Repair Of Various Size Pipe Line In Sub. Div. Lalsot
Tender Value
5 Lakhs
Estimated cost
Bid Submission
02 Feb 2022
0 days left
EMD
10000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
lalsot → Rajasthan
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Repair Of Various Size Pipe Line In Sub. Div. Lalsot
BOQ
| Sl. No. | Item Description |
| 1 | Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe lineup to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) |
| 2 | In all type Soil AC/PVC/HDPE pipe |
| 3 | 50/63/75mm |
| 4 | 80/90mm |
| 5 | 100/110mm |
| 6 | 125/140mm |
| 7 | 150/160/180mm |
| 8 | Add on above item no. 1.1.1 for B.T. Road 5% |
| 9 | Add on above item no. 1.1.1 for C.C. Road 10% |
| 10 | Add on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% |
| 11 | Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) |
| 12 | In all type Soil |
| 13 | 80mm |
| 14 | 100mm |
| 15 | 125mm |
| 16 | 150mm |
| 17 | 200mm |
| 18 | Add on above item no. 1.2.1 for B.T. Road5% |
| 19 | Add on above item no. 1.2.1 for C.C. Road10% |
| 20 | Add on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% |
| 21 | Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) |
| 22 | In all type Soil |
| 23 | 50/63/75mm |
| 24 | 80/90mm |
| 25 | 100/110mm |
| 26 | 125/140mm |
| 27 | 150/160/180mm |
| 28 | Add on above item no. 1.3.1 for B.T. Road5% |
| 29 | Add on above item no. 1.3.1 for C.C. Road10% |
| 30 | Add on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. 20% |
| 31 | Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) |
| 32 | In all type Soil |
| 33 | 80 mm |
| 34 | 100 mm |
| 35 | 125 mm |
| 36 | 150 mm |
| 37 | 200 mm |
| 38 | Add on above item no. 1.4.1 for B.T. Road5% |
| 39 | Add on above item no. 1.4.1 for CC Road 10% |
| 40 | Add on above item no. 1.4.1 if depth of pipe line is above 1.5 mtr to 3.0 mtr20% |
| 41 | Deduct on above item no. 1.4.1 if valve is fixed at plinth level / platform i.e. no excavation is required |
| 42 | Removal of Choking from pipe line, including tree roots, malba, sand and otherby manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. |
| 43 | In all type Soil |
| 44 | 75 mm |
| 45 | 90/80 mm |
| 46 | 110/100 mm |
| 47 | Add on above item no. 1.5.1 for B.T. Road5% |
| 48 | Add on above item no. 1.5.1 for CC Road 10% |
| 49 | Add on above item no. 1.5.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. 20% |
| 50 | Removal of Choking from pipe line, including tree roots, malba, sand and otherby manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. |
| 51 | In all type Soil |
| 52 | 80 mm |
| 53 | 100 mm |
| 54 | Add on above item no. 1.6.1 for B.T. Road5% |
| 55 | Add on above item no. 1.6.1 for CC Road 10% |
| 56 | Add on above item no. 1.6.1 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. 20% |
| 57 | Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour. |
| 58 | Add on above item no. 1.7 for B.T. Road5% |
| 59 | Add on above item no. 1.7 for CC Road 10% |
| 60 | Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) |
| 61 | In all type Soil |
| 62 | 80 mm dia pipe to 100mm |
| 63 | 125 mm dia pipe to 150mm |
| 64 | Add on above item no. 1.8.1 for B.T. Road5% |
| 65 | Add on above item no. 1.8.1 for CC Road 10% |
| 66 | Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). |
| 67 | In all type Soil |
| 68 | 80 mm to 110 mm |
| 69 | 125 mm to 165 mm |
| 70 | Add on above item no. 1.9.1 for B.T. Road5% |
| 71 | Add on above item no 1.9.1 for CC Road 10% |
| 72 | Add on above item no. 1.9.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 20% |
| 73 | Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). |
| 74 | In all type Soil |
| 75 | 80 mm to 100 mm |
| 76 | 125 mm to 150 mm |
| 77 | Add on above item no. 1.10.1 for B.T. Road5% |
| 78 | Add on above item no.1.10.1 for CC Road 10% |
| 79 | Add on above item no.1.10.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr 20% |
| 80 | Labour charges for removal of complaint of polluted water supply to the consumers |
| 81 | Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours |
| 82 | Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal &tack coat as per site condition by using ready cold mixup to the satisfaction of engineer in charge.The rate includes the makingof pit in regular shape, all labour, material and T&P charge complete job. |
| 83 | Restoration of cement concreteroad including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compactingcement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction ofengineer incharge.The rate includes the makingof pit in regular shape, all labour, material and T&P charge complete job. |
AI Tender Summary
Tender Timeline
Jan 24, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedFeb 02, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedFeb 03, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender