| 1 | Preperation of seat embankment or canals by 75 mm ploug and removing grass roots etc. As per sp. & direction of E/I.(7.1.1) |
| 2 | Earth work in excavation in canal by the hydraulic excavator as per designed section in all kinds of soil, soil mixed with kankar, pebbles and boulders upto 300 mm size and disposal of spoil upto 10 M with all liftsall complete as per approved design, specification and direction of E/I.(7.1.43.1) |
| 3 | Earth work in excavation in canal by the hydraulic excavator as per designed section in all kinds of soil, soil mixed with kankar, pebbles and boulders upto 300 mm size and disposal of spoil upto 500 M with all tipper including constructionand maintanance of haul road all complete as per approved design, specification and direction of E/I. (7.1.43.2) |
| 4 | Dewatering By 10 HP Diesel pump set…do …do of E/I. PM-29 |
| 5 | Fine dressing of the earthen embankment and turfing with 75 mm thick grass seeds, obtained within a lead of 150 M. Including the cost of watering the grass surface till it acquires greenners as per specification and direction of E/I.(6.1.24.1) |
| 6 | Extra for each lead of 150 M. Over initial kead of 150 M. As per specification and direction of E/I.(6.1.24.2) |
| 7 | Earth work in excavation in foundation in Ordinary soiland disposal of excavated earth as obtained (50 m away from the edge of trenches) with initial lead of 150 m and initial lift of 1.5 m as per specification and direction of E/I.(6.1.8) |
| 8 | Providing coarse clean sand filling in found. Trenches including ramming as well as royalty and all taxes etc. as per specification and direction of E/I. (5.1.10) |
| 9 | Providing R. R. stone masonry in CM (1:4) in Found. with giood quality of coarse sand of requsite F.M. Washed & screened and racking out joints, curing, scaffolding and its removel wehere ever required including royalty and all taxes etc. complete job as per specification and direction of E/I. (5.2.28) |
| 10 | Providing and laying P.C.C or R.C.CM - 15 with nominal mix ( 1:2:4) in vartious components of dam found and plinth with approved quality of 40 mmrequired grade , mechenicaly mixed, placed in foundation and compacted by vibrator including curing of 14 days all complete job as per specification and direction of E/I. (12.8.A) |
| 11 | Providing and laying P.C.C or R.C.CM - 15 with nominal mix ( 1:2:4) in vartious components of dam substructure (height up to 5 M)with approved quality of 40 mmrequired grade , mechenicaly mixed, placed in substructure and compacted by vibrator including curing of 14 days all complete job as per specification and direction of E/I. (13.5.A.p) |
| 12 | Providing random rubble stone masonry in C.M. (1:4) in superstructure with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M. 2 to 2.5 including cost of screening of materials, scafolding ,raking out joints to 20mm depth, curing, taxes and royalty all complete as per building specification and direction of E/l.(5.2.31) |
| 13 | Providing 25 mm thick cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/l.(5.7.12) |
| 14 | Labour for laying,fitting and fixingRCC NP2 250 mm pipe with coller in fine level and grade as well providing approved jointing materials and joints properly filled to make them water proof all complete as per building specification and direction of E/I.(7.6.1.2) |
| 15 | Supplying of NP2hume pipe with collar as per I.S.S. 458-1971 in fine level and grade-do- all complete as per building specification and direction of E/l.(M-300) |
| 16 | Supplying and laying boulder in rock toe heel trenches of the dam as per design drawing icluding cost of materials royalty and all taxes etc. But excluding the cost of carriage all complete as per specification and direction of E/I.(5.6.4) |
| 17 | Supplying and laying sand filter blanketing in horizontal portion of the dam as per design and drawingwith watering copacting including cost of sand , royalty all taxes etc. But excludng the cist of carriage all complete as per specification and direction of E/I.(5.6.1) |
| 18 | Carriage of materials cement 14 KM |
| 19 | Sand 10 KM |
| 20 | Stone Chips 42 KM |
| 21 | Stone Boulder 42 KM |
| 22 | Np2 Hume Pipe 250 mm dia 65 KM |
| 23 | Provision of GST @ 12% |
| 24 | Add 1% Labour Cess |