Running Contract For Extension And Dismantling Of Electrical Network In Pollachi Division, Central Pollachi Sub Division Running Contract For Extension And Dismantling Of Electrical Network In Pollachi Division, Central Pollachi Sub Division
Tender Overview
Project Description
Running Contract For Extension And Dismantling Of Electrical Network In Pollachi Division, Central Pollachi Sub Division Running Contract For Extension And Dismantling Of Electrical Network In Pollachi Division, Central Pollachi Sub Division
BOQ
| Sl. No. | Item Description |
| 1 | Transporting |
| 2 | Transporting of RCC / RSJ / PSC / fabricated pole fromroad side to pole pit head |
| 3 | Transporting of Distribution Transformer/Metering set by using private vehicle other than bullock cart with load of one M.T minimum/vice versa Up to 30 Km |
| 4 | Transporting of Distribution Transformer/Metering set by using private vehicle other than bullock cart with load of one M.T minimum/vice versa Above 30 Km |
| 5 | Transporting of Line Materials from Sub-stores to section pocket or near the work spot at Road side using private vehicle other than bullock cart with load of one M.T minimum/vice versaUp to 8 Km |
| 6 | Transporting of Line Materials from Sub-stores to section pocket or near the work spot at Road side using private vehicle other than bullock cart with load of one M.T minimum/vice versa Above 8 Km |
| 7 | Loading of PSC / RCC pole upto 8.0 m |
| 8 | Loading of metal poles of all sizes |
| 9 | Loading of PSC / RCC poles 9 m & above |
| 10 | Unloading of PSC / RCC pole upto 8.0 m |
| 11 | Unloading of metal poles of all sizes |
| 12 | Unloading of PSC / RCC poles 9 m & above |
| 13 | Loading of cement bag of 50 Kgs |
| 14 | Unloading of cement bag of 50 Kgs |
| 15 | Loading of DistributionTransformer up to 100 KVA |
| 16 | Loading of DistributionTransformer above 100 KVA and below 500 KVA |
| 17 | Loading of DistributionTransformer 500 KVA |
| 18 | Loading of Metering set |
| 19 | Unoading of DistributionTransformer up to 100 KVA |
| 20 | Unloading of DistributionTransformer above 100 KVA and below 500 KVA |
| 21 | Unloading of DistributionTransformer 500 KVA |
| 22 | Unloading of Metering set |
| 23 | Excavation & back filling of pole pit for poles below 9 m (30\") per location by men / machine |
| 24 | Excavation & back filling of pole pit for poles 9 m (30\") and above per location by men / machine |
| 25 | Excavation & back filling of pole pit per location Hard rock requires blasting |
| 26 | Excavation & back filling of pole pit per location Hard rock without blasting |
| 27 | Excavation & back filling of pole pit per location Medium rock and dense medium rock requires blasting |
| 28 | Excavation & back filling of stay pit for poles below 9 m (30\") per location by men / machine |
| 29 | Excavation & back filling of stay pit for poles 9 m (30\") and above per location by men / machine |
| 30 | Excavation & back filling of stay pit per locationHard rock requires blasting |
| 31 | Excavation & back filling of stay pit per locationHard rock without blasting |
| 32 | EExcavation & back filling of stay pit per location Medium rock and dense medium rock requires blasting |
| 33 | Erection of poles by men / machine RCC / PSC / metal poles upto 8.0 m (27\") |
| 34 | Erection of poles by men / machine RCC / PSC /metal poles 9 m (30\") |
| 35 | Erection of poles by men / machine RSJ, PSC, Rail, Fabricated poles above 9 m (30\") |
| 36 | Erection of poles by men / machine RCC / PSC /metal poles 9 m (30\") |
| 37 | Erection of poles by men / machine RSJ, PSC, Rail, Fabricated poles above 9 m (30\") |
| 38 | Concreting of pole including cost of cement, sand & jally with a mixture of 1:3:6, including all materials per pole Mass concreting |
| 39 | Concreting of pole including cost of cement, sand & jally with a mixture of 1:3:6, including all materials per pole Sleeve concreting |
| 40 | Earthing of pole with wire including burying loop and binding |
| 41 | Earthing of pole with earthing coil including burying loop and binding |
| 42 | Erection of stay set complete |
| 43 | Fixing of 5\" V-X Arm |
| 44 | Fixing of 1372 mm (4\"6\") V-X-Arm |
| 45 | Fixing of 1068 mm (3\"6\") V-X-Arm |
| 46 | Fixing ofL.T. 3 Phase X-Arm |
| 47 | Fixing ofL.T. Single Phase X-Arm |
| 48 | Fixing of H.T/L.T. T.I. Fitting |
| 49 | Fixing ofDouble channel X-Arm |
| 50 | Fixing of Guarding Cross Arm |
| 51 | Fixing of Tapping Channel Cross Arm |
| 52 | Fixing of 11 KV Pin Insulator (Porcelain / Polymer) |
| 53 | Fixing of 11 KV Disc |
| 54 | Fixing of 22 KV PinInsulator (Porcelain / Polymer) |
| 55 | Fixing of 22 KV Disc |
| 56 | Fixing of 33 KV Pin Insulators |
| 57 | Fixing of33 KV Strain Disc |
| 58 | Fixing of L.T.Pin Insulators |
| 59 | Fixing of L.T.SHACKLE |
| 60 | Fixing ofknob |
| 61 | Fixing of HT LAS (3 nos) |
| 62 | Fixing of LT LAS (3 nos) |
| 63 | Paving of conductor, stringing binding jumpering complete with ACSR / AAAC for HT/LT line per KM7/2.50 or 7/2.59 (Weasel) |
| 64 | Paving of conductor, stringing binding jumpering complete with ACSR / AAAC for HT/LT line per KM 7/3.15 or 7/3.35 (Rabbit) |
| 65 | Paving of conductor, stringing binding jumpering complete with ACSR / AAAC for HT/LT line per KM7/4.09 (Raccoon) |
| 66 | Paving of conductor, stringing binding jumpering complete with ACSR / AAAC for HT/LT line per KM 6/4.72 + 7/1.57 (Dog) |
| 67 | Guarding arrangements per span Splitneutral guarding |
| 68 | Guarding arrangements per span Flat guarding with 4 wire 11 KV & 22 KV |
| 69 | Guarding arrangements per span P&T and Railway cradle guarding |
| 70 | a. Double pole transformer structure erection complete including transportation (from road side to structure location), excavation, mass concreting, assembling of structure materials, AB switch, HG fuse set, HT LAS, LT LAS, stay set, support insulators & pin insulators, complete earthing, feeding arrangements, HT jumpering complete, provision of LT bus arrangements, complete wiring and painting except erection of transformer (Split up details attached) |
| 71 | b. Double pole transformer structure erection complete as per item 28.a with DT metering (Whole Current Meter) arrangements |
| 72 | c. Double pole transformer structure erection complete as per item 28.a with DT metering (Whole Current Meter) arrangements and fixing of MODEM |
| 73 | a. Single pole transformer structure erection complete including transportation (from road side to structure location), excavation, mass concreting, assembling of structure materials, AB switch, HG fuse set, HT LAS, LT LAS, stay set, support insulators & pin insulators, complete earthing, feeding arrangements, HT jumpering complete, provision of LT bus arrangements, complete wiring and painting except erection of transformer (Split up details attached) |
| 74 | b. Single pole transformer structure erection complete as per item 29.a with DT metering (Whole Current Meter) arrangements |
| 75 | c. Single pole transformer structure erection complete as per item 29.a with DT metering (Whole Current Meter) arrangements and fixing of MODEM |
| 76 | Erection of transformer in new structure Below 200 KVA |
| 77 | Erection of transformer in new structure 200 KVA & above but below 500 KVA |
| 78 | Erection of transformer in new structure 500 KVA |
| 79 | i) DT Metering arrangements (for the works not covered by HQ schemes) - Whole Current Meter (including fixing of DT Meter Box) |
| 80 | ii) DT Metering arrangements (for the works not covered by HQ schemes) - LTCT Meter (including fixing of DT Meter Box) |
| 81 | Erection of AB Switch |
| 82 | Erection of HG Fuse set complete |
| 83 | Structure earthing complete (3 Nos. earth pits and 3 Nos. earth pipes complete) |
| 84 | Feeding arrangementswith open type fuse unit |
| 85 | HT & LT LAS fixing and jumpering complete |
| 86 | Fixing of support insulator angle and erection of 3 Nos. Pin insulators |
| 87 | Erection of HT LAS |
| 88 | Erection of LT LAS |
| 89 | H.T Jumpering complete |
| 90 | Erection ofdouble pole structure including fixing of top channel, x- bracings, earthing, providing stays, etc., complete |
| 91 | Erection of four pole structure including fixing of top channels, x-bracing, earthing, providing stays, etc., complete |
| 92 | Manufacturing of special type clamps for rail poles, RS joists, tubular pole, distribution transformer strucutre with material |
| 93 | Drilling of hole in channelangles etc., 3/4 & 1\" per hole |
| 94 | a. Cutting of Flat per cutting |
| 95 | b. Cutting of channel per cutting |
| 96 | c. Cutting of Angle-per cutting |
| 97 | d. Cutting of pipe-per cutting |
| 98 | Alteration of back clamp to suit works Back clamp |
| 99 | Alteration of back clamp to suit works Stay clamp |
| 100 | a. Fixing of new street light fittings |
| 101 | b. Fixing of new Sodium/Mercury lamp fittings |
| 102 | c. Street light switch box erection complete with pipe provision |
| 103 | a. Erection of metering set 11 KV / 22 KV / 33 KV |
| 104 | b. Dismantling of metering set 11 KV / 22 KV / 33 KV |
| 105 | T.I. Fitting welding withclamps |
| 106 | a. Cutting of R.S. Joist pole |
| 107 | b. Welding in R.S. Joist pole |
| 108 | a. New service connection wires dismantling and re-errection for Single Phase Service |
| 109 | b. New service connection wires dismantling and re-errection for Three Phase Service |
| 110 | Releasing of Single Phase Meter and refixing (for works not covered under HQ schemes) |
| 111 | Releasing of Three Phase Meter and refixing (for works not covered under HQ schemes) |
| 112 | Destruction of pole concreting at site |
| 113 | Retrievinggrill from Deteriorated RCC pole |
| 114 | a. Painting (2 coats) of Distribution Transformer below 100 KVA |
| 115 | b. Painting (2 coats) of Distribution Transformer 100 KVA & above upto 250 KVA |
| 116 | c. Painting (2 coats) of Distribution Transformer above 250 KVA |
| 117 | Painting of RSJ, Tubular pole including cross arms T.I fittings single coating |
| 118 | Painting of Red Oxide RSJ 36\" |
| 119 | Painting of Red Oxide RSJ 42\" |
| 120 | Painting of AluminiumRSJ 36\" |
| 121 | Painting of AluminiumRSJ 42\" |
| 122 | Pole at ground |
| 123 | Numbering of pole with black back ground and yellow letters including cost of paint per pole |
| 124 | Painting of transformer structure poles with two coats for each structure |
| 125 | Painting of service connection details in Meter Board / Agricultural services / Hut service door including cost of Paint and Brush |
| 126 | Replacement of Earthpipe per loc |
| 127 | Re-Earthing of structure completely |
| 128 | a. Cleaning of DT Yard |
| 129 | b. Cleaning of RMU |
| 130 | c. Cleaning of Ring Fencing |
| 131 | Setting right the leaning pole in HT/LT at pin point location |
| 132 | Setting right the leaning pole in HT/LT at cutpoint location |
| 133 | Resagging of lines for all sizes at cutpoint location per wire/span 7/2.50 or 7/2.59 (Weasel) |
| 134 | Resagging of lines for all sizes at cutpoint location per wire/span 7/3.15 or 7/3.35 (Rabbit) |
| 135 | Resagging of lines for all sizes at cutpoint location per wire/span 7/4.09 (Raccoon) |
| 136 | Resagging of lines for all sizes at cutpoint location per wire/span 6/4.72 + 7/1.57 (Dog) |
| 137 | Clearing ofbranches of trees Coconut |
| 138 | Clearing ofbranches of trees Others |
| 139 | Providing LT SpacersSingle Phase |
| 140 | Providing LT SpacersThree Phase |
| 141 | Erection of LT Shunt Capacitor including transport |
| 142 | Ground patrolling of HT lines during Breakdown |
| 143 | Rectification ofsnapped HT lineduring Breakdown Weasel ACSR 7/2.59 or AAAC 7/2.50 Sq mm |
| 144 | Rectification ofsnapped HT lineduring BreakdownRabbit ACSR 7/3.35 or AAAC 7/3.15 Sq mm |
| 145 | Rectification ofsnapped HT lineduring BreakdownRaccoon ACSR 7/4.09 Sq. mm |
| 146 | Rectification ofsnapped HT lineduring BreakdownDog ACSR 6/4.72 & 7/1.57 Sq mm |
| 147 | Rectification ofsnapped HT lineduring Breakdown Dog ACSR 6/4.72 & 7/1.57 Sq mm |
| 148 | Rectification of snapped LT line during Breakdown |
| 149 | Replacement of flashed over HT pin insulator, LAS, strain disc including jumpering, binding and transporting of required materials |
| 150 | Cleaning of 110 KV Breakers including CTs and allied maintenance work |
| 151 | Cleaning of 110 KV LAS |
| 152 | Cleaning of all types of 110 KV AB switch and applying petroleum jelly including tightness checking |
| 153 | Cleaning of 110 KV Power transformer insulators and assisiting for all other maintenance works |
| 154 | Cleaning of 33 KV / 22 KV / 11 KV Breakers and CTS and allied maintenance works |
| 155 | Cleaning and checking of 110 KV Bus insulators |
| 156 | Cleaning and checking of Capacitor bank and other accessories |
| 157 | Cleaning and checking of 33 KV / 22 KV / 11 KV AB switchesincluding tightening of bolt and nut and applying Petroleum jelly |
| 158 | Releasing and refixing of clamp in 110 KV / 33 KV 22 KV / 11 KV buses |
| 159 | Silica Gel Replacement |
| 160 | Clamps Tightness |
| 161 | Busbar Maintenance |
| 162 | HG Fuse Maintenance |
| 163 | AB Switch Maintenance |
| 164 | LT Open Type Maintenance |
| 165 | Inspection of Earthing & Tightness |
| 166 | Cleaning & Checking of DT Metering Box |
| 167 | Cleaning of DT |
| 168 | Oil Top Up |
| 169 | Laying & erection of OH cable |
| 170 | Dismandling of stay set complete |
| 171 | Dismandling of 5\" V-X Arm |
| 172 | Dismandling of 1372 mm (4\"6\") V-X-Arm |
| 173 | Dismandling of 1068 mm (3\"6\") V-X-Arm |
| 174 | Dismandling of. L.T. 3 Phase X-Arm |
| 175 | Dismandling of L.T. Single Phase X-Arm |
| 176 | Dismandling of H.T/L.T. T.I. Fitting |
| 177 | Dismandling ofDouble channel X-Arm |
| 178 | Dismandling of Guarding Cross Arm |
| 179 | Dismandling of Tapping Channel Cross Arm |
| 180 | Dismandling of 11 KV Pin Insulator (Porcelain / Polymer) |
| 181 | Dismandling of 11 KV Disc |
| 182 | Dismandling of22 KV PinInsulator (Porcelain / Polymer) |
| 183 | Dismandling of 22 KV Disc |
| 184 | Dismandling of 33 KV PinInsulator |
| 185 | Dismandling of 33 KV Disc |
| 186 | Dismandling of LT Pin Insulator |
| 187 | Dismandling of LT Shackle |
| 188 | Dismandling of Knob |
| 189 | Dismandling of HT LAS (3 nos) |
| 190 | Dismandling of LT LAS (3 nos) |
| 191 | Dismandling of conductor, stringing binding jumpering complete with 7/2.50 or 7/2.59 (Weasel) line per KM |
| 192 | Dismandling of conductor, stringing binding jumpering complete with 7/3.15 or 7/3.35 (Rabbit) line per KM |
| 193 | Dismandling of conductor, stringing binding jumpering complete with 7/4.09 (Raccoon) line per KM |
| 194 | Dismandling of conductor, stringing binding jumpering complete with6/4.72 + 7/1.57 (Dog) line per KM |
| 195 | Healthiness checking of meter |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender