Supply Installation Configuration And Additional Items For Victers Channel Studio At Kite , 27-Inch Imac With Retina 5K Display: 3.8Ghz 8-Core 10Th-Generation Intel Core I7 Processor, 512 Ssd / 8Gb Ram Or Latest Version , Additional 8Gb Ram : Warr
Tender Overview
Project Description
Supply Installation Configuration And Additional Items For Victers Channel Studio At Kite , 27-Inch Imac With Retina 5K Display: 3.8Ghz 8-Core 10Th-Generation Intel Core I7 Processor, 512 Ssd / 8Gb Ram Or Latest Version , Additional 8Gb Ram : Warranty:3 Years , Apple Protection – Additional Apple Protection: Additional 2 Years Warranty- , Aja Lo Xt – 10-Bit 3G / Dual Link / Hd / Sd I / O Viathunderbolt, Additional Thunderbolt Port For Peripherals, Acadapter – Warranty 3 Years , Lacie 4Tb Thunderbolt Hdd:Warranty:3 Years , Play Out Software- Onthe Air Video Hd Latest Version : 3 Years Warranty , Apple Cable - Thunderbolt 2 To 3 , Installation & Commissioning With Necessary Cable & Accessories
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 01-Feb-2022 | date corrigendum 1 | Date | 08-Feb-2022 |
| 2 | 03-Feb-2022 | clarification | Other | 08-Feb-2022 |
| 3 | 09-Feb-2022 | date 2 corrigendum | Date | 17-Feb-2022 |
BOQ
| Sl. No. | Item Description |
| 1 | 27-inch iMac with Retina 5K display: 3.8GHz 8-core 10th-generation Intel Core i7 processor, 512 SSD/8GB Ram or latest version |
| 2 | Additional 8GB RAM : Warranty:3 Years |
| 3 | Apple protection – Additional apple protection: additional 2 years warranty- |
| 4 | AJA LO XT – 10-bit 3G/Dual Link/HD/SD I/O viaThunderbolt, Additional Thunderbolt port for peripherals, ACAdapter – Warranty 3 years |
| 5 | Lacie 4TB thunderbolt HDD:Warranty:3 Years |
| 6 | Play out software- ONTHE AIR VIDEO HD latest version : 3 years warranty |
| 7 | Apple Cable - Thunderbolt 2 to 3 |
| 8 | Installation & commissioning with necessary cable & accessories |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender