R / R Damages On Pidiyadhar To Ser Tandula Road Km. 0 / 00 To 7 / 00 . ( Sh C / O Wing Walls To Slab Culvert At Rd. 4 / 097 To 4 / 100 ( L.H.S ) , 4 / 105 To 4 / 111 ( R.H.S ) And Wing Wall At Rd. 4 / 105 To 4 / 108 Catch Pit Side ) R / R Damages O
Tender Overview
Project Description
R / R Damages On Pidiyadhar To Ser Tandula Road Km. 0 / 00 To 7 / 00 . ( Sh C / O Wing Walls To Slab Culvert At Rd. 4 / 097 To 4 / 100 ( L.H.S ) , 4 / 105 To 4 / 111 ( R.H.S ) And Wing Wall At Rd. 4 / 105 To 4 / 108 Catch Pit Side ) R / R Damages On Pidiyadhar To Ser Tandula Road Km. 0 / 00 To 7 / 00 . ( Sh C / O Wing Walls To Slab Culvert At Rd. 4 / 097 To 4 / 100 ( L.H.S ) , 4 / 105 To 4 / 111 ( R.H.S ) And Wing Wall At Rd. 4 / 105 To 4 / 108 Catch Pit Side )
BOQ
| Sl. No. | Item Description |
| 1 | Excavation in foundation,trenches etc. in earth work in all heights and depths in all kinds of soil, including saturated soil comprising of pick work,jumper work and blasting work both in soft and hard rock with chiselling and wedging out of rock (whereblastingis prohibited) and their intermediate classification of soil including dewatering where ever required,setting out to required lines,levels as shown on the drawings and as directed by the Engineer-in-Charge at site, according to the HPPWD specification of 1990-Volume-I, and shorting out useful and un-useful materials and stacking the same in all leads,lifts and transportations of the usefull materials for filling in roadways embankments for grades improvements and levelling to required grades and then disposing of surplus excavated earth in acquired width of road on or approved dumping sites through all modes of transpsportation including head load animal load or mechanical means alongwith its levelling fine dressing and all labour, mechnieries materials,tools,equipments and incidental necessary to complete the work by mechanized means and labouor(if any required).All useful materials such as stone single, aggregate and slates shall be sorted out and stacked along road side to the maximuim possible extends in all leads,lifts through all modes of transportation and all others incidental charges any loss to the public and private properities during the course of execution and disposal of serviceable and un-serviceable materials shall be the absolute responsibility of the contractors and shall have to be duly compensated by him in all respectincluding haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. |
| 2 | Excavation in foundation,trenches etc. in earth work in all heights and depths in all kinds of soil, including saturated soil comprising of pick work,jumper work and blasting work both in soft and hard rock with chiselling and wedging out of rock (whereblastingis prohibited) and their intermediate classification of soil including dewatering where ever required,setting out to required lines,levels as shown on the drawings and as directed by the Engineer-in-Charge at site, according to the HPPWD specification of 1990-Volume-I, and shorting out useful and un-useful materials and stacking the same in all leads,lifts and transportations of the usefull materials for filling in roadways embankments for grades improvements and levelling to required grades and then disposing of surplus excavated earth in acquired width of road on or approved dumping sites through all modes of transpsportation including head load animal load or mechanical means alongwith its levelling fine dressing and all labour, mechnieries materials,tools,equipments and incidental necessary to complete the work by mechanized means and labouor(if any required).All useful materials such as stone single, aggregate and slates shall be sorted out and stacked along road side to the maximuim possible extends in all leads,lifts through all modes of transportation and all others incidental charges any loss to the public and private properities during the course of execution and disposal of serviceable and un-serviceable materials shall be the absolute responsibility of the contractors and shall have to be duly compensated by him in all respectincluding haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. |
| 3 | Providing concrete for plain/reinforced concrete in open foundations complete as per drqsings and specification clause 802,803,1202 & 1203(PCC Grade M10 Nominal mix 1:3:6) 40MM (one cement :three sand :six graded stone aggregate forty milimetre nominal size)and curing complete includingcost of form work and hauling/ carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer- in-Charge . |
| 4 | Providing back filling with granular material behind abutment, wing wall and return wall complete as per drawing and technical specification clause 1204.3.8. and curring complet including the cost of form work and haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. |
| 5 | Providing weep holes in brick masonry/stone masonry plain cement concrete , wing wall, retun wall with 100 mm ( One hundred milimetre) dia P.V.C. pipe extended thorugh the full width of the structure with slop of one in vertical and Twenty in horizontal towards drawing face complete as per drawing and technical specification of Ministery of rural Development for rural roads August 2004 (Two thousand four) clause614,709,1204.3.7 (Six hundred fourteen, Seven hundred nine, One thousand two hundred four pointthree point seven ) and curring complete including the cost of form workand haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents