| 1 | Item Description/ Heading |
| 2 | Establish ment of ground control point for DGPS Survey of Project Land site friom nearest Primery Control Point (PCP) of ORSAC |
| 3 | Identification of secondary control points |
| 4 | Study of Geo-Coordinates by DGPS RTK mode of Geo-referencing |
| 5 | Study of Geo-Coordinates by DGPS observation in RTK mode for Geo-referencing of forest patch and M.L.& Block boundary |
| 6 | Downloading of the sattelite image and its geo-referencing in GIS platform |
| 7 | Digitisation of forest area, area calculation,pre-field map preparation |
| 8 | Printing of maps of all village sheets and index map of both hard and soft copies(7set),each including shape file |
| 9 | Post processing and map preparation |
| 10 | Approval of the surveyed report along with plans |
| 11 | Verification /Authentication/Approval of the survey report along with plans from ORSAC/Competent Authority of Government of Odisha including deposition of Processing fee,if any(06 sets) |
| 12 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m All kinds of soil. |
| 13 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level :1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stoneaggregate 20 mm nominal size derived from natural sources) |
| 14 | Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete |
| 15 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500or more |
| 16 | White washing with lime to give an even shade : New work (three or more coats) |
| 17 | Lettering with black Japan paint of approved brand and manufacture |
| 18 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundationsetc. in layers not exceeding 20cm in depth, consolidating each deposited layer by rammingand watering, lead up to 50 m and lift upto 1.5 m. |
| 19 | Total impact of GST for the purpose of CTC |