Municipal Corporation-MC has published Repair Of 5Tpd Bio Gas Plant Alongwith Its Operation And Maintenance For The Time Period Of 3 Years Including The Cost Of Manpower T And P Consumables And Spare Parts Complete In All Respects At Industrial Area Phase 1 Chandigarh. Submission Date for this Tender is 28-01-2022. Bio Gas Plant Tenders in chandigarh Chandigarh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Repair of damged part/ Replace by new items of machinery & system of biogas Plant:- HS Code:8469 for the items follows as under:- a) Providing and fixing ,Biomass grinder, electric drive & replacing grinding bledes, ball bearing & other system.(2 no.) b) Providing and fixing Gas purification Grid with gas compressor.c)Providing and fixingAeration Grid with air compressor. d) Providing and fixing Electric control Panel of machinery operating & cables e) Providing and fixingSupply of 80 cum balloon (1 No.) f) Generator servicing & spare parts, battery, panel.g) Water inside water seal of main digester heating system h) H2 O & H2 S scrubbers & allied pipes. |
2 | Repair & Servicing of Biogas Plant:-Removal of dome from main digester & erection of the same at same place after work is over,Cleaning/ Repairing & Painting of dome balance system & dome,Removal of sludge/ mud & sand / soil-manually (2,20,000 Litres) up to the bottum of all 4 compartments of main digester, Removal of sludge/ mud / sand / soil-manually (60,000 Litres) up to the bottum of all 2 compartments of primary digester, Removal of sludge/ mud & sand / soil-manually (64,000 x 4 pits= 2,56,000 Litres) up to the bottom of all 4 manure pits. Commissioning of Biogas Plant with BARC bacteria, complete including replacement of nut & bolt, washers,new gaskit for dome seal , grinding of rusted area complete in all respect as per entire satisfaction of EIC. |
3 | Operation & Maintance of 5 TPD of bio gas plant complete in all respects including the cost of T&P and maintance items and consumable etc as following:a) Hand Glove / Soap/ Ph paper- other consumables//miscellaneous etc. b) Generator Oil/ Spark plug/ other spare parts & electric/ electronic part of panel( MCB/ Timber/ Coil/ Sensor Etc) fitting etc c) Air compressor/ gas compressor:- Oil/ piston/ O-ring/spareparts(Total - 2 machine) d) Biogas Grinder:-Cutting Blades/ motor winding etc (Total - 2 machines)e) Scrubber:- Replacing old chemical like silica/ activated charcoaletc (Total -2- Instruments) f) Gas & Water pipeline &Biogas storage ballon :- PVC pipes/ valves/brass clips/nozzle/tap/adesives etc.g) Biowaste collection crates/buckets/vegetables chopper etc. h) Painting biogas plant structure by cement paint & MS/FRP by oil paint once in 3 years. In case of any problem of death of bacteria & plant stop functioning then opening /cleaning of main & primary digesters & restarting of Biogas Plant. Also MS "Jali" cover on the manure pit has to be replaced occasionally.(O&M cost 1st year ) |
4 | O&M cost II ndyear |
5 | O&M cost III rd year |