}

Redevelopment Of Two Parks Within Abd Area Of Faridabad Smart City Limited With Defect Liability Period Of Two Years And Maintenance Of Five Years In Faridabad Under Smart City Mission Redevelopment Of Two Parks Within Abd Area Of Faridabad Smart City Lim, faridabad-Haryana

Urban Local Bodies has published Redevelopment Of Two Parks Within Abd Area Of Faridabad Smart City Limited With Defect Liability Period Of Two Years And Maintenance Of Five Years In Faridabad Under Smart City Mission Redevelopment Of Two Parks Within Abd Area Of Faridabad Smart City Lim. Submission Date for this Tender is 24-02-2022. Gardening Tenders in faridabad Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

30773617
Corrigendum : Redevelopment Of Two Parks Within Abd Area Of Faridabad Smart City Limited With Defect Liability Period Of Two Years And Maintenance Of Five Years In Faridabad Under Smart City Mission Redevelopment Of Two Parks Within Abd Area Of Faridabad Smart City Lim
Open Tender
Indian
Haryana
faridabad
24-02-2022

Tender Details

Redevelopment Of Two Parks Within Abd Area Of Faridabad Smart City Limited With Defect Liability Period Of Two Years And Maintenance Of Five Years In Faridabad Under Smart City Mission Redevelopment Of Two Parks Within Abd Area Of Faridabad Smart City Limited With Defect Liability Period Of Two Years And Maintenance Of Five Years In Faridabad Haryana India Under Smart City Mission

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 04-Feb-2022 Corrigendum1 Date 10-02-2022
2 11-Feb-2022 CorrigendumII Date 17-02-2022
3 18-Feb-2022 CorrigendumIII Date 24-02-2022
4 22-Feb-2022 Corrigendum Other 24-02-2022
5 24-Feb-2022 CorrigendumIV Date 02-03-2022

Key Value

Document Fees
INR 1000 /-
EMD
INR 1085000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:Redevelopment of Two Parks within ABD area of Faridabad Smart City Limited with Defect Liability Period of Two Years and Maintenance of Five Years in Faridabad (Haryana, India) under Smart City Mission (SCM)”
Sl. No. Item Description
1Laying and Jointing PVC Pipe. Heading
2Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment).
3Applying and finishing the top surface of concrete, in accordance with broadcasting of color hardener at the rate of 2.7 kgs/sq mtr. Floating the surface with different types of floaters, application of Release Agent at the rate of 0.113 kg/sq.mtr stamping the concrete with stamping tools, cleaning the surface with water and application of acrylic based Sealer for finishing.)
4Suppplying and applying artistic paintings with all tools and tackles with scaffolding etc.complete as per instruction of Engineer-in-charge.
5Supplying, filling, spreading & leveling coarse sand of size range 1.5 mm to 2 mm in recharge pit, in required thickness over gravel layer, for all leads & lifts, all complete as per direction of Engineer -incharge.
6Load bearing civil structure complete with 6mx4m reading room & (15mx10 m) Green Room with foundation,structure,finishing,water proofing,door/windowframe ,shutter with fitings ,glass,IPS flooringetc. as per instruction of Engineer-in-charge.
7Providing and fixing of external wall system on Light gauge steel frame work with . Outer face having 6mm thick heavy duty fiber cement board fixed on 9mm thick heavy duty fiber cement board confirming to IS 14862:2000, category IV type A (High pressure steam cured) as per standard sizes fixed with self-drilling / taping screws / fasteners @ 60cm c/c of approved make. A grove of 2 mm to 3mm shall be maintained and groves shall be sealed with silicon based sealant. The board shall be fixed in a staggered pattern.Screws shall be of counter sunk rib head of 1.60mm to 4 mm thick of 8 to 10 gauge of length varying from 25 to 45 mm and internal face 12.5mm thick gypsum plaster board fixed on 8mm thick fiber cement board confirming to IS 14862:2000 of category III type B (High pressure steam cured) as per standard sizes fixed with self-drilling / taping screws / fasteners @ 60cm c/c of approved make, proper taping and jointing to be done using fiber mesh tape and epoxy and acrylic based jointing compound for seamless finish.(cost of frame work to be paid for separately). Outer face: Outer face having 6mm thick fiber cement board fixed on 9mm thick fiber cement board, Type A,as per IS:14862:2000 (high pressure steam cured) Inner Face :- 12.5 mm thick gypsum plaster board conformingto IS 2095:2011 fixed on 8 mm thick fibre cement board confirming to IS:14862:2000 of type B (High pressure
8Precast Concrete Reinforced straight bench with back of size - 60"x24", front height-18" and thickness-4", any Colour as per approval, manufactured by using M-40 Grade of Concrete & reinforced suitable to prevent damage during handling, transportation, erection & long use. All parts are joined together with galvanized nuts & bolts of suitable size.
9Preparation of mounds of various size and shape by available excavated / supplied earth in layers not exceeding 20 cm in depth, breaking clods, watering of each layer, dressing etc., lead upto 50 meter and lift upto 1.5 m complete as per direction of Officer-in-charge.
10SUPPLY ,INSTALLATION 6.MTR MINI HIGHMAST POLE WITH LUMINAIRE. POLE OF PU PAINT OR POWDER COATED OF SIZE 70X130X3MM WITH PCD 220X220X12 MM BASE PLATE SIZE 220X220X12MM WITH ROUND ARM FOR 4 NOS. LIGHT FIXTUREWITH 20X750 MM FOUNDATION BOLT WITH 3 NUT 3 WASHER AND LUMINIURY OF 70 WATT EACHWITHMCBAND POLYCABE CABLEAS PER TECHNICAL SPECIFICATION
11Supplying and erecting flood light luminaries suitable for 70WH.P.S.V. lamp complete with accessories on provided bracket as per specification no. FG-ODF/GSL
12Making M- 20 grade reinforced cement concrete foundation by considering the safe soil bearing capacity at site as 10 T/sq.m at 1.5 m depth including supply of steel, concrete, excavation and fixing provided nut bolts with the help of template, duly plastered as per design complete (for 9m & 10m high octagonal /Hexagonal/Round bracket/conical GI pole).
13Supply, installation, testing and commissioning of POST TOP Luminaire:Outdoor type, Integral LED lamp, Decorative, Direct lighting type, Non corrosive Aluminium housing, Housing Colour: Black/Grey,Suitable for mounting on pole. Luminaire integrated and prewired from terminal connector for incoming supply with LED lamp . Low power loss LED driver for 36 W LED,Operated on 240V, 50Hz AC supply,Typical view of Luminaire.
14Supplying & erecting T8 LED 20W tube lightfitting (4 feet) with aluminium housing, heatsink, integrated HF electronic driver complete(including lamp).
15Supply, installation, testing and commissioning of Post Top Light Pole with feeder pillars for proper distribution of power to lights along the road. Pole should be made of GI of height 5 metre with powder coating minimum thickness of 50 µ. The LED strlight luminaire shall be such that it provides adequate lighting.
16Supply, Install and fixing of linear wall washer & complete with all acceessories integrated with 12 w LED and High pressure aluminium die-cast and alloy body, anodised surface. with Clear lines, and High efficiency PMMA optical lens with tempered glass diffuser. Adjustable mounting bracket, simple installation. Silicone rubber leakproof structure design to ensure the high level of IP rating(IP 65). Luminaire provided with external driver, low voltage at 24Vdc assures safety. (Dimension : 500 x 25 x 75mm approx.)
17Supply, installation, testing and commissioning of circular BOLLARD: Outdoor type,Integral LED lamp, Decorative, Luminaire: Non corrosive Aluminium, Aluminium plate for bolting onto foundation.Robust Design, High Luminous efficiency at reduce wattage, Cable entry for main supply cable. Earthing connection provision shall be provided. Minimum protection of IP 65. Operate on 240V, 50 Hz AC supply. Earthing term.inals for earth connection, Rating: 8W LED. Height 900 mm
18Providing and fixing of In ground luminaire with asymmetrical beam angle of 35 degree. Luminaire made up of die-casting grey powder coated aluminium, corrosion resistance with low copper content. Hard chromeplated stainless steel 316 grade front ring. Molding shaped seal gasket. Stainless steel screws. Step tempered glass of 10mm thickness with static load resistance. Optical reector efciency = 90% • Luminaire hard wired with 3 x 1.0mm2 cable of 0.5mts length. Supplied with mounting sleeve for preparing recessed opening in ground. Integral power supply. Earth connection. Safety class I. Protection class IP67. Mechanical resistance IK09 & IK10. Conformity mark. Suitable for operation on 240V, 50Hz single phase ac supply. Dimension : 173 mm dia x 128mm integrated with 14 w LED
19Exhaust fan
20OPEN AIR GYM
21"Supply and Fixng of Seated Chest Press: All products must tested and certified to meet EN16630 safety standards with GS test mark. The EN16630 certificates must be issued by a reputed notified International Certifying Body such as IPEMA, TUV, CPSC, or SGS only. The GS mark-EN 16630 certificates must be in the name of the supplier by themselves or through their authorised dealers or contractors. Upright structural posts of height 1.88 m is to be schedule HOT DIP Galvanized steel with a 114mm O.D. and 2.2mm (wall) thickness of the tubing. Two pair of U-Shaped Bars of 1.02 m and Dia 40 mm while the handles are placed at a spacing of 698 mm fabricated from 40 O.D. galvanized steel pipes. The poles are welded on to a base plate made from steel with 114mm inner diameter. Bearings : Maintenance-free ball bearings. Equipment which have sway and moving parts, must have built in safety limiters that prevent unwanted and excessive movement, which can cause injuries. The limiters must be in accordance with EN16630 safety norms. Scope of delivery : 1 completely pre- assembled equipment modules. Maintenance : Maintain according to EN16630 and the maintenance guide. The rates are to be including GST and inclusive of supply and installation at site, transportation charges, as per the directions of the engineer-in-charge of work.APPROX.EQUIPMENT DIMENSIONS: 1.82 m x 0.69 m x 1.88 m"
22"Supply and Fixng of Big Shoulder Wheel: All products must tested and certified to meet EN16630 safety standards with GS test mark. The EN16630 certificates must be issued by a reputed notified International Certifying Body such as IPEMA, TUV, CPSC, or SGS only. The GS mark-EN 16630 certificates must be in the name of the supplier by themselves or through their authorised dealers or contractors.Upright structural posts of height 1.47 m is to be schedule HOT DIP Galvanized steel with a 114mm O.D. and 2.2mm (wall) thickness of the tubing. Circular Handrail of Dia 0.69 m and Dia 42 mm fabricated from 42 O.D. galvanized steel pipes. The poles are welded on to a base plate made from steel with 114mm inner diameter. Bearings : Maintenance-free ball bearings. Equipment which have sway and moving parts, must have built in safety limiters that prevent unwanted and excessive movement, which can cause injuries. The limiters must be in accordance with EN16630 safety norms. Scope of delivery : 1 completely pre- assembled equipment modules. Maintenance : Maintain according to EN16630 and the maintenance guide. The rates are to be including GST and inclusive of supply and installation at site, transportation charges, as per the directions of the engineer-in-charge of work.APPROX.EQUIPMENT DIMENSIONS: 0.69 m x 0.61 m x 1.94 m"
23"Supply and Fixng of Self Weighted Rower: All products must tested and certified to meet EN16630 safety standards with GS test mark. The EN16630 certificates must be issued by a reputed notified International Certifying Body such as IPEMA, TUV, CPSC, or SGS only. The GS mark-EN 16630 certificates must be in the name of the supplier by themselves or through their authorised dealers or contractors. Horizontal bars of length 1.08 m is to be schedule HOT DIP Galvanized steel with a 114mm O.D. and 2.2mm (wall) thickness of the tubing. Handle Bars of 0.74 m and Dia 38 mm fabricated from 40 O.D. galvanized steel pipes. The poles are welded on to a base plate made from steel with 114mm inner diameter. Bearings : Maintenance-free ball bearings. Equipment which have sway and moving parts, must have built in safety limiters that prevent unwanted and excessive movement, which can cause injuries. The limiters must be in accordance with EN16630 safety norms. Scope of delivery : 1 completely pre- assembled equipment modules. Maintenance : Maintain according to EN16630 and the maintenance guide. The rates are to be including GST and inclusive of supply and installation at site, transportation charges, as per the directions of the engineer-in-charge of work. APPROX. EQUIPMENT DIMENSIONS: 1.26 m x 0.80 m x 1.59 m"
24"Supply and Fixng of Leg Stretch: All products must tested and certified to meet EN16630 safety standards with GS test mark. The EN16630 certificates must be issued by a reputed notified International Certifying Body such as IPEMA, TUV, CPSC, or SGS only. The GS mark-EN 16630 certificates must be in the name of the supplier by themselves or through their authorised dealers or contractors. Upright structural posts of height 1.10 m is to be schedule HOT DIP Galvanized steel with a 114mm O.D. and 2.2mm (wall) thickness of the tubing. Handrail rails of Dia 32 m. The poles are welded on to a base plate made from steel with 114mm inner diameter. Welded. Bearings : Maintenance-free ball bearings. Equipment which have sway and moving parts, must have built in safety limiters that prevent unwanted and excessive movement, which can cause injuries. The limiters must be in accordance with EN16630 safety norms. Scope of delivery : 1 completely pre- assembled equipment modules. Maintenance : Maintain according to EN16630 and the maintenance guide. The rates are to be including GST and inclusive of supply and installation at site, transportation charges, as per the directions of the engineer-in-charge of work. APPROX. EQUIPMENT DIMENSIONS: 0.93 m x 0.81 m x 1.13 m"
25"Supply and Fixng of Pull Down Challenger: All products must tested and certified to meet EN16630 safety standards with GS test mark. The EN16630 certificates must be issued by a reputed notified International Certifying Body such as IPEMA, TUV, CPSC, or SGS only. The GS mark-EN 16630 certificates must be in the name of the supplier by themselves or through their authorised dealers or contractors. Upright structural posts of height 1.88 m is to be schedule HOT DIP Galvanized steel with a 114mm O.D. and 2.2mm (wall) thickness of the tubing. Two pair of U-Shaped Pull down Bars 806 mm x 700 mm and Dia 40 mm are spaced at 630 mm fabricated from 40 O.D. galvanized steel pipes. The poles are welded on to a base plate made from steel with 114mm inner diameter. Bearings : Maintenance-free ball bearings. Equipment which have sway and moving parts, must have built in safety limiters that prevent unwanted and excessive movement, which can cause injuries. The limiters must be in accordance with EN16630 safety norms. Scope of delivery : 1 completely pre- assembled equipment modules. Maintenance : Maintain according to EN16630 and the maintenance guide. The rates are to be including GST and inclusive of supply and installation at site, transportation charges, as per the directions of the engineer-in-charge of work.APPROX.EQUIPMENT DIMENSIONS: 2.30 m x 0.70 m x 1.88 m"
26"Supply and Fixng of Health Walker: All products must tested and certified to meet EN16630 safety standards with GS test mark. The EN16630 certificates must be issued by a reputed notified International Certifying Body such as IPEMA, TUV, CPSC, or SGS only. The GS mark-EN 16630 certificates must be in the name of the supplier by themselves or through their authorised dealers or contractors. Upright structural posts of height 1.25 m is to be schedule HOT DIP Galvanized steel with a 114mm O.D. and 2.2mm (wall) thickness of the tubing. Two numbers of Foot Rest of size 361 mm x 161 mm are attached to the Standing Bars 957mm x 60 mm fabricated from 60 O.D. galvanized steel pipes. The poles are welded on to a base plate made from steel with 114mm inner diameter. Bearings : Maintenance-free ball bearings. Equipment which have sway and moving parts, must have built in safety limiters that prevent unwanted and excessive movement, which can cause injuries. The limiters must be in accordance with EN16630 safety norms. Scope of delivery : 1 completely pre- assembled equipment modules. Maintenance : Maintain according to EN16630 and the maintenance guide. The rates are to be including GST and inclusive of supply and installation at site, transportation charges, as per the directions of the engineer-in-charge of work. APPROX. EQUIPMENT DIMENSIONS: 1.18 m x 0.553 m x 1.25 m"
27"Supply and Fixng of Rider: All products must tested and certified to meet EN16630 safety standards with GS test mark. The EN16630 certificates must be issued by a reputed notified International Certifying Body such as IPEMA, TUV, CPSC, or SGS only. The GS mark-EN 16630 certificates must be in the name of the supplier by themselves or through their authorised dealers or contractors. Upright structural posts of height 1.3 m is to be schedule HOT DIP Galvanized steel with a 114mm O.D. and 2.2mm (wall) thickness of the tubing. A single seat of size 330 mm x 250 mm fixed to the top of the vertical post and two Pedals & Bars of size 145 mm x 50 mm and Dia 38 mm fabricated from 40 O.D. galvanized steel pipes. The poles are welded on to a base plate made from steel with 114mm inner diameter. Bearings : Maintenance-free ball bearings. Equipment which have sway and moving parts, must have built in safety limiters that prevent unwanted and excessive movement, which can cause injuries. The limiters must be in accordance with EN16630 safety norms. Scope of delivery : 1 completely pre- assembled equipment modules. Maintenance : Maintain according to EN16630 and the maintenance guide. The rates are to be including GST and inclusive of supply and installation at site, transportation charges, as per the directions of the engineer-in-charge of work. APPROX. EQUIPMENT DIMENSIONS: 0.91 m x 0.65 m x 1.27 m"
28"Supply and Fixng of Sit Up Station: All products must tested and certified to meet EN16630 safety standards with GS test mark. The EN16630 certificates must be issued by a reputed notified International Certifying Body such as IPEMA, TUV, CPSC, or SGS only. The GS mark-EN 16630 certificates must be in the name of the supplier by themselves or through their authorised dealers or contractors.Upright structural posts of height 0.63 m is to be schedule HOT DIP Galvanized steel with a 114mm O.D. and 2.2mm (wall) thickness of the tubing. Two J shaped Bars of 1.07 m and Dia 48 mm. The poles are welded on to a base plate made from steel with 114mm inner diameter. Bearings : Maintenance-free ball bearings. Equipment which have sway and moving parts, must have built in safety limiters that prevent unwanted and excessive movement, which can cause injuries. The limiters must be in accordance with EN16630 safety norms. Scope of delivery : 1 completely pre- assembled equipment modules. Maintenance : Maintain according to EN16630 and the maintenance guide. The rates are to be including GST and inclusive of supply and installation at site, transportation charges, as per the directions of the engineer-in-charge of work. APPROX. EQUIPMENT DIMENSIONS: 1.48 m x 1.21 m x 0.63 m"
29"Supply and Fixng of Double Air Skier: All products must tested and certified to meet EN16630 safety standards with GS test mark. The EN16630 certificates must be issued by a reputed notified International Certifying Body such as IPEMA, TUV, CPSC, or SGS only. The GS mark-EN 16630 certificates must be in the name of the supplier by themselves or through their authorised dealers or contractors. Upright structural posts of height 1.25 m is to be schedule HOT DIP Galvanized steel with a 114mm O.D. and 2.2mm (wall) thickness of the tubing. Foot rest of size 365 mm x 164 mm and Standing Bars of length 1640 mm x 40 mm fabricated from 40 O.D. galvanized steel pipes. Lower part of Support Handrails of size 0.8 m high and Dia 47 mm and Upper part of Support Handrails of size 0.51 m high and Dia 32 mm fabricated from 47 mm O.D. and 32 mm O.D. The poles are welded on to a base plate made from steel with 114mm inner diameter. Bearings : Maintenance-free sealed ball bearings. Equipment which have sway and moving parts, must have built in safety limiters that prevent unwanted and excessive movement, which can cause injuries. The limiters must be in accordance with EN16630 safety norms. Scope of delivery : 1 completely pre- assembled equipment modules. Maintenance : Maintain according to EN16630 and the maintenance guide. The rates are to be including GST and inclusive of supply and installation at site, transportation charges, as per the directions of the engineer-in-charge of work.APPROX. EQUIPMENT DIMENSIONS: 1.61 m x 0.50 m x 1.50 m"
30"Supply and Fixng of Mini Ski: All products must tested and certified to meet EN16630 safety standards with GS test mark. The EN16630 certificates must be issued by a reputed notified International Certifying Body such as IPEMA, TUV, CPSC, or SGS only. The GS mark-EN 16630 certificates must be in the name of the supplier by themselves or through their authorised dealers or contractors. Upright structural posts of height 1.40 m is to be schedule HOT DIP Galvanized steel with a 114mm O.D. and 2.2mm (wall) thickness of the tubing. The Standing Bars 991 mm and Dia 60 mm fabricated from 40 O.D. galvanized steel pipes Upper part of Support Handrails of size 1.04 m high and Dia 38 mm fabricated from 40mm O.D. and 32 mm O.D. galvanized steel pipes. The poles are welded on to a base plate made from steel with 114mm inner diameter. Bearings : Maintenance-free ball bearings. Equipment which have sway and moving parts, must have built in safety limiters that prevent unwanted and excessive movement, which can cause injuries. The limiters must be in accordance with EN16630 safety norms. Scope of delivery : 1 completely pre- assembled equipment modules. Maintenance : Maintain according to EN16630 and the maintenance guide. The rates are to be including GST and inclusive of supply and installation at site, transportation charges, as per the directions of the engineer-in-charge of work. APPROX. EQUIPMENT DIMENSIONS: 1.07 m x 0.78 m x 1.40 m"
31"Supply and Fixng of Waist Twsiter: All products must tested and certified to meet EN16630 safety standards with GS test mark. The EN16630 certificates must be issued by a reputed notified International Certifying Body such as IPEMA, TUV, CPSC, or SGS only. The GS mark-EN 16630 certificates must be in the name of the supplier by themselves or through their authorised dealers or contractors. Upright structural posts of height 1.35 m is to be schedule HOT DIP Galvanized steel with a 114mm O.D. and 2.2mm (wall) thickness of the tubing. Circular Handrail Dia 42 mm fabricated from 42 O.D. galvanized steel pipes. The poles are welded on to a base plate made from steel with 114mm inner diameter. Bearings : Maintenance-free ball bearings. Equipment which have sway and moving parts, must have built in safety limiters that prevent unwanted and excessive movement, which can cause injuries. The limiters must be in accordance with EN16630 safety norms. Scope of delivery : 1 completely pre- assembled equipment modules. Maintenance : Maintain according to EN16630 and the maintenance guide. The rates are to be including GST and inclusive of supply and installation at site, transportation charges, as per the directions of the engineer-in-charge of work. APPROX. Equipment Dimensions: 1.44 m x 1.29 m x 1.35 m"
32"Supply and Fixng of Squat Pushing: All products must tested and certified to meet EN16630 safety standards with GS test mark. The EN16630 certificates must be issued by a reputed notified International Certifying Body such as IPEMA, TUV, CPSC, or SGS only. The GS mark-EN 16630 certificates must be in the name of the supplier by themselves or through their authorised dealers or contractors. Vertical bars height of 1.50 m is to be schedule HOT DIP Galvanized steel with a 114mm O.D. and 2.2mm (wall) thickness of the tubing. L shaped bars of 960 mm x 600 mm carrying two seats of 0.34 m x 0.34 m fabricated from 40 O.D. galvanized steel pipes. The poles are welded on to a base plate made from steel with 114mm inner diameter. Bearings : Maintenance-free ball bearings. Equipment which have sway and moving parts, must have built in safety limiters that prevent unwanted and excessive movement, which can cause injuries. The limiters must be in accordance with EN16630 safety norms. Scope of delivery : 1 completely pre- assembled equipment modules. Maintenance : Maintain according to EN16630 and the maintenance guide. The rates are to be including GST and inclusive of supply and installation at site, transportation charges, as per the directions of the engineer-in-charge of work. APPROX> EQUIPMENT DIMENSIONS: 1.93 m x 0.56 m x 1.70 m "
33Supply and Fixing of Push and Dip Station: All products must tested and certified to meet EN16630 safety standards with GS test mark. The EN16630 certificates must be issued by a reputed notified International Certifying Body such as IPEMA, TUV, CPSC, or SGS only. The GS mark-EN 16630 certificates must be in the name of the supplier by themselves or through their authorised dealers or contractors.Upright structural posts of height 1.56 m is to be schedule HOT DIP Galvanized steel with a 114mm O.D. and 2.2mm (wall) thickness of the tubing. Two sets of parallel bars of size 0.97 m x 0.55 m shall be an all-robotic welded unit, fabricated from 38 O.D. galvanized steel pipes. The poles are welded on to a base plate made from steel with 114mm inner diameter. Welded. Bearings : Maintenance-free ball bearings. Equipment which have sway and moving parts, must have built in safety limiters that prevent unwanted and excessive movement, which can cause injuries. The limiters must be in accordance with EN16630 safety norms. Scope of delivery : 1 completely pre- assembled equipment modules. Maintenance : Maintain according to EN16630 and the maintenance guide. The rates are to be including GST and inclusive of supply and installation at site, transportation charges, as per the directions of the engineer-in-charge of work. APPROX. EQUIPMENT DIMENSIONS: 1.95m x 0.55 m x 1.56 m
34"Supply and Fixng of Bicycle: All products must tested and certified to meet EN16630 safety standards with GS test mark. The EN16630 certificates must be issued by a reputed notified International Certifying Body such as IPEMA, TUV, CPSC, or SGS only. The GS mark-EN 16630 certificates must be in the name of the supplier by themselves or through their authorised dealers or contractors. Upright structural posts of height 1.33 m is to be schedule HOT DIP Galvanized steel with a 60 mm O.D. and 2.2mm (wall) thickness of the tubing. Two numbers of Pedal of size 113mm x 40mm & Rotating Disc of Dia 380 mm fabricated from 40 O.D. galvanized steel pipes. The poles are welded on to a base plate made from steel with 114mm inner diameter. Welded. Bearings : Maintenance-free ball bearings. Equipment which have sway and moving parts, must have built in safety limiters that prevent unwanted and excessive movement, which can cause injuries. The limiters must be in accordance with EN16630 safety norms. Scope of delivery : 1 completely pre- assembled equipment modules. Maintenance : Maintain according to EN16630 and the maintenance guide. The rates are to be including GST and inclusive of supply and installation at site, transportation charges, as per the directions of the engineer-in-charge of work. APPROX. EQUIPMENT DIMENSIONS: 1.11m x 0.51 m x 1.31 m"
35PLAY EQUIPMENT
36Providing and fixing Peak Climber. (Refer RFP for detail specification and reference image)
37Providing and fixing SpiderClimber.. (Refer RFP for detail specification and reference image)
38Providing and fixing puppy SEE SAW(Refer RFP for detail specification and reference image)
39Providing and fixing elephant SEE SAW.(Refer RFP for detail specification and reference image)
40Providing and fixing STANDARD SEE SAW.(Refer RFP for detail specification and reference image)
41Providing and fixing TODDLER SWING-2 seater. . (Refer RFP for detail specification and reference image)
42Providing and fixing FOUR SEATER ARC SWING.(Refer RFP for detail specification and reference image)
43Providing and fixingSPRING RIDER BIKE. (Refer RFP for detail specification and reference image)
44Providing and fixing2 SEATER SPRING RIDER aero.(Refer RFP for detail specification and reference image)
45Providing and fixing 5" HT.STRAIGHT OPEN SLIDE - THE MODULE IS MADE UP OF LLDP PLASTIC WHICH IS NON AGEING NON TOXIC AND HAVING UV RESISTANT.ALL WELDED JOINTS ARE PROPERLY GROUNDED AND COATED WITH AN EPOXY SEALANT FOR RUST RESISTANCE ALL SHARP EDGES AND CORNERS ARE PROPERLY GROUND BEFORE PAINTING. (Refer RFP for detail specification and reference image)
46Providing and fixing5" HT ROTO WAVE SLIDE.THE MODULE IS MADE UP OF LLDP PLASTIC WHICH IS NON AGEING NON TOXIC AND HAVING UV RESISTANT.(Refer RFP for detail specification and reference image)
47MULTIPURPOSE PLAY EQUIPMENT (2) (Refer RFP for detail specification and reference image)
48MULTIPURPOSE PLAY EQUIPMENT (3) . Providing and fixing in play/fitness equipment, including excavation of required size pit and fixing the each supporting leg / anchoring. ofinstrument in 1:11/2:3 grade concrete block of required size including curing etc. complete . Activities instruments will consist of fitness equipment such as tyre, climber, spring deck, seat on a single pole, hot dipped galvanized pipes and a slide made up of LLDPE -Safe Play Area 35" x 40"(approx..)-Age group 5-12 yrs (Refer RFP for detail specification and reference image)
49MULTIPURPOSE PLAY EQUIPMENT (4) . Providing and fixing in play equipment, including excavation of required size pit and fixing the each supporting leg / anchoring. of playing instrument in 1:11/2:3 grade concrete block of required size including curing etc. complete A-Multi activity play equipment with spiral slide 5" ht,wave slide 3" ht, a slide entry, an railing with cross n zero play system, a platform deck of 3"ht and 5"ht., a ladder of 5’ht.and a double swing, a lollipop climber and a pod climber.-Safe Play Area 35" x 20"(approx..)-Age group 3-12 yrs (Refer RFP for detail specification and reference image)
50MULTIPURPOSE PLAY EQUIPMENT (5) . Providing and fixing in play equipment, including excavation of required size pit and fixing the each supporting leg / anchoring. of playing instrument in 1:11/2:3 grade concrete block of required size including curing etc. complete A-Multi activity play equipmentS Loop climber and a bubble panel with spiral climber of 5" ht, spiral slide 5" ht with slide entry, 4" length tunnel, platform. ht 5" , a hexagonal canopy, a ladder of 5’ht.and a double wave slide of 5" ht.-Safe Play Area 30" x 30"(approx..)-Age group 5-12 yrs (Refer RFP for detail specification and reference image)
51MULTIPURPOSE PLAY EQUIPMENT (6) . Providing and fixing in play equipment, including excavation of required size pit and fixing the each supporting leg / anchoring. of playing instrument in 1:11/2:3 grade concrete block of required size including curing etc. complete A-Multi activity play equipment with straight tube slide of 5" ht, spiral slide 5" ht with slide entry, an railing with cross n zero play system, a platform deck with canopy, a ladder of 5’ht.and a double swing.-Safe Play Area 25" x 20"(approx..)- platform. ht 5"-Age group 5-12 yrs (Refer RFP for detail specification and reference image)
52MULTIPURPOSE PLAY EQUIPMENT (7) .Providing and fixing in play equipment, including excavation of required size pit and fixing the each supporting leg / anchoring. of playing instrument in 1:11/2:3 grade concrete block of required size including curing etc. complete A-Multi activity play equipment with straight tube slide of 3" ht, small wave slide 3" ht with slide entry, an railing with cross n zero play system, a platform deck with canopy, a staircase of 3’ht.and a net climber of 3’ ht.-Safe Play Area 22" x 22"(approx..)- platform. ht 3"-Age group 3-6 yrs (Refer RFP for detail specification and reference image)
53MULTIPURPOSE PLAY EQUIPMENT (8) . Providing and fixing in play equipment, including excavation of required size pit and fixing the each supporting leg / anchoring. of playing instrument in 1:11/2:3 grade concrete block of required size including curing etc. complete A-Multi activity play equipment with spiral slide 5" ht,wave slide 3" ht with a slide entry, an railing with cross n zero play system, an railing with abacus play system, a platform deck of 3"ht and 5"ht., an arch and frog canopy, a ladder of 3’ht., 2"ht bridge ladder with railing, 5" ht spiral climber , a character panel railing, and a double swing with one toddler seat belt.-Safe Play Area 30" x 25"(approx..)-Age group 3-12 yrs (Refer RFP for detail specification and reference image)
54MULTIPURPOSE PLAY EQUIPMENT (9) . Providing and fixing in play equipment, including excavation of required size pit and fixing the each supporting leg / anchoring. of playing instrument in 1:11/2:3 grade concrete block of required size including curing etc. complete A-Multi activity play equipment with straight tube slide of 3" ht, spiral slide 5" ht with slide entry, an railing with cross n zero play system, a platform deck of 3" ht and 5"ht, a ladder of 3’ht.and a double arch swing, 2" ht split level ladder, a bridge with railing and a bridge ladder climber, 5" ht rock climber.-Safe Play Area 33" x 30"(approx..)-Age group 5-12 yrs (Refer RFP for detail specification and reference image)
55MULTIPURPOSE PLAY EQUIPMENT (10) . Providing and fixing in play/fitness equipment, including excavation of required size pit and fixing the each supporting leg / anchoring. ofinstrument in 1:11/2:3 grade concrete block of required size including curing etc. complete . Activities instruments will consist of fitness equipment such as tyre, climber, spring deck, seat on a single pole, hot dipped galvanized pipes and a slide made up of LLDPE -Safe Play Area 37" x 20"(approx..)-Age group 3-12 yrs (Refer RFP for detail specification and reference image)
56MULTIPURPOSE PLAY EQUIPMENT (11) .Providing and fixing in play equipment, including excavation of required size pit and fixing the each supporting leg / anchoring. of playing instrument in 1:11/2:3 grade concrete block of required size including curing etc. complete A-Multi activity play equipment with straight tube slide of 5" ht with slide entry, spiral slide 5" ht , an railing with cross n zero play system, a platform deck , a hexagonal canopy with coupler, a ladder of 5’ht.and a 5"ht roller slide with slide entry,5"ht rock climber and a S Loop climber.-Safe Play Area 30" x 30"(approx.)- platform. ht 5"-Age group 5-12 yrs (Refer RFP for detail specification and reference image)
57MULTIPURPOSE PLAY EQUIPMENT (12) .Providing and fixing in play equipment, including excavation of required size pit and fixing the each supporting leg / anchoring. of playing instrument in 1:11/2:3 grade concrete block of required size including curing etc. complete A-Multi activity play equipment with a wave slide, a see saw, Cross and zero drum, Baby seater swing, and a ladder.-Safe Play Area 12.5" x 10"(approx.)--Age group 2-4 yrs (Refer RFP for detail specification and reference image)
58Providing and fixing Rocking boat. Safe Area - 10" x 7" approx. (Refer RFP for detail specification and reference image)
59OTHER RELATED WORKS
60Providing, laying and jointing following P.V.C. - U pipes with solvent cement joint for Non-pressure gravity drain and sewer applicationsincludingtestingofjoints,costofjointing materials etc. complete in all respect. [Conform to IS 15328:2003, solvent cement shall Conform to IS 14182]. SN-8 200 mm dia
61Supplying and laying of following size DWC /HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc. in the existing trench, complete as required.--160 mm dia (OD-160 mm & ID-135 mm nominal)
62Providing and fixing as per drawing /image STAINLESS STEEL DUSTBIN SERIES : ,600MM DIA X900MM HEIGHT with post hight-1200 and pipe dia 40mm SS- Grade304 (2 NOS. FORM A ONE SET) with provision of opening at the bottom of the bin.
6375MM thick backfilling for pitching including supplying of required materials and consolidation etc. complete with :- Morum
64HORTICULTURE WORK
65Providing and laying Neelgiri/Mexican grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with tools wooden (Dhurmos) and than rolling the surface with light roller make the surface smoothen and light waterning with sprinkler and maintenance for 30 days or more till the grass establish properly, as per direction of
66Providing & laying Selection no. 1 grass turf with earth 50mm to 60mm thickness on existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same, as per direction of Officer- incharge.
67Supply & Install Trees/ Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%concentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-ARECA PALMSUPARI,Minimum 5 canes per palm
68Supply & Install Trees/ Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%concentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.BAMBUSA VULGARISGOLDEN BAMBOO,Minimum 3.0/3.5m overall height,Minimum 40mm caliper,Multibranching at 2.0m from collar.
69Supply & Install Trees/ Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%concentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-CHORISIA SPECIOSA,FLOS SILK TREE,Minimum 2.0/2.5m overall height,Minimum 40mm caliper,Multibranching at 2.0m from collar
70Supply & Install Trees/ Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%concentration(5 ml/liter water) as inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%concentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-ERYTHRINA INDICA,Minimum 2.0/2.5m overall height,Multibranching at 2.5m from collar
71Supply & Install Trees/ Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%concentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-FICUS BENJAMINA,Minimum 2.0/2.5m overall height,Minimum 40mm caliper,Multibranching at 2.0m from collar
72Supply & Install Trees/ Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%concentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-GARDENIA LATIFOLIA,CAPE JASMINE,,Multibranching at 2.0m from collarMinimum 2.0/2.5m overall height,
73Supply & Install Trees/ Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%concentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-JACARANDA MIMOSIFOLIA,NEELA GULMOHAR,Minimum 2.0/2.5m overall height,Minimum 40mm caliper,Multibranching at 2.0m from collar
74Supply & Install Trees/ Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%concentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-MALALEUCA LEUCADENDRON,GOLDEN BOTTLE BRUSH,Minimum 2.0/2.5m overall height,Minimum 40mm caliper,Multibranching at 2.0m from collar
75Supply & Install Trees/ Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%concentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-PHOENIX PALM DATE 2.5m, overall ht, Min-100mm caliper, min. 8 fronds.
76Supply & Install Trees/ Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%concentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-PLUMERIA ALBA,FRANGIPANI,Minimum 3.0/3.5m overall height,Minimum 75mm caliper,Multibranching at 1.5m from collar
77Supply & Install Trees/ Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%concentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-PLUMERIA RUBRA,RED Champa,Minimum 3.0/3.5m overall height,Minimum 75mm caliper,Multibranching at 1.5m from collar
78Supply & Install Trees/ Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%concentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-WASHINGTONIA PALM,Min-1.5 mtr ht, min 100mm caliper, 5 fronds.
79Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-ACALYPHA HISIPIDA CAT TAIL,Minimum 600mm height@900mmc/c,Bushy, Multibranching, Flowering.
80Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-ACALYPHA W GREEN,Minimum 600mm height@750mmc/c,Bushy, Multibranching.
81Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-ACALYPHA W RED,Minimum 600mm height@750mmc/c,Bushy, Multibranching
82Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-ACALYPHA TRICOLUR,Minimum 600mm height@750mmc/c,Bushy, Multibranching
83Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-ALLAMANDA NERIFOLIA,Minimum 600mm height@900mmc/c,Bushy, Multibranching, Flowering
84Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-CESTRUM ELEGANS,Minimum 600mm height@900mmc/c,Bushy, Multibranching, Flowering
85Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-DURANTA TOPIARY,Minimum 1500mm height@1500mmc/c,Bushy, Multibranching
86Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-ERANTHEMUM BICOLOUR,Minimum 600mm height@750mmc/c,Bushy, Multibranching
87Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-ERANTHEMUM TRICOLOR,Minimum 600mm height@750mmc/c,Bushy, Multibranching
88Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-EUPHORBIA PULCHERRIMMA,Minimum 600mm height@900mmc/c,Bushy, Multibranching, Flowering
89Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-Euphorbia cotonifolia of height 60-75 cm height@900mmc/c,Bushy, Multibranching
90Supply & Install Shrubsinclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5% oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-FICUS BENJAMINA, Minimum 600mm height@900mmc/c,Bushy, Multibranching, Flowering
91Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting- Ficus nuda height Min 1200 mm @1500mm C/C., bushy with healthy branches and lush green foliage in big size HDPE bag
92Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-Ficus pandaheight Min 600 mm @900mm C/C., bushy, multibranching, flowering.
93Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-GOLDEN BOTTLE BRUSH well developed with fresh & healthy foliage 5 to 6 big ball 115 to 180 cm ht in 40 cm Cement Pot
94Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-HIBISCUS COOPERII,Minimum 600mm height@750mmc/c,Bushy, Multibranching, Flowering
95Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-HIBISCUS ROSA SINENSIS, Min height 600 mm @900mm C/C, Bushy, Multibranching, Flowering.
96Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-HIBISCUS SNOWFLAKE,Minimum 600mm height@900mmc/c, Bushy, Multibranching, Flowering
97Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-IXORA CHENENSIS,Minimum 600mm height@900mmc/c,Bushy, Multibranching, Flowering
98Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-JASMINUM HUMILE,Minimum 900mm height@750mmc/c, Bushy, Multibranching, Flowering
99Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-JATROPHA PAUNDARAEFOLIA,Minimum 600mm height@900mmc/c,Bushy, Multibranching, Flowering
100Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration (5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-LAGERSTROEMIA INDICA,Minimum 600mm height@ 900mm c/c, Bushy, Multibranching, Flowering
101Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration (5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-LAGERSTROEMIA INDICA CANDIDA,Minimum 600mm height@900mmc/c,Bushy, Multibranching, Flowering
102Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-PLUMBAGO CAPENSIS,Minimum 600mm height@750mmc/c,Bushy, Multibranching, Flowering
103Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-TECOMA GAUDI CHOWDI,Minimum 600mm height@900mmc/c,Bushy, Multibranching, Flowering
104Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-THEVETIA NERIFOLIA,Minimum 600mm height@900mmc/c,Bushy, Multibranching, Flowering
105Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration (5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-LATANIA LONTAROIDES, Minimum 1200mm height @300mmc/c,3 /4fronds
106Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-LIVISTONIA ROTUNDIFOLIA, Minimum750mm height @300mmc/c,3 /4fronds
107Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-CHEAMADOREA ELEGANS,Minimum 1500mm height @300mmc/c,3 /4fronds
108Supply & Install Shrubs / Palms inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-RAPHIS PALM,Minimum 600mm height @300mmc/c,3 /4fronds
109Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-PHILODENDRON XANADO,Minimum 300mm height @450mmc/c,Minimum 3 runners per plant
110Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-PHILODENRON WENDILANDI,Minimum 300mm height @450mmc/c,Minimum 3 runners per plant
111Supply & Install Climbers inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-BOUGAINVELLEA spp. Mix,Minimum 600mm height @2000mmc/c,Minimum 3 runners per plant
112Supply & Install Climbers inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-PETRA VOLUBLIS
113Supply & Install Climbers inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-QUISQUALIS INDICA,Minimum 600mm height @2000mmc/c,Minimum 3 runners per plant
114Supply & Install Climbers inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting-WHITE RAMBLING ROSES,Minimum 600mm height @2000mmc/c,Minimum 3 runners per plant
115Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-ASPARAGUS DENSIFLORUS,Minimum 150mm height @200mmc/c,
116Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-ASPARAGUS SPRENGERI,Minimum 150mm height @200mmc/c,Minimum 3 runners per plant
117Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-CUPERUS ALTERNIFOLIOUS,Minimum 150mm height @200mmc/c,Minimum 3 runners per plant
118Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-IRESINE,Minimum 150mm height @200mmc/c,Minimum 3 runners per plant
119Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-IPOMEA GOLDEANA,Minimum 300mm height @200mmc/c,Minimum 3 runners per plant
120Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-IPOMEA PURPUREA.Minimum 300mm height @200mmc/c,Minimum 3 runners per plant
121Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-OPHIOPOGON BLACK GRASS
122Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-PLUMBAGO CAPENSIS,Minimum 3 runners per plant
123Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.SYNGONIUM,Minimum 150mm height @200mmc/c,Minimum 3 runners per plant
124Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-SYNGONIUM EMERALD GREEN,Minimum 150mm height @200mmc/cMinimum 3 runners per plant
125Supply &Install ground covers/ Shade Minimum 150mm height @200mmc/cplants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pitwith Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-SYNGONIUM VAR,Minimum 3 runners per plant,
126Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-TRADESCANTIA FLUMENSIS,Minimum 150mm height @200mmc/c,Minimum 3 runners per plant
127Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-WEDELIA TRILOBATA,Minimum 3 runners per plant,Minimum 150mm height @200mmc/c
128Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-ZEBRINA PENDULA,Minimum 300mm height @250mmc/c,Minimum 3 runners per plant
129Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-ASPARAGUS MYERS,Minimum 150mm height @200mmc/c,Minimum 3 runners per plant
130Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-ASPARAGUS PLUMOSUS,Minimum 150mm height @200mmc/c,Minimum 3 runners per plant.
131Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-CRYPTANTHUS BIVITTATUS PINK STARLITE,Minimum 150mm height @200mmc/c,Minimum 3 runners per plant
132Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-DIEFFENBACHIA VAREITIES,Minimum 300mm height @450mmc/cMinimum 3 runners per plant
133Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-DRACENA FRAGRANS MASSANGEANA,Minimum 300mm height @600mmc/c,bushy
134Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-DRACENA MARGINATA TRICOLOUR,Minimum 300mm height @600mmc/c,Minimum 3 runners per plant
135Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-DRACENA SANDEREANA LUTEA,Minimum 300mm height @600mmc/c,Minimum 3 runners per plant
136Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-IPOMEA BLACK,Minimum 200mm height @200mmc/c,Minimum 3 runners per plant
137Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-OPHIOPOGON,Minimum 200mm height @200mmc/c,Minimum 3 runners per plant
138Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-SYNGONIUM BUTTERFLY,Minimum 200mm height @200mmc/c,Minimum 3 runners per plant
139Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-SYNGONIUM RED,Minimum 200mm height @200mmc/c,Minimum 3 runners per plant
140Supply &Install ground covers/ Shade plants inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-SYNGONIUM GOLDEN/WHITE,Minimum 200mm height @200mmc/c,Minimum 3 runners per plant
141Supply & Install plants to form hedge , inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-MURRAYA EXOTICA,Minimum 300mm height @300mmc/c,Bushy
142Supply & Install plants to form hedge inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-CLERODENRON MACROSIPHON,Minimum 250mm height @200mmc/c,Bushy
143Supply & Install plants to form hedge, inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.- CLERODENDRON INERME,Minimum 300 mm height @200mmc/c,Bushy
144Supply & Install plants to form hedge, inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-DURANTA GOLDEN Minimum 300mm height @200mmc/c,Bushy
145Supply & Install plants to form hedge, inclusive of: i).Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5%oncentration(5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-FICUS LONGISLAND Minimum 150mm height @200mmc/c,Bushy
146Supply & Install plants to form hedge, inclusive of: i) Removal of rubbish/ all construction debris /site trash, and surplus earth inclusive with all leads and lift. ii). Treat the pit with Chloropyriphos solution of 0.5% oncentration (5 ml/liter water) as required iv). Flooding the pit with water after making kiaries where required vi). Fertilise the pit by adding DAP 50gm, MOP 25 gm, 50gm neem oil cake and 50 gm stearameal per pit at the time of planting.-FICUS PANDA Minimum 300 mm height @200mmc/c,Bushy
1473 hand catchup (SG440FRP) with allshape without human figure
148Maintenance cost for civil works and gym equipments for 5 years:-DLP period for 1st year including 1st year maintenance
149Maintenance cost for civil works and gym equipments for 5 years:-DLP period for 2ndyear including 2nd year maintenance
150Maintenance cost for civil works and gym equipments for 5 years:- including 3rd year maintenance
151Maintenance cost for civil works and gym equipments for 5 years:- including 4th year maintenance
152Maintenance cost for civil works and gym equipments for 5 years:-including 5th year maintenance
153Maintenance cost for horticulture works for 5 years:-DLP period for 1styear including 1st year maintenance
154Maintenance cost for horticulture works for 5 years:-DLP period for 2nd year including 2nd year maintenance
155Maintenance cost for horticulture works for 5 years:- including 3rd year maintenance
156Maintenance cost for horticulture works for 5 years:-including 4th year maintenance
157Maintenance cost for horticulture works for 5 years:- including 5th year maintenance
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail