121Painting of AluminiumRSJ 42\"
122Pole at ground
123Numbering of pole with black back ground and yellow letters including cost of paint per pole
124Painting of transformer structure poles with two coats for each structure
125Painting of service connection details in Meter Board / Agricultural services / Hut service door including cost of Paint and Brush
126Replacement of Earthpipe per loc
127Re-Earthing of structure completely
128a. Cleaning of DT Yard
129b. Cleaning of RMU
130c. Cleaning of Ring Fencing
131Setting right the leaning pole in HT/LT at pin point location
132Setting right the leaning pole in HT/LT at cutpoint location
133Resagging of lines for all sizes at cutpoint location per wire/span 7/2.50 or 7/2.59 (Weasel)
134Resagging of lines for all sizes at cutpoint location per wire/span 7/3.15 or 7/3.35 (Rabbit)
135Resagging of lines for all sizes at cutpoint location per wire/span 7/4.09 (Raccoon)
136Resagging of lines for all sizes at cutpoint location per wire/span 6/4.72 + 7/1.57 (Dog)
137Clearing ofbranches of trees Coconut
138Clearing ofbranches of trees Others
139Providing LT SpacersSingle Phase
140Providing LT SpacersThree Phase
141Erection of LT Shunt Capacitor including transport
142Ground patrolling of HT lines during Breakdown
143Rectification ofsnapped HT lineduring Breakdown Weasel ACSR 7/2.59 or AAAC 7/2.50 Sq mm
144Rectification ofsnapped HT lineduring BreakdownRabbit ACSR 7/3.35 or AAAC 7/3.15 Sq mm
145Rectification ofsnapped HT lineduring BreakdownRaccoon ACSR 7/4.09 Sq. mm
146Rectification ofsnapped HT lineduring BreakdownDog ACSR 6/4.72 & 7/1.57 Sq mm
147Rectification ofsnapped HT lineduring Breakdown Dog ACSR 6/4.72 & 7/1.57 Sq mm
148Rectification of snapped LT line during Breakdown
149Replacement of flashed over HT pin insulator, LAS, strain disc including jumpering, binding and transporting of required materials
150Cleaning of 110 KV Breakers including CTs and allied maintenance work
151Cleaning of 110 KV LAS
152Cleaning of all types of 110 KV AB switch and applying petroleum jelly including tightness checking
153Cleaning of 110 KV Power transformer insulators and assisiting for all other maintenance works
154Cleaning of 33 KV / 22 KV / 11 KV Breakers and CTS and allied maintenance works
155Cleaning and checking of 110 KV Bus insulators
156Cleaning and checking of Capacitor bank and other accessories
157Cleaning and checking of 33 KV / 22 KV / 11 KV AB switchesincluding tightening of bolt and nut and applying Petroleum jelly
158Releasing and refixing of clamp in 110 KV / 33 KV 22 KV / 11 KV buses
159Silica Gel Replacement
160Clamps Tightness
161Busbar Maintenance
162HG Fuse Maintenance
163AB Switch Maintenance
164LT Open Type Maintenance
165Inspection of Earthing & Tightness
166Cleaning & Checking of DT Metering Box
167Cleaning of DT
168Oil Top Up
169Laying & erection of OH cable
170Dismandling of stay set complete
171Dismandling of 5\" V-X Arm
172Dismandling of 1372 mm (4\"6\") V-X-Arm
173Dismandling of 1068 mm (3\"6\") V-X-Arm
174Dismandling of. L.T. 3 Phase X-Arm
175Dismandling of L.T. Single Phase X-Arm
176Dismandling of H.T/L.T. T.I. Fitting
177Dismandling ofDouble channel X-Arm
178Dismandling of Guarding Cross Arm
179Dismandling of Tapping Channel Cross Arm
180Dismandling of 11 KV Pin Insulator (Porcelain / Polymer)
181Dismandling of 11 KV Disc
182Dismandling of22 KV PinInsulator (Porcelain / Polymer)
183Dismandling of 22 KV Disc
184Dismandling of 33 KV PinInsulator
185Dismandling of 33 KV Disc
186Dismandling of LT Pin Insulator
187Dismandling of LT Shackle
188Dismandling of Knob
189Dismandling of HT LAS (3 nos)
190Dismandling of LT LAS (3 nos)
191Dismandling of conductor, stringing binding jumpering complete with 7/2.50 or 7/2.59 (Weasel) line per KM
192Dismandling of conductor, stringing binding jumpering complete with 7/3.15 or 7/3.35 (Rabbit) line per KM
193Dismandling of conductor, stringing binding jumpering complete with 7/4.09 (Raccoon) line per KM
194Dismandling of conductor, stringing binding jumpering complete with6/4.72 + 7/1.57 (Dog) line per KM
195Healthiness checking of meter

AI Tender Summary

OUR REF NO 30909483
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 16-02-2022
Authority
Authority Name Tamil Nadu Generation And Distribution Corporation Limited
Work Description Running Contract For Extension And Dismantling Of Electrical Network In Pollachi Division, Central Pollachi Sub Division Running Contract For Extension And Dismantling Of Electrical Network In Pollachi Division, Central Pollachi Sub Division
Basic Detail
Tender No S38/21-22 DT31.01.2022
Bidding Type Tender
Location
City udumalpet
State Tamil Nadu
Key Dates
Publish Date 01 Feb 2022
Submission Date 16 Feb 2022
Open Date 17 Feb 2022
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 10000
Exemption Not Available
Document List
2d35d6d1-2571-4c7a-9c0b-6c272008a0b8.html
BOQ_262591.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Feb 01, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Feb 16, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Feb 17, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

2d35d6d1-2571-4c7a-9c0b-6c272008a0b8.html

xls

BOQ_262591.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders