Construction Of Masonry Field Channel At Laxminathpur Major Rli Scheme Under Ranaghat-I Block, kalyani-West Bengal

Water Resources Department-WRD has published Construction Of Masonry Field Channel At Laxminathpur Major Rli Scheme Under Ranaghat-I Block. Submission Date for this Tender is 12-02-2022. Canal Construction Tenders in kalyani West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

30805771
Construction Of Masonry Field Channel At Laxminathpur Major Rli Scheme Under Ranaghat-I Block
Open Tender
Indian
West Bengal
kalyani
12-02-2022

Tender Details

Construction Of Masonry Field Channel At Laxminathpur Major Rli Scheme Under Ranaghat-I Block

Key Value

Document Fees
Refer document
EMD
INR 19100.0 /-
Tender Value
INR 9.54 Lakhs /-

BOQ Items

Construction of masonry Field Channel at Laxminathpur Major R.L.I Scheme under Fulia (A-M) Workshop Sub-Division under Core Sector Programme.
Sl. No. Item Description
1Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
2Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
3Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth
4Ordinany cement concrete (mix 1:2;4) with graded tone chips (20 mm nominal size) excluding shuttering and reinforcement if any in ground floor as per relevant IS codes. Pakur variety.
5Hire & labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting fixing & striking out after completion of works ( upto roof of ground floor ) a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of Engineer-In-Charge
612.5 cm thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
7Plaster (to wall, floor, ceilingetc. ) with sand and cement mortar including rounding off or chamfering corners, as directed and racking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor) [excluding cost of chipping over concrete surface]. (a ) with ( 1:6 ) cement mortar (ii) 15 mm thick plaster.
8Neat cement punning about 1.5 mm thick in wall, dado, floor, drain ,door and window sill etc.
9A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
10Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction (a) For works in foundation, basement and upto roof of ground floor/upto 4 m. i) Tor steel/ Mild Steel
11Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement 25 mm. thick
12Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
13Extra transportation charges for carriage of constructional materials forWTA by Cart / Boat/ Head load @ 4% of actual execution of items (Except earth work in excavation & filling works )
14TOTAL
15Including GST @12%
16Including CESS @1%
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail