Krishnagiri District Uthanagarai Block Under Agamt 2021-2022 Repairs And Renovation Of Agamt Library Building At Thiruvanapatti, Nochipatty, Mettuthangal, Kallavi, Gengapirampatty And Kadavani Panchayats Package No_ Agamt_Utg_01 Krishnagiri District U
Tender Overview
Project Description
Krishnagiri District Uthanagarai Block Under Agamt 2021-2022 Repairs And Renovation Of Agamt Library Building At Thiruvanapatti, Nochipatty, Mettuthangal, Kallavi, Gengapirampatty And Kadavani Panchayats Package No_ Agamt_Utg_01 Krishnagiri District Uthanagarai Block Under Agamt 2021-2022 Repairs And Renovation Of Agamt Library Building At Thiruvanapatti, Nochipatty, Mettuthangal, Kallavi, Gengapirampatty And Kadavani Panchayats Package No_ Agamt_Utg_01
BOQ
| Sl. No. | Item Description |
| 1 | 1.Renovation of Library Building at Thiruvanapatti Village H/o Thiruvanapatti |
| 2 | Finishing the roof top with Granolithic pattern floor finish with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISSHBG metal and the top rubed smooth etc., |
| 3 | White washing two coats using best freshly burnt shell lime including cost and conveyance of materials and labour chargesetc complete. |
| 4 | Oil Distempering ( old wall )Two Coats with best approved oil distember over prime coat of cement primer including cost and conveyance of materials and labour chargesetc complete. - 10.00 Sqm. |
| 5 | Painting Two Coats Approved Plastic Emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour chargesetc complete |
| 6 | Painting two Coats over Old iron Works using best quality of enamel paint including cost and conveyance of materials and labour chargesetc complete |
| 7 | Provision for Electrical arrangements |
| 8 | Light point |
| 9 | Fan point |
| 10 | plugpoint |
| 11 | service connection mains Runoff |
| 12 | WT bulk head fitting |
| 13 | CFL lamp of 25 W |
| 14 | Celing Fan |
| 15 | Light Point |
| 16 | Construction of toilet |
| 17 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 18 | Cement concrete 1:4:8 (one cement, four sand, and eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers . |
| 19 | Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. |
| 20 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications |
| 21 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., |
| 22 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS |
| 23 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs |
| 24 | Providing the following thickness of Granolithic pattern floor finish with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISSHBG metal and the top rubed smooth etc., complete complying with standard specification as directed. |
| 25 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers |
| 26 | Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm \"P\" or \"S\" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour) |
| 27 | White washing two coats using best freshly burnt shell lime including cost and conveyance of materials and labour chargesetc complete. |
| 28 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete |
| 29 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors including cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 30 | Supply of door size 0.75x1.80m - 1No |
| 31 | Towards cost and supply of Jolly |
| 32 | Towards cost and supply of RCC rings including cover slab |
| 33 | Towards Ramp |
| 34 | Repairs toDoors & Window Welding Charges |
| 35 | 2. Renovation of Library Building at Nochipatti Village H/o Nochipatti |
| 36 | Dismantling damaged weathering course with pressed tiles including all materials and labour charges etc complete |
| 37 | Weathering course concrete using best quality broken brick jelly of size 20mm in pure slacked lime over the RCC roof slab in th proportion of brick jelly to lime being32:12.5 by the volume and laid over a single layer and consolidated to the required dses |
| 38 | Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2cm of approved quality laid in CM 1:3, 12mm thick. With water proofing compound confirming to IS by 2% by weight of cement used & the joint pointed neatly to full depth |
| 39 | White washing two coats using best freshly burnt shell lime including cost and conveyance of materials and labour chargesetc complete. |
| 40 | Oil Distempering ( old wall )Two Coats with best approved oil distember over prime coat of cement primer including cost and conveyance of materials and labour chargesetc complete |
| 41 | Painting Two Coats Approved Plastic Emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour chargesetc complete |
| 42 | Painting two Coats over Old iron Works using best quality of enamel paint including cost and conveyance of materials and labour chargesetc complete |
| 43 | Provision for Electrical arrangements |
| 44 | WT bulk head fitting |
| 45 | CFL lamp of 25 W |
| 46 | Celing Fan |
| 47 | Construction of toilet |
| 48 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 49 | Cement concrete 1:4:8 (one cement, four sand, and eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers . |
| 50 | Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. |
| 51 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications |
| 52 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., |
| 53 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS |
| 54 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs |
| 55 | Providing the following thickness of Granolithic pattern floor finish with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISSHBG metal and the top rubed smooth etc., complete complying with standard specification as directed. |
| 56 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers |
| 57 | Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm \"P\" or \"S\" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour) |
| 58 | White washing two coats using best freshly burnt shell lime including cost and conveyance of materials and labour chargesetc complete. |
| 59 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete |
| 60 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors including cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 61 | Supply of door size 1.00x1.80m - 1No |
| 62 | Towards cost and supply of Jolly |
| 63 | Towards cost and supply of RCC rings including cover slab |
| 64 | Towards Ramp |
| 65 | Provision for Ramp arrangements |
| 66 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 67 | Cement concrete 1:4:8 (one cement, four sand, and eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers . |
| 68 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications |
| 69 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers |
| 70 | Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2. |
| 71 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete |
| 72 | 3. Renovation of Library Building at M.Vellalapatti Village H/o Mettuthangal |
| 73 | Dismantling damaged weathering course with pressed tiles including all materials and labour charges etc complete |
| 74 | Weathering course concrete using best quality broken brick jelly of size 20mm in pure slacked lime over the RCC roof slab in th proportion of brick jelly to lime being32:12.5 by the volume and laid over a single layer and consolidated to the required dses |
| 75 | Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2cm of approved quality laid in CM 1:3, 12mm thick. With water proofing compound confirming to IS by 2% by weight of cement used & the joint pointed neatly to full depth |
| 76 | New tiles |
| 77 | Old tiles |
| 78 | White washing two coats using best freshly burnt shell lime including cost and conveyance of materials and labour chargesetc complete. |
| 79 | Oil Distempering ( old wall )Two Coats with best approved oil distember over prime coat of cement primer including cost and conveyance of materials and labour chargesetc complete |
| 80 | Painting Two Coats Approved Plastic Emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour chargesetc complete |
| 81 | Painting two Coats over Old iron Works using best quality of enamel paint including cost and conveyance of materials and labour chargesetc complete |
| 82 | Repairs toDoors & Window Welding Charges |
| 83 | Provision for Electrical arrangements |
| 84 | Fan point |
| 85 | WT bulk head fitting |
| 86 | 16 amps Dpic Switch |
| 87 | CFL lamp of 25 W |
| 88 | Celing Fan |
| 89 | Construction of toilet |
| 90 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 91 | Cement concrete 1:4:8 (one cement, four sand, and eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers . |
| 92 | Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. |
| 93 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications |
| 94 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., |
| 95 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS |
| 96 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs |
| 97 | Providing the following thickness of Granolithic pattern floor finish with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISSHBG metal and the top rubed smooth etc., complete complying with standard specification as directed. |
| 98 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers |
| 99 | Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm \"P\" or \"S\" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour) |
| 100 | White washing two coats using best freshly burnt shell lime including cost and conveyance of materials and labour chargesetc complete. |
| 101 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete |
| 102 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors including cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 103 | Supply of door size 1.00x1.80m - 1No |
| 104 | Towards cost and supply of Jolly |
| 105 | Towards cost and supply of RCC rings including cover slab |
| 106 | Towards Ramp |
| 107 | Provision for Ramp arrangements |
| 108 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 109 | Cement concrete 1:4:8 (one cement, four sand, and eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers . |
| 110 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications |
| 111 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers |
| 112 | Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2. |
| 113 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete |
| 114 | 4. Renovation of Library Building at PanamarathupattiVillage H/o Kallavi |
| 115 | Dismantling damaged weathering course with pressed tiles including all materials and labour charges etc complete |
| 116 | Weathering course concrete using best quality broken brick jelly of size 20mm in pure slacked lime over the RCC roof slab in th proportion of brick jelly to lime being32:12.5 by the volume and laid over a single layer and consolidated to the required dses |
| 117 | Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2cm of approved quality laid in CM 1:3, 12mm thick. With water proofing compound confirming to IS by 2% by weight of cement used & the joint pointed neatly to full depth |
| 118 | New tiles |
| 119 | Old tiles |
| 120 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., |
| 121 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS |
| 122 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs |
| 123 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers |
| 124 | White washing two coats using best freshly burnt shell lime including cost and conveyance of materials and labour chargesetc complete. |
| 125 | Oil Distempering ( old wall )Two Coats with best approved oil distember over prime coat of cement primer including cost and conveyance of materials and labour chargesetc complete |
| 126 | Painting Two Coats Approved Plastic Emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour chargesetc complete |
| 127 | Painting two Coats over Old iron Works using best quality of enamel paint including cost and conveyance of materials and labour chargesetc complete |
| 128 | Provision for Electrical arrangements |
| 129 | WT bulk head fitting |
| 130 | CFL lamp of 25 W |
| 131 | Celing Fan |
| 132 | Construction of toilet |
| 133 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 134 | Cement concrete 1:4:8 (one cement, four sand, and eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers . |
| 135 | Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. |
| 136 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications |
| 137 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., |
| 138 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS |
| 139 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs |
| 140 | Providing the following thickness of Granolithic pattern floor finish with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISSHBG metal and the top rubed smooth etc., complete complying with standard specification as directed. |
| 141 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers |
| 142 | Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm \"P\" or \"S\" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour) |
| 143 | White washing two coats using best freshly burnt shell lime including cost and conveyance of materials and labour chargesetc complete. |
| 144 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete |
| 145 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors including cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 146 | Supply of door size 1.00x1.80m - 1No |
| 147 | Towards cost and supply of Jolly |
| 148 | Towards cost and supply of RCC rings including cover slab |
| 149 | Towards Ramp |
| 150 | Provision for Ramp arrangements |
| 151 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 152 | Cement concrete 1:4:8 (one cement, four sand, and eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers . |
| 153 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications |
| 154 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers |
| 155 | Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2. |
| 156 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete |
| 157 | 5. Renovation of Library Building at Appinaickanpatti Village H/o Gengapirampatti |
| 158 | Dismantling damaged weathering course with pressed tiles including all materials and labour charges etc complete |
| 159 | Weathering course concrete using best quality broken brick jelly of size 20mm in pure slacked lime over the RCC roof slab in th proportion of brick jelly to lime being32:12.5 by the volume and laid over a single layer and consolidated to the required dses |
| 160 | Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2cm of approved quality laid in CM 1:3, 12mm thick. With water proofing compound confirming to IS by 2% by weight of cement used & the joint pointed neatly to full depth |
| 161 | New tiles |
| 162 | Old tiles |
| 163 | White washing two coats using best freshly burnt shell lime including cost and conveyance of materials and labour chargesetc complete. |
| 164 | Oil Distempering ( old wall )Two Coats with best approved oil distember over prime coat of cement primer including cost and conveyance of materials and labour chargesetc complete |
| 165 | Painting Two Coats Approved Plastic Emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour chargesetc complete |
| 166 | Painting two Coats over Old iron Works using best quality of enamel paint including cost and conveyance of materials and labour chargesetc complete |
| 167 | Provision for Electrical arrangements |
| 168 | WT bulk head fitting |
| 169 | Tube Light |
| 170 | Light and Fan Point |
| 171 | Construction of toilet |
| 172 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 173 | Cement concrete 1:4:8 (one cement, four sand, and eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers . |
| 174 | Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. |
| 175 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications |
| 176 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., |
| 177 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS |
| 178 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs |
| 179 | Providing the following thickness of Granolithic pattern floor finish with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISSHBG metal and the top rubed smooth etc., complete complying with standard specification as directed. |
| 180 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers |
| 181 | Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm \"P\" or \"S\" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour) |
| 182 | White washing two coats using best freshly burnt shell lime including cost and conveyance of materials and labour chargesetc complete. |
| 183 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete |
| 184 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors including cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 185 | Supply of door size 1.00x1.80m - 1No |
| 186 | Towards cost and supply of Jolly |
| 187 | Towards cost and supply of RCC rings including cover slab |
| 188 | Towards Ramp |
| 189 | Provision for Ramp arrangements |
| 190 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 191 | Cement concrete 1:4:8 (one cement, four sand, and eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers . |
| 192 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications |
| 193 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers |
| 194 | Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2. |
| 195 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete |
| 196 | 6. Renovation of Library Building at Kadhavani Village H/o Kadhavani |
| 197 | Dismantling damaged weathering course with pressed tiles including all materials and labour charges etc complete |
| 198 | Weathering course concrete using best quality broken brick jelly of size 20mm in pure slacked lime over the RCC roof slab in th proportion of brick jelly to lime being32:12.5 by the volume and laid over a single layer and consolidated to the required dses |
| 199 | Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2cm of approved quality laid in CM 1:3, 12mm thick. With water proofing compound confirming to IS by 2% by weight of cement used & the joint pointed neatly to full depth |
| 200 | New tiles |
| 201 | Old tiles |
| 202 | White washing two coats using best freshly burnt shell lime including cost and conveyance of materials and labour chargesetc complete. |
| 203 | Oil Distempering ( old wall )Two Coats with best approved oil distember over prime coat of cement primer including cost and conveyance of materials and labour chargesetc complete |
| 204 | Painting Two Coats Approved Plastic Emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour chargesetc complete |
| 205 | Painting two Coats over Old iron Works using best quality of enamel paint including cost and conveyance of materials and labour chargesetc complete |
| 206 | Provision for Electrical arrangements |
| 207 | WT bulk head fitting |
| 208 | Tube Light |
| 209 | Light and Fan Point |
| 210 | Construction of toilet |
| 211 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 212 | Cement concrete 1:4:8 (one cement, four sand, and eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers . |
| 213 | Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. |
| 214 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications |
| 215 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., |
| 216 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS |
| 217 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs |
| 218 | Providing the following thickness of Granolithic pattern floor finish with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISSHBG metal and the top rubed smooth etc., complete complying with standard specification as directed. |
| 219 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers |
| 220 | Supplying and fixing in position white glazed EWC of best quality and approved make with 100mm \"P\" or \"S\" traps with double flapped right P.V.C seat cover with C.p brass hinges with 10.0litres PVC low level flushing tank with all internal fittings etc., all complete complying with standard specifications(white colour) |
| 221 | White washing two coats using best freshly burnt shell lime including cost and conveyance of materials and labour chargesetc complete. |
| 222 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete |
| 223 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors including cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 224 | Supply of door size 1.00x1.80m - 1No |
| 225 | Towards cost and supply of Jolly |
| 226 | Towards cost and supply of RCC rings including cover slab |
| 227 | Towards Ramp |
| 228 | Provision for Ramp arrangements |
| 229 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 230 | Cement concrete 1:4:8 (one cement, four sand, and eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers . |
| 231 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications |
| 232 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers |
| 233 | Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2. |
| 234 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete |
| 235 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender