Workshop Equipment ( Pumps And Misc. Equipment For Maitree Project As Per Nit-1.0 Total Lump Sum Firm Price Inclusive Of All Prevailing Taxes, Duties And Other Levies For Supply Part & Services Part, Comprising Of Design ( I.E. Preparation And Submission Of Drawing / Documents Including “As Built” Drawings And O&M Manuals ) , Engineering, Manufacture, Fabrication, Assembly, Inspection / Testing At Vendors & Sub-Vendor’S Works, Painting, Cutting Tools And Cutting Tool Mounting Accessories ( As Applicable ) , Power Cable And Plug For Mobile Equipment ( As Applicable ) , Maintenance Tools & Tackles ( As Applicable ) , Fill Of Lubricants & Consumables Till Warranty Period, Along With Spares For Erection, Startup And Commissioning As Required, Initial Spares ( As Applicable ) , Foundation Bolts, Nuts, Lock Nuts, Washers, Levelling Pads, Forwarding, Sea-Worthy Packing, Shipment And Delivery As Specified, Supervision Of Erection And Comissioning At Site, Training Of Customers O & M Staff, Demonstration Testing At Site, Lodging, Boarding Etc, Travelling Expenses For Specified Items For Project And Package Specified Complete With All Accessories For The Total Scope Defined As Per Bhel Nit & Tender Technical Specification, Amendment & Agreements Till Placement Of Order In Line With Drawings / Documents / Test Procedures Approved By Bhel / Customer For Workshop Equipment ( Pumps And Misc. Equipment ) As Per Details In Different Sections / Volumes Of Tender Specification ( Ref. No. Pe-Ts-421-568-A008b ) . Bidder Can Quote Part Scope / Entire Scope From The Breakup Given Below. Breakup Of 1.0 Is As Below : 1.1 Pumps For Workshop Equipment 1.1A Total Lump Sum Supply Price Of Pumps For Workshop Equipment Along With All Accessories ( Refer Annexure-Ia For List Of Equipment / Items ) . 8413 Lot 1 1.1B Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc. For Supervision Of Erection & Commissioning Etc. At Site For Pumps For Workshop Equipment. 998732 Days 2 1.1C Total Lump Sum Price For Site Visit ( Should Include Travel Expenses To / Fro Site, Visa / Insurance ( If Applicable ) , Intermediary Stay ) For Supervision Of Erection & Commissioning Etc. At Site For Pumps For Workshop Equipment. 998732 Visit 1 1.1D Total Price For Pumps For Workshop Equipment ( 1.1A+1.1B+1.1C ) 1.2 Stationary Valve Grinding Machine 1.2A Total Lump Sum Supply Price Of Stationary Valve Grinding Machine Along With All Accessories . 84602990 Nos 2 1.2B Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc. For Supervision Of Erection & Commissioning Etc. At Site For Stationary Valve Grinding Machine. 998732 Days 3 1.2C Total Lump Sum Price For Site Visit ( Should Include Travel Expenses To / Fro Site, Visa / Insurance ( If Applicable ) , Intermediary Stay ) For Supervision Of Erection & Commissioning Etc. At Site For Stationary Valve Grinding Machine. 998732 Visit 1 1.3 Combined Folding, Bending And Embossing Machine 1.3A Total Lump Sum Supply Price Of Combined Folding, Bending And Embossing Machine ( One Set ) Along With All Accessories . 84622990 Nos 1 1.4 Flanging Machine 1.4A Total Lump Sum Supply Price Of Flanging Machine Along With All Accessories . 84792090 Nos 1 1.4B Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc. For Supervision Of Erection & Commissioning Etc. At Site For Flanging Machine. 998732 Days 2 1.4C Total Lump Sum Price For Site Visit ( Should Include Travel Expenses To / Fro Site, Visa / Insurance ( If Applicable ) , Intermediary Stay ) For Supervision Of Erection & Commissioning Etc. At Site For Flanging Machine. 998732 Visit 1 1.4D Total Price For Flanging Machine ( 1.4A+1.4B+1.4C ) 1.5 Mobile Floodlighting Sets 15A Total Lump Sum Supply Price Of Mobile Floodlighting Sets Along With All Accessories ( Packing Of Items Shall Be Contenrized ) . Set 4 1.5B Total Lump Sum Price For Stay At Site Including Lodging, Boarding, Local Conveyence Etc. For Supervision Of Erection & Commissioning Etc. At Site For Mobile Floodlighting Sets. 998732 Days 3 1.5C Total Lump Sum Price For Site Visit ( Should Include Travel Expenses To / Fro Site, Visa / Insurance ( If Applicable ) , Intermediary Stay ) For Supervision Of Erection & Commissioning Etc. At Site For Mobile Floodlighting Sets. 998732 Visit 1