Tender For Sawali Water Supply Scheme Tq. Buldana, Dist.Buldana
Tender Value
66.18 Lakhs
Estimated cost
Bid Submission
29 Jan 2022
0 days left
EMD
67000
Bank guarantee accepted
Document Fee
5600
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
sawali → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Sawali Water Supply Scheme Tq. Buldana, Dist.Buldana
BOQ
| Sl. No. | Item Description |
| 1 | Subwork No. 1) TRENCH GALLERY |
| 2 | Item No.1 -Excavation in general in Soft material comprising ofsoft soil ,hard murum with boulders etc as required in wet or dry condition for head worksincluding removing the excavated material upto a distance of 50m beyond area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling etc complete. |
| 3 | Lift0.00to 1.50 m |
| 4 | Lift1.50to 3.00 m |
| 5 | Lift1.50to 3.00 m |
| 6 | Item No.2 -Providing at site of works ISI standard RCC slotted pipes of NP-3 class including cost of all central and local taxes, octroi, inspection, transportation, etc. complete including cost of RCC collar, etc. complete |
| 7 | 450 mm dia |
| 8 | Item No.3 - Lowering, laying and jointing RCC slotted pipes of following diameters including all leads and lifts, cost of jointing material, labour, etc. complete as directed by Engineer-in-charge. |
| 9 | 450 mm dia |
| 10 | Item No.4 - Providing, lowering, laying and placing in position, shrouding material for porous pipe gallery / slotted pipe gallery / trench gallery with all leads and lifts involved including transportation of materials to site of works, screening and washing of materials and placing in position with given section, etc. complete as directed by Engineer-in-charge. |
| 11 | 40 mm guage pebbles |
| 12 | 12-20 mm Guage Pebbles |
| 13 | 6-12 mm Guage Pebbles |
| 14 | Sand less than 6 mm |
| 15 | Item No.5- Providing and spreading around the well 1 mm thick Polyethylene sheet complete as directed by Engineer in Charge |
| 16 | Item No.6 - Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. |
| 17 | Subwork No. 2) PURE WATER PUMPING MACHINERY |
| 18 | Item No. 1 - Providing, errecting and giving test of submersible Pump set confirming to I.S. 8034 and motor confirming to I.S. 9283 with water proof wiring, pump shall be suitable for 64m delivery head and discharge of 4.90 LPS with stainless steel shaft, motor suitable for working 415V(+/-) 10%, 3 Phase, 50 Hz AC supply with cable guard, thrust carbon bearing to withstand entire hydraulic thrust. The pump shall be suitable for direct coupling with suitable suction, straining pump should have suitable discharge outlet as per manufacturers design. Stream lined non return valve shall be provided with pump, 3m submersible copper conductor cable and 2 pair of erection clamps, 65mm width, 150mm Dia thick shall be provided with each pump. |
| 19 | 7.5 HP Submersible Pump 19460 LPH Discharge 47 Head in M150 mm dia |
| 20 | Item No. 2 - Providing & erecting ISI mark GI pipe of following class and dia including all local and central taxes octroi inspection charges transpotation to stores etc complete. Suction Pipe |
| 21 | 80 mm Dia. G.I. Pipe ( medium ) |
| 22 | Item No. 3 - Lowering, laying and jointing G. I. pipes and specials of following class and diameter including conveyance from stores to site of works, all labour, etc. complete either underground or in vertical position, as directed by Engineer-in-charge. |
| 23 | 80 mm dia G.I. Ppe (Medium) |
| 24 | Item No. 4 - Providing & fixing ISI mark CID/F reflux valves (non-return valves) of following dia including railway freight, inspection charges, unloading from railway wagon, loading into trucks, transportation upto departmental stores, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete |
| 25 | 80 mm dia Non Return Valve |
| 26 | Item No. 5 - Providing and fixing double flange sluice valve confirming for IS 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. |
| 27 | 80 mm dia sluice valve |
| 28 | Item No. 6 - Providing & fabricating of suitable size base frame for submerssible pump sets. |
| 29 | Item No. 7 - Supplying errecting G.I.Pipes A Grade errected for enclosing armoured cable 25 mm dia for underground and above ground cable with etc. complete to cover the cable all over |
| 30 | Item No. 8 - Making trench in soft soil of suitable width and depth for laying providing LT cable upto 10 sq.mm complete As per specification |
| 31 | Item No. 9 - Providing & fixing L.T. panel comprising of ameter, voltmeter switches capacitor, water level ground etc. |
| 32 | Item No. 10 - Providing & fixing electric cable (flat) 4 mm2 for submersible pump etc. 3 core 4 sqmm |
| 33 | Item No. 11 - Providing and supplying ISI standard CI flanged / S& S specials including all statutory duties & taxes such as GST levied by GOI & GOM in allrespect, railway freight, insurance, unloading from railway wagon, loading into truck transport to departmental store /site, unloading stacking etc. complete. |
| 34 | Item No. 12 - EARTHINGSupplying & errecting galvanised cast iron earth plate size 60 x 60 x .6 cm complete with all materials , testing as per specification No.EA-EP |
| 35 | Item No. 13 - Providing & making flanged joints to flanged C.I pipes of all classes/specials etc including cost of all jointing materials ( rubber packing,nut bolts etc),labour,hydraulic testing etc complete. |
| 36 | Item No. 14 - Providing & fixing 100 mm dia Pressure guage etc. |
| 37 | Subwork No. 3) PURE WATER RISING MAIN |
| 38 | Item No. 1 - Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i. e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOM in all respect etc. complete. |
| 39 | 140 mm dia HDPE 6 kg/cm2 Pipe |
| 40 | Item No. 2 - Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. complete as per IS-1239/2004. |
| 41 | 150 mm dia G.I. Medium Class Pipe |
| 42 | Item No. 3 - Providing & supplying HDPE/ CI/MS/ GI specials ( 5 % of cost of pipe shall be considered percent of specials for estimate purpose.) |
| 43 | Item No. 4 - Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete. |
| 44 | As Scoure Value 80 mm dia Sluice Valve |
| 45 | As Isolation Value 150 mm dia Sluice Valve |
| 46 | Item No. 5 - Providing and supplying Air Valves as per IS-14845 and MJP’s standard specifications of approved make and quality of following diameters including railway freight, inspection charges, unloading from railway wagons, loading into truck, transportation upto departmental stores, unloding and stacking excluding GST levied by GOI & GOM in all respect etc. complete. |
| 47 | 50 mm dia Double Ball Air Valve |
| 48 | Item No. 6 - Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, soft rock, hard rock including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
| 49 | Item No. 7 - Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. |
| 50 | Item No. 8 - Lowering, Laying and Jointing H. D. P. E./M. D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointingprocedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II |
| 51 | 140 mm dia HDPE 6 kg/cm2 Pipe |
| 52 | Item No. 9 - Lowering, laying and jointing G. I. pipes and specials of following class and diameter including conveyance from stores to site of works, all labour, etc. complete either underground or in vertical position, as directed by Engineer-in-charge. |
| 53 | 140 mm dia HDPE 6 kg/cm2 Pipe |
| 54 | Item No. 10 - Hydraulic testing of H. D. P. E./ M. D. P. E. pipe line to specified pressure including cost of all materials and labour and water for testing for specified length including cutting, placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost ofretesting, if necessary and reinstating to original position.. |
| 55 | 140 mm dia HDPE 6 kg/cm2 Pipe |
| 56 | Item No. 11 - Hydraulic testing of G. I. pipe line to specified pressure including cost of all materials and labour and water for testing for the length upto 1km using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour operation charges etc. required for testing, The rates under this item shall also include cost of retesting if necessary and reinstating to original postion. |
| 57 | 150 mm dia G.I. Medium Class Pipe |
| 58 | Item No. 12 - Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of valves.) |
| 59 | As Scoure Value 80 mm dia Sluice Valve |
| 60 | As Isolation Value 150 mm dia Sluice Valve |
| 61 | Item No. 13 - Providing and laying in situ 1:2:4 (M-150) grade of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. |
| 62 | Item No. 14 - Providing and fixing in position air valve shaft including providingand fixing GI Medium class or 6mm thick M.S, PIPE shaft 2.70m long over branch flange of air valve tee providing PCCblock of M- 150concrete 150mm thick around the air valve tee including encasing of vertical shaft in PCC M-150 as shown in type design together with providing and making flanged ionts wherver required and fixing of air valve over the shaft excluding cost of air vavle and branch flanged air valve tee, etc. complete as per type desihn and as per directed by Engineer - in -charge for following diameters of pipe line |
| 63 | Upto 150 mm dia. Pipe line |
| 64 | Item No. 15 - Providing and fixing in position M.S. Air Valve boxes fabricated with 2 mm thick M.S. plate 30 x 30 x 3 mm size M.S. angle frame, concreteing in M150 for fixing the box in position, applying two coats of oil paint, painting chainage, locking arragement etc. complete as directed by Engineer in Charge etc. |
| 65 | 50 mm dia For Double ball Air Valve |
| 66 | Item No. 16 - Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5proportion precast RCC frame and cover, etc. complete as directed by Engineer-in-charge |
| 67 | Item No. 17 - Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard murum material in 15cm layers with all leads and lifts including consolidation, surcharging etc. complete. |
| 68 | Subwork No. 4) CONSTRUCTION OF RCC ESR 25000 Lit 9 Mt. Staging |
| 69 | Item No. 1 - Designing (aesthetically) and constructing RCC elevated service reservoirs of following capacity with RCC staging consisting of columns, internal and external bracings spaced vertically not more than 4.5M. Centre to centre for ESR having capacity upto 500cum and not more than 6 m. c/c for ESRs having capacity above 500 cum including excavation in all types of strata, foundation concrete, cement plaster with water proofing compound to the inside face of the container including refilling disposing of the surplus stuff within a lead of 50 M. all labour and material charges including lowering, laying, erecting,, hoisting and jointing of pipe assembly of inlet, outlet, washout, overflow and bypass arrangements as per departmental desing, providing and fixing accessories such as M.S. ladder, C.I. manhole frame and covers water level indicatiors, lightening conductor, G.I. pipe railing around walk |
| 70 | way and top slab, providing spiral stairecase from ground level to roof level & stainless steel ladder in container, MS grill gate of 2 M. height with locking arrangement of approved design BB masonary chambers for all valves, ventilating shafts, providing and applying three coats of Acrylic emulsion with silicon additives paint to the structure including roof slab epoxy painting to internal surface & antitermite treatment for underground parts of the structure and giving satisfactory water tightness test as per IS code the job to include painting the name of the scheme and other details on the reservoir as per the directions of Engineer-in-charge |
| 71 | Note :- |
| 72 | 1) The design of the structure shall be in accordance with relevant (IS 456-1987,IS 875-1987, IS 3370 - 1965or revised) |
| 73 | 2) The design shall satisfy the stipulations as per IS 1983- 1984 and IS 13920 / 1993 for seismic force and IS 11682/1985 for RCC staging of overhead tanks. |
| 74 | 3)For design having more than 6 columns, provision of internal bracing is obligatory. External bracing is also obligatary. |
| 75 | 4) The entire structure shall be in M-250 mix only.However concrete in contact with water such as container , base slab , wall ,roof slab & footing in water born area shall be in M-300. |
| 76 | 5) Plain round mild steel bars grade I confirming to IS 432 part -I or high yield strength deformed bars confirming to IS 1786 or IS 1139 shall be used, grade II mild steel bars will not be allowed |
| 77 | 6) Irrespective of the type of foundation proposed in the design one set of bracing be provided at the ground level. |
| 78 | 7) These rates include providing M.S.ladder for ESR\"s upto 2 lakh liters capacity and providing spiral staircase for ESR above 2 lakh lit. capacity. |
| 79 | 8) Staging height will have to be designed with stresses of M-200 concrete.However all RCC construction should be done in m 250 except concrete in contact with water shall be designed & constructed in M300. |
| 80 | 9) These rates are including the cost of uplift pressure if any and entire dewatering during execution.In case of water logging area where water is struch at shallow depth extra provision of dewatering shall be made as per site condition. |
| 81 | 10) All conditions given in the Member Secretary\"s Circular No.MJP/TS-1/350/1668 Dt.2.8.97 and MJP/S-1/350/2127 Dt.13.7.99 shall be strictly followed and additional cost if any, due to these conditions is included in the rates mentioned below. |
| 82 | 11) 75% part rate shall be payable for reinforcement cocrete and plastering items of containers of ESR till satisfactory hydraulic testing for water tightness in given and till that work shall be treated as incomplete. |
| 83 | 12) The rates as indicated in the table are excluding the cost of pipes, specials, valves required for inlet, outlet, washout, overflow and bypass arrangements. The scope of the pipe assembly work shall be upto 5 M. beyond outside face of the outremost column. |
| 84 | 13) For ESR upto 500 cum capacity CIDF pipes upto 300 mm dia shall be provided and specials should be used. For ESR above 500 cum, M.S. pipes and M.S. specials (minimum 8mm thick uo to 500mm dia. & 10 mm thickness above 500 mm dia.) shall be used with proper anticorrosive epoxy treatment from inside and outside |
| 85 | 14) Below mentioned rates are for foundations with individual footing with bearing capacity of 20 tonnes per sqm. For raft foundations, these rates shall be increased by 7.5% where safe bearing capacity (SBC) is 5 MT per sqm and by 5% where SBC is more than 5 MT / sqm and upto 10 MT/sqm. This % of 5% or 7.5% is applicable for estimation of amount of LS item of ESR. For Extra Item due to change from individual foundation to raft actual increase in concrete and steel be paid as per relevent DSR Item. |
| 86 | 15) The rates shall be increased by 30 % for bearing piles upto depth of 10 m and for further increaseed in depth by 5 m each it shall be increased by another 10 5 .These rates are applicable where raft is not feasible for pile foundation sufate resistant cement shall only be used.Single pile for the column is not permitted Group of piles shall be designed with pile cap for each column of ESR. |
| 87 | 16) Theserates are applicable for staging height of 12 m .These rates shall be increased or decreased for per meter variation in the staging height as below. 12 to 16 M staging 2% per m 16 to 20 M staging3% per m20 M and above4% per m |
| 88 | 17) Following rates are for seismic zone-III , for Seismic zone-IVthese rates shall be increased by 5%, and for Seismic zone-II these rates shall be decreased by 5% |
| 89 | RCC ESR 25000 Lit cap. & staging height 9 M |
| 90 | Item No. 2 - Providing and supplying ISI standard CI double flanged pipes excluding GST levied by GOI & GOM in all respect including railway freight, insurance, unloading from railway wagon, loading into truck transport to stores, unloading etc. complete as directed by Engineer-in-charge |
| 91 | 100 mm dia CIDF Pipes |
| 92 | Item No. 3 - Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete |
| 93 | 100 mm dia CIDF Sluice Valve |
| 94 | Item No. 4 - Providing and supplying ISI standard CI flanged / S& S specials including all statutory duties & taxes such as GST levied by GOI & GOM in all respect, railway freight, insurance, unloading from railway wagon, loading into truck transport to departmental store /site, unloading stacking etc. complete. |
| 95 | Diameter 80 mm to 300 mm |
| 96 | Subwork No. 5)DISTRIBUTION SYSTEM |
| 97 | Item No. 1 - Providing and supplying in standard lengths ISI mark rigid unplasticised PVC pipes suitable for portable water with solvent cement joints including cost of cojplers, as per IS specification no 4985 /1988 including all local and central taxes, transportation, freight charges, inspection charges, loading, unloading, conveyance to the departmental stores / site and stacking the same in closed shed duly protected from sun rays and rains including cost of jointing materia i.e. solvent cement, etc complete ( selffit type to be jointed with cement solvent.) Working Pressure 4Kg./Sqcm. |
| 98 | 110 mm dia |
| 99 | 90 mm dia |
| 100 | 75 mm dia |
| 101 | Item No. 2 - Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI and GOM in all respect including inspection charges, transportation to stores, etc. complete as per IS-1239/2004. |
| 102 | 80 mm dia G.I pipe |
| 103 | Item No. 3 - Providing, Double Flanged sluice valve confirming for IS- 2806 / 14846 including warn gear arrangements as per test pressure, stainless steel spindle, caps, including all taxes, transportation etc. complete. |
| 104 | 80 mm dia |
| 105 | 100 mm dia |
| 106 | Item No. 4 - Providing and supplying PVC / GI Pipes ( 10% of pipes cost) |
| 107 | Item No. 5 - Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
| 108 | Item No. 6 - Lowering laying and jointing with P.V.C. pipes and spcials of following diameter including cost of conveyance from stores to site of work including cost of all labour, material except cement solvent, rubber ring, giving satisfactory hydraulic testing as per IS code, etc. complete. (with cement solvent joint / ring fit joint), Working Pressure 4 Kg./Sqm |
| 109 | 110 mm Dia |
| 110 | 90 mm Dia |
| 111 | 75 mm Dia |
| 112 | Item No. 7 - Lowering, laying and jointing G. I. pipes and specials of following class and diameter including conveyance from stores to site of works, all labour, giving satisfactory hydraulic test, etc. complete either underground or in vertical position, as directed by Engineer-in-charge. |
| 113 | 80 mm dia G.I pipe |
| 114 | Item No. 8 - Hydraulic testing of PVC pipe line to specified pressure including cost of all materials and labour and water for testing for specified length including cutting, placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting, if necessary and reinstating to original position |
| 115 | 110 mm dia PVC 4 Kg/cm2 pipe |
| 116 | 90 mm dia PVC 4 Kg/cm2 pipe |
| 117 | 75 mm dia PVC 4 Kg/cm2 pipe |
| 118 | Item No. 9 - Hydraulic testing of G.I. pipe line to specified pressure including cost of all materials and labour and water for testing for specified length including cutting, placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting, if necessary and reinstating to original position |
| 119 | 80 mm dia G.I. Pipe Medium Class |
| 120 | Item No. 10 - Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of valves.) |
| 121 | 80 mm dia CIDF Sluice Valve |
| 122 | 100 mm dia CIDF Sluice Valve |
| 123 | Item No. 11 - Providing and fixing C.I. Road box including loading unloading and carting to site of work including all necessary excavattion in all types of strata and fixing in murum packing etc. complete. |
| 124 | 100 x 225 MM (20 KG/ NO) |
| 125 | Item No. 12 - Refilling the trenches with available excavated stuff with soft material first over pipelines and then hard material in 15cm layers with all leads and lifts including consolidation surcharging etc complete. |
| 126 | Item No. 13 - Providing and laying in situ 1:2:4 (M-150) grade of C.C. of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including dewatering from work, compacting and curing, finishing etc. complete with initial lift of 1.50m below / above ground level. |
| 127 | Subwork No. 6)TRIAL RUN |
| 128 | Item No. 1 - Commisioning runing and maintaining the scheme to quantities rated capacity including manning necessary personal such as operatoter,valvemen etc as per requirnments of the schemes and who should also administerde chemecal dose for a period of one month together with training a personal paired by MJP/Local body and handing over the scheme to local body after completion of the above period as directed by engineeres incharge. |
| 129 | a) For single village without WTP |
AI Tender Summary
Tender Timeline
Jan 21, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedJan 29, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJan 31, 2022
Bid Opening Date
Technical bids will be opened and evaluated.