Road Transport and Highways Government Departments Closing in 0 days TDR #30732260

Shifting Of 33 Kv, 11Kv, Lt Lines And S S From Light House Chhaka To Chandrabhaga Shifting Of 33 Kv, 11Kv, Lt Lines And S S From Light House Chhaka To Chandrabhaga To Nearby Safety Place Due To Impt And Widening Of 6 Lane Road Under Electrical Section

Issued by Government Departments · Chandrabhaga, Odisha
Tender Value
77.04 Lakhs
Estimated cost
Bid Submission
29 Jan 2022
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Chandrabhaga → Odisha
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Shifting Of 33 Kv, 11Kv, Lt Lines And S S From Light House Chhaka To Chandrabhaga Shifting Of 33 Kv, 11Kv, Lt Lines And S S From Light House Chhaka To Chandrabhaga To Nearby Safety Place Due To Impt And Widening Of 6 Lane Road Under Electrical Section Konark.

BOQ

Name of Work: Shifting of 33KV, 11KV, LT linesand S S from Light House Chhaka to Chandrabhaga to nearby safety place due to Improvement and Widening of 6 Lane road under Electrical Section Konark in 6 percentage deposit work scheme.
Sl. No. Item Description
1Part-A = Construction of 3P3W 33KV line over H Pole (13mtr. Long GI Joist with 148mm squareAAAC= 0.4 Km. (Sutana Feeder)H-Pole-13mtr. Long (Galvanized) (720 Kg/each)
233 KV V-cross arm (22Kg) GI
3Top bracket 100x50x6 GI Channel (2Kg each)
4GI Back Clamp for V cross arm (33KV) (1.7Kg each)
533 KV Polymer type Pin Insulator with Pin
6HW fittings (B&S) 90 KN, 4 Bolt
7Disc Insulator (B&S) 90 KN Polymer
8HT stay set (complete)
9HT stay Insulator
10HT stay Clamp (1.95 Kg/ Pair)
117/8 SWG stay wire(12Kg/ stay)
12Fixing of stay set with 0.5 Cum cement concrete foundation 1:3:6 size (900mm x 600mm x 900mm) using 40mm BHG metal with all labour and material except stay set, stay wire, stay insulator.
13148mm square AAAC
14Earthing of support (Coil Type)
15Concreting of support C.C.-1:4:8 using 40mm BHG metal size 5\".6\"x2\"x2\"= 22 CFT= 0.620 Cum padding 900x600x150mm= [email protected]= 2152.95 each with escalation 32%
16Couping of support section 15\"x15\" (3.9 Cft) height 2\"-6\" (1\"-6\" above GL & 1\"-0\" below GL) in CC 1:2:4 using 12mm BHG metal & curing for 5 days.
17GI Nut, Bolt & Washer of different sizes
18GI barded wire anticlimbing device 3 Kg per support
19100x50x6mm GI Channel (9.2Kg./Mtr.)
20Sundries for survey, tree cutting, small size Nut & Bolt, Aluminium Binding Wire, Tape and Danger Board Etc and jumpering to be done through PG clamp.
21Part-B = Laying of 4 numbers 1Cx400mm square 33KV XLPE Cable (Armoured) by HDD method= 0.50 Km.1Cx400mm square 33KV XLPE Cable (Armoured) (1 no as Spare)
22Heat shrinkable Jointing Kit for 1Cx400mm square 33KV XLPE Cable (Outdoor type)
23Testing of Cable
24Sundries
25Part-C = Laying of 4 numbers 1Cx300mm square 11KV XLPE Cable (Armoured) by HDD method= 0.50 Km. 1Cx300mm square 11KV XLPE Cable (Armoured) (1 no as Spare)
26Heat shrinkable Jointing Kit for 1Cx300mm square 11KV XLPE Cable (Outdoor type)
27Testing of Cable
28Sundries
29Part-D = Laying of 5 numbers 1Cx95mm square LT XLPE Cable (Armoured) by HDD method= 0.20 Km. 1Cx95mm square LT XLPE Cable (Armoured) (1 no as Spare)
30Testing of Cable
31Sundries
32PART-E =Laying of UG Cable (33KV, 11KV & LT) by HDD method with supply of HDPE Pipe=1.2Km. and construction of loop chamber= 4nos.Laying of UG Cable (33KV, 11KV & LT) by HDD method with supply of HDPE Pipe of 150mm dia, (33KV= 0.50Km, 11KV=0.50Km. and LT=0.20Km.)(Rate extracted as discussed with NEG team TPCODL, BBSR)
33Cable route marker
34Loop chamber
35PART-F = Construction of 3P3W 11KV line over160x160mm WPB (13mtr. Long) with 100mm squareAAAC= 1.0 Km. (ODAFF=0.60Km. & Konark over head= 0.40Km.)160x160mmWPB (11mtr. Long) (30.44Kg/Mtr.) (each cost - 334.84Kg.) (334.84Kg. X Rs.75/- per Kg.= Rs.25113/-)
3611KV V Cross Arm (10.2Kg. Each)
37GI Back Clamp for V cross arm (1.7Kg each)
38Top bracket (75x40x6mm GI Channel) (1.3Kg each)
3911KV Polymer Type Pin Insulator including GI Pin
40HW fittings (B&S) 90 KN, 4 Bolt
41Disc Insulator (B&S) 90KN Polymer
42HT stay set (complete)
43HT stay Insulator
44Fixing of stay set with 0.5 Cum cement concrete foundation 1:3:6 size (900mm x 600mm x 900mm) using 40mm BHG metal with all labour and material except stay set, stay wire, stay insulator.
45HT stay Clamp (1.95 Kg/ Pair)
467/10 SWG stay wire (10Kg./ Stay)
47Earthing of support (Coil Type)
48100mm square AAA Conductor
49Concreting of support C.C.-1:4:8 using 40mm BHG metal size 5\".6\"x2\"x2\"= 22 CFT= 0.620 Cum padding 900x600x150mm= [email protected]= 2152.95 each with escalation 32%
50Couping of support section 15\"x15\" (3.9Cft.) height 2\"-6\" (1\"-6\" above GL and 1\"-0\" below GL) in CC 1:2:4 using 12mm BHG metal and curring for 5 days.
51GI badded wire anti climbing device 2Kg./support
52GI Nut, Bolt & Washer of different sizes
53100x50x6mm GI Channel (9.2Kg./Mtr.) (for cut point)
54Sundries for survey, tree cutting, small size Nut & Bolt, Aluminium Binding Wire, Tape and Danger Board Etc and jumpering to be done through PG clamp.
55PART-G= Installation of line DP for UG Cable end termination= 4Nos. 160x160mm WPB (11mtr. Long) (30.44Kg./Mtr.) (each cost -334.84Kg) (334.84Kg.x Rs.75/- per Kg.= Rs.25113.00)
56Pressure Channel 100x50x6mm GI Channel each 4mtr. Long (9.2Kg./Mtr.)x 2Nos. for each.
57Concreting of support C.C.-1:4:8 using 40mm BHG metal size 5\".6\"x2\"x2\"= 22 CFT= 0.620 Cum padding 900x600x150mm= [email protected]= 2152.95 each with escalation 32%
58Couping of support section 15\"x15\" (3.9Cft.) height 2\"-6\" (1\"-6\" above GL and 1\"-0\" below GL) in CC 1:2:4 using 12mm BHG metal and curring for 5 days.
59HT stay set (complete)
60HT stay Insulator
61Fixing of stay set with 0.5 Cum cement concrete foundation 1:3:6 size (900mm x 600mm x 900mm) using 40mm BHG metal with all labour and material except stay set, stay wire, stay insulator.
62HT stay Clamp (1.95 Kg/ Pair)
637/10 SWG stay wire (10Kg./ Stay)
64Earthing of support (Coil Type)
6511KV L.A., 12KV-10KA
66GI Pipe for earthing 40mm dia 3mtr. Long (for each core)
6725x5 GI Flat
68Materials for massionary work for earth pit, charcoal, salt etc. including construction of earthing chamber (size 2\"x2\") and RCC Slab Cover.
69HW fittings (B&S) 90K.N., 4 Bolt.
70Disc Insulator (B&S) 90KN Polymer
71GI badded wire anti climbing device 3Kg./support
72GI Nut, Bolt & Washer of different sizes
73100x50x6mm GI Channel (9.2Kg./Mtr.) (as supporting channel)
74Sundries for survey, PVC Tape, Ampere Tape, Danger Board, Small size Nut & Bolt, Preparation of Drawing, Alluminium socket, PVC Pipe etc. and jumpering to be done through PG clamp.
75PART-H= Installation 250 KVA 11/0.4KV Plinth mounted S/S= 1No. (without Trf)160x160mm WPB (11mtr. Long) (30.44Kg./Mtr.) (each cost- 334.84Kg.) (334.84Kg. X 75.00 per Kg.= Rs.25113/-)
76Pressure Channel 100x50x6mm GI Channel each 2.8mtr. long (9.2Kg./Mtr.)x 2Nos.
77S/S DP Bressing Channel 75x40x6mm GI Channel each 2.8mtr. Long (6.8Kg./ Mtr.)
78AB Switch & HG Fuse mounting channel 75x40x6mm GI Channel each 2.8mtr. Long (6.8Kg./ Mtr.)
79Cantilevel channel for supporting AB Switch Arm 75x40x6mm GI Channel each 1mtr. Long 2 Nos. (6.8Kg./ Mtr.)
80Cantilevel channel for supporting HG Fuse 50x50x6mm GI Angle each 1mtr. Long (4.5Kg./ Mtr.)
81Angle for cantilever arrangement for AB Switch and HG Fuse, with 50x50x6mm GI Angle each 2mtr. each 2Nos (4.5Kg./ Mtr.)
82S/S DP Bressing Angle 50x50x6mm GI Angle 2.8mtr. Long 2No. (4.5Kg./ Mtr.) with side angle (total 9mtr.)
83Angle for mounting LT Distribution box 50x50x6mm, GI Angle each 2.5mtr. each long 2Nos (4.5Kg./ Mtr.)
8411KV HW fitting polymer type
8511KV Disc Insulator (B&S) 70KN (Double Disc Provision) (Polymer type)
8611KV AB Switch 3 Pole (400Amp)
8711KV HG Fuse 3 Pole (400Amp)
8811KV L.A., 12KV-10KA
89HT stay set (complete)
90HT stay insulator
91HT stay clamp (1.95 Kg/ Pair)
927/10 SWG stay wire
93GI Pipe for earthing 40mm dia midium gage 3mtr. Long
9425x5mm GI Flat for earthing
9540x6mm GI Flat for nutral
96Fixing of stay set with 0.5 Cum cement concrete foundation 1:3:6 size (900mm x 600mm x 900mm) using 40mm BHG metal with all labour and material except stay set, stay wire, stay insulator.
97Concreting of support C.C.-1:4:8 using 40mm BHG metal size 5\"x2\"x2\"= 20 CFT= 0.570 Cum padding 900x600x150mm= [email protected]= 1999.38 each
98Couping of support section 15\"x15\" (3.9Cft.) height 2\"-6\" (1\"-6\" above GL and 1\"-0\" below GL) in CC 1:2:4 using 12mm BHG metal and curing for 5 days.
99Materials for massionary work for earth pit, charcoal, salt etc. including construction of earthing chamber (size 2\"x2\") and RCC Slab Cover.
10055mm square Insulated conductor
10150x6mm Copper Z Clamp for TFR LT 4Nosx0.8Kg. each for connection of LT Cable
102GI Nut, Bolt & Washer
103LT Distribution Box including Kit Kat Fuse with MCCB for 250KVA S/S (as per CESU Specification) with arrangement of 2Nos I/C and 3Nos. O/G LT Feeder.
1043 1/2x300mm square PVC Cable for I/C (1No.) 250KVA TFR
1053 1/2x300mm square PVC Cable for O/G (1No.) 250KVA TFR
106100x116mm RS Joist 4mtr. Long x 23Kg. for resting of LT Cable
107Plinth for TFR 6\" height (below GL 2ft.) x 5ft.x5ft.
108Boundary wall arround the S/S of size 20\"x15\" with spreading of metal & Sand filling inside substation premises with fixing of Grill Gate (specimen copy enclosed with specification) annexure-I
109Plinth for installation of LT Distribution Box
110Sundries for survey, PVC Tape, Ampere Tape, Danger Board, Samall size Nut & Bolt, Preparation of Drawing Cable, Alluminium socket, etc. and jumpering to be done through PG clamp.
111PART-I= Installation of 100 KVA 11/0.4KV Plinth mounted S/S= 1No. (without Trf)160x160mm WPB (11mtr. Long) (30.44Kg./Mtr.) (each cost- 334.84Kg.) (334.84Kg. X 75.00 per Kg.= Rs.25113/-)
112Pressure Channel 100x50x6mm GI Channel each 2.8mtr. long (9.2Kg./Mtr.)x 2Nos.
113SS DP Bressing Channel 75x40x6mm GI Channel each 2.8mtr. Long (6.8Kg./mtr.) x 2Nos.
114AB Switch & HG Fuse mounting channel 75x40x6mm GI Channel each 2.8mtr. long (6.8Kg./ Mtr.) x 4Nos.
115Cantilevel channel for supporting AB Switch Arm, 75x40x6mm GI Channel each 1mtr. Long (6.8Kg./ Mtr.) x 2Nos
116Cantilevel angle for supporting HG Fuse, 50x50x6mm GI Angle each 1mtr. Long (4.5Kg./ Mtr.) x 2Nos
117Angle for cantilever arrangement for AB Switch and HG Fuse, with 50x50x6mm GI Angle each 2mtr. long (4.5Kg./ Mtr.)x 2Nos
118S/S DP Bressing Angle 50x50x6mm GI Angle each 2.8mtr. Long (4.5Kg./ Mtr.) with side angle (total 9mtr.)
119Angle for mounting LT Distribution box 50x50x6mm, GI Angle each 2.5mtr.long (4.5Kg./ Mtr.) x 2Nos
12011KV HW fitting
12111KV Disc Insulator (Polymer type) 70KN
12211KV AB Switch 3 Pole (400Amp)
12311KV HG Fuse 3 Pole (400Amp)
12411KV L.A., 12KV-10KA
125HT Stay set (complete)
126HT stay Insulator
127HT stay clamp (1.95 Kg/ Pair)
1287/10 SWG stay wire
129GI Pipe for earthing 40mm dia medium gage 3mtr. Long
13025x5 GI Flat
13140x6mm GI Flat for nutral
132Fixing of stay set with 0.5 Cum cement concrete foundation 1:3:6 size (900mm x 600mm x 900mm) using 40mm BHG metal with all labour and material except stay set, stay wire, stay insulator.
133Concreting of support CC-1:4:8 using 40mm BSG metal size 5\"-6\"x2\"-2\"= 22Cft=0.620cum padding 900x600x150mm= 0.0810.701cum @ 3071.25= 2152.95 each with escalation 32%.
134Couping of support section 15\"x15\" (3.9Cft.) height 2\"-6\" (1\"-6\" above GL and 1\"-0\" below GL) in CC 1:2:4 using 12mm BHG metal and curring for 5 days.
135Materials for massionary work for earth pit, charcoal, salt etc. including construction of earthing chamber (size 2\"-2\") and RCC Slab Cover.
13655mm square AAA conductor
137GI Nut, Bolt & Washer
138LT Distribution Box including Kit Kat Fuse with MCCB for 100KVA S/S (as per CESU Specification)
1393 1/2x150mm square PVC cable for 100KVA TFR
140Plinth for TFR 6\" height (below GL 2\") x 5\"x5\"
141Boundary wall arround the S/S of size 20\"x15\" with spreading of metal & Sand filling inside substation premises with fixing of Grill Gate (specimen copy enclosed with specification) annexure-I
142Sundries for survey, PVC tape, Ampere tape, Danger Board, Small size nut & Bolt, Preparation of Drawing, Alluminium socket etc. and jumpering to be done through PG Clamp.
143PART-J= Construction of 3P4W LT Line over 9mtr. Long 300Kg. PSC Pole with 3x50+1x35mm square ABC= 0.360Km.9mtr. long 300Kg. PSC Pole
144Concrete base plate of size 2\"x2\"x2\" thickness for each PSC Pole
145Couping of support section 15\"x15\" (3.9Cft.) height 2\"-6\" (1\"-6\" above GL and 1\"-0\" below GL) in CC 1:2:4 using 12mm BHG metal and curing for 5 days.
146LT stay set (complete)
1477/12 SWG stay wire
148LT stay clamp (complete) (1.4Kg./Pair)
149LT stay Insulator
150Fixing and concreting of stay set with 0.5 Cum cement concrete foundation 1:3:6 size (900mm x 600mm x 900mm) using 40mm BHG metal with all labour and material except stay set, stay wire, stay insulator.
151Earthing of support (Coil Type)
152Dead end Clamp
153Suspension clamp with I Hook
154Strain fittings
155Guy Grip dead end
156GI Nut & Bolts
157AB cable (3x50+1x35mm square)
158Insulated Piercing connector
159Sundries for survey, tree cutting, insulated tape etc.
160PART-K= Labour charges for dismantaling of 33KV, 11KV Line & SS with all accessories.Dismantaling of 33KV UG Cable Line with all accessories
161Dismantaling of 3P3W33KV Line with 148mm square AAAC with all accessories including H Pole.
162Dismantaling of 3P3W11KV Line with 55mm square AAAC with all accessories including Pole.
163Dismantaling of Line DP with all accessories including Pole
164Dismantaling of 100KVA 11/0.4KV S/S with all accessories including Pole.
165Dismantaling of 250KVA 11/0.4KV S/S with all accessories icluding Pole.
166Dismantaling of 3P4W LT Line with all accessories icluding Pole.Note:- The salvage value of dismentalled materials amounting to R 59611.20 shall be deducted from Contractor\"s Bill.

AI Tender Summary

OUR REF NO 30732260
AUTHORITY Government Departments
TENDER VALUE 77.04 Lakhs
LAST DATE 29-01-2022
Authority
Authority Name Highway Department
Work Description Shifting Of 33 Kv, 11Kv, Lt Lines And S S From Light House Chhaka To Chandrabhaga Shifting Of 33 Kv, 11Kv, Lt Lines And S S From Light House Chhaka To Chandrabhaga To Nearby Safety Place Due To Impt And Widening Of 6 Lane Road Under Electrical Section Konark.
Basic Detail
Tender No CCE N NH C BBSR 06 2021 22
Bidding Type Tender
Location
City Chandrabhaga
State Odisha
Key Dates
Publish Date 17 Jan 2022
Submission Date 29 Jan 2022
Open Date 02 Feb 2022
Finance
Tender Value 77.04 Lakhs
Tender Fee 10000
EMD Ref. Documents
Exemption Not Available
Document List
76ab1d68-9dcb-4f9d-9e19-09a5c75991f5.html
BOQ_392185.xls
DTCN33and11KVLighthouse.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 17, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 29, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Feb 02, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

76ab1d68-9dcb-4f9d-9e19-09a5c75991f5.html

xls

BOQ_392185.xls

pdf

DTCN33and11KVLighthouse.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender