Shifting Of 33 Kv, 11Kv, Lt Lines And S S From Light House Chhaka To Chandrabhaga Shifting Of 33 Kv, 11Kv, Lt Lines And S S From Light House Chhaka To Chandrabhaga To Nearby Safety Place Due To Impt And Widening Of 6 Lane Road Under Electrical Section
Tender Overview
Project Description
Shifting Of 33 Kv, 11Kv, Lt Lines And S S From Light House Chhaka To Chandrabhaga Shifting Of 33 Kv, 11Kv, Lt Lines And S S From Light House Chhaka To Chandrabhaga To Nearby Safety Place Due To Impt And Widening Of 6 Lane Road Under Electrical Section Konark.
BOQ
| Sl. No. | Item Description |
| 1 | Part-A = Construction of 3P3W 33KV line over H Pole (13mtr. Long GI Joist with 148mm squareAAAC= 0.4 Km. (Sutana Feeder)H-Pole-13mtr. Long (Galvanized) (720 Kg/each) |
| 2 | 33 KV V-cross arm (22Kg) GI |
| 3 | Top bracket 100x50x6 GI Channel (2Kg each) |
| 4 | GI Back Clamp for V cross arm (33KV) (1.7Kg each) |
| 5 | 33 KV Polymer type Pin Insulator with Pin |
| 6 | HW fittings (B&S) 90 KN, 4 Bolt |
| 7 | Disc Insulator (B&S) 90 KN Polymer |
| 8 | HT stay set (complete) |
| 9 | HT stay Insulator |
| 10 | HT stay Clamp (1.95 Kg/ Pair) |
| 11 | 7/8 SWG stay wire(12Kg/ stay) |
| 12 | Fixing of stay set with 0.5 Cum cement concrete foundation 1:3:6 size (900mm x 600mm x 900mm) using 40mm BHG metal with all labour and material except stay set, stay wire, stay insulator. |
| 13 | 148mm square AAAC |
| 14 | Earthing of support (Coil Type) |
| 15 | Concreting of support C.C.-1:4:8 using 40mm BHG metal size 5\".6\"x2\"x2\"= 22 CFT= 0.620 Cum padding 900x600x150mm= [email protected]= 2152.95 each with escalation 32% |
| 16 | Couping of support section 15\"x15\" (3.9 Cft) height 2\"-6\" (1\"-6\" above GL & 1\"-0\" below GL) in CC 1:2:4 using 12mm BHG metal & curing for 5 days. |
| 17 | GI Nut, Bolt & Washer of different sizes |
| 18 | GI barded wire anticlimbing device 3 Kg per support |
| 19 | 100x50x6mm GI Channel (9.2Kg./Mtr.) |
| 20 | Sundries for survey, tree cutting, small size Nut & Bolt, Aluminium Binding Wire, Tape and Danger Board Etc and jumpering to be done through PG clamp. |
| 21 | Part-B = Laying of 4 numbers 1Cx400mm square 33KV XLPE Cable (Armoured) by HDD method= 0.50 Km.1Cx400mm square 33KV XLPE Cable (Armoured) (1 no as Spare) |
| 22 | Heat shrinkable Jointing Kit for 1Cx400mm square 33KV XLPE Cable (Outdoor type) |
| 23 | Testing of Cable |
| 24 | Sundries |
| 25 | Part-C = Laying of 4 numbers 1Cx300mm square 11KV XLPE Cable (Armoured) by HDD method= 0.50 Km. 1Cx300mm square 11KV XLPE Cable (Armoured) (1 no as Spare) |
| 26 | Heat shrinkable Jointing Kit for 1Cx300mm square 11KV XLPE Cable (Outdoor type) |
| 27 | Testing of Cable |
| 28 | Sundries |
| 29 | Part-D = Laying of 5 numbers 1Cx95mm square LT XLPE Cable (Armoured) by HDD method= 0.20 Km. 1Cx95mm square LT XLPE Cable (Armoured) (1 no as Spare) |
| 30 | Testing of Cable |
| 31 | Sundries |
| 32 | PART-E =Laying of UG Cable (33KV, 11KV & LT) by HDD method with supply of HDPE Pipe=1.2Km. and construction of loop chamber= 4nos.Laying of UG Cable (33KV, 11KV & LT) by HDD method with supply of HDPE Pipe of 150mm dia, (33KV= 0.50Km, 11KV=0.50Km. and LT=0.20Km.)(Rate extracted as discussed with NEG team TPCODL, BBSR) |
| 33 | Cable route marker |
| 34 | Loop chamber |
| 35 | PART-F = Construction of 3P3W 11KV line over160x160mm WPB (13mtr. Long) with 100mm squareAAAC= 1.0 Km. (ODAFF=0.60Km. & Konark over head= 0.40Km.)160x160mmWPB (11mtr. Long) (30.44Kg/Mtr.) (each cost - 334.84Kg.) (334.84Kg. X Rs.75/- per Kg.= Rs.25113/-) |
| 36 | 11KV V Cross Arm (10.2Kg. Each) |
| 37 | GI Back Clamp for V cross arm (1.7Kg each) |
| 38 | Top bracket (75x40x6mm GI Channel) (1.3Kg each) |
| 39 | 11KV Polymer Type Pin Insulator including GI Pin |
| 40 | HW fittings (B&S) 90 KN, 4 Bolt |
| 41 | Disc Insulator (B&S) 90KN Polymer |
| 42 | HT stay set (complete) |
| 43 | HT stay Insulator |
| 44 | Fixing of stay set with 0.5 Cum cement concrete foundation 1:3:6 size (900mm x 600mm x 900mm) using 40mm BHG metal with all labour and material except stay set, stay wire, stay insulator. |
| 45 | HT stay Clamp (1.95 Kg/ Pair) |
| 46 | 7/10 SWG stay wire (10Kg./ Stay) |
| 47 | Earthing of support (Coil Type) |
| 48 | 100mm square AAA Conductor |
| 49 | Concreting of support C.C.-1:4:8 using 40mm BHG metal size 5\".6\"x2\"x2\"= 22 CFT= 0.620 Cum padding 900x600x150mm= [email protected]= 2152.95 each with escalation 32% |
| 50 | Couping of support section 15\"x15\" (3.9Cft.) height 2\"-6\" (1\"-6\" above GL and 1\"-0\" below GL) in CC 1:2:4 using 12mm BHG metal and curring for 5 days. |
| 51 | GI badded wire anti climbing device 2Kg./support |
| 52 | GI Nut, Bolt & Washer of different sizes |
| 53 | 100x50x6mm GI Channel (9.2Kg./Mtr.) (for cut point) |
| 54 | Sundries for survey, tree cutting, small size Nut & Bolt, Aluminium Binding Wire, Tape and Danger Board Etc and jumpering to be done through PG clamp. |
| 55 | PART-G= Installation of line DP for UG Cable end termination= 4Nos. 160x160mm WPB (11mtr. Long) (30.44Kg./Mtr.) (each cost -334.84Kg) (334.84Kg.x Rs.75/- per Kg.= Rs.25113.00) |
| 56 | Pressure Channel 100x50x6mm GI Channel each 4mtr. Long (9.2Kg./Mtr.)x 2Nos. for each. |
| 57 | Concreting of support C.C.-1:4:8 using 40mm BHG metal size 5\".6\"x2\"x2\"= 22 CFT= 0.620 Cum padding 900x600x150mm= [email protected]= 2152.95 each with escalation 32% |
| 58 | Couping of support section 15\"x15\" (3.9Cft.) height 2\"-6\" (1\"-6\" above GL and 1\"-0\" below GL) in CC 1:2:4 using 12mm BHG metal and curring for 5 days. |
| 59 | HT stay set (complete) |
| 60 | HT stay Insulator |
| 61 | Fixing of stay set with 0.5 Cum cement concrete foundation 1:3:6 size (900mm x 600mm x 900mm) using 40mm BHG metal with all labour and material except stay set, stay wire, stay insulator. |
| 62 | HT stay Clamp (1.95 Kg/ Pair) |
| 63 | 7/10 SWG stay wire (10Kg./ Stay) |
| 64 | Earthing of support (Coil Type) |
| 65 | 11KV L.A., 12KV-10KA |
| 66 | GI Pipe for earthing 40mm dia 3mtr. Long (for each core) |
| 67 | 25x5 GI Flat |
| 68 | Materials for massionary work for earth pit, charcoal, salt etc. including construction of earthing chamber (size 2\"x2\") and RCC Slab Cover. |
| 69 | HW fittings (B&S) 90K.N., 4 Bolt. |
| 70 | Disc Insulator (B&S) 90KN Polymer |
| 71 | GI badded wire anti climbing device 3Kg./support |
| 72 | GI Nut, Bolt & Washer of different sizes |
| 73 | 100x50x6mm GI Channel (9.2Kg./Mtr.) (as supporting channel) |
| 74 | Sundries for survey, PVC Tape, Ampere Tape, Danger Board, Small size Nut & Bolt, Preparation of Drawing, Alluminium socket, PVC Pipe etc. and jumpering to be done through PG clamp. |
| 75 | PART-H= Installation 250 KVA 11/0.4KV Plinth mounted S/S= 1No. (without Trf)160x160mm WPB (11mtr. Long) (30.44Kg./Mtr.) (each cost- 334.84Kg.) (334.84Kg. X 75.00 per Kg.= Rs.25113/-) |
| 76 | Pressure Channel 100x50x6mm GI Channel each 2.8mtr. long (9.2Kg./Mtr.)x 2Nos. |
| 77 | S/S DP Bressing Channel 75x40x6mm GI Channel each 2.8mtr. Long (6.8Kg./ Mtr.) |
| 78 | AB Switch & HG Fuse mounting channel 75x40x6mm GI Channel each 2.8mtr. Long (6.8Kg./ Mtr.) |
| 79 | Cantilevel channel for supporting AB Switch Arm 75x40x6mm GI Channel each 1mtr. Long 2 Nos. (6.8Kg./ Mtr.) |
| 80 | Cantilevel channel for supporting HG Fuse 50x50x6mm GI Angle each 1mtr. Long (4.5Kg./ Mtr.) |
| 81 | Angle for cantilever arrangement for AB Switch and HG Fuse, with 50x50x6mm GI Angle each 2mtr. each 2Nos (4.5Kg./ Mtr.) |
| 82 | S/S DP Bressing Angle 50x50x6mm GI Angle 2.8mtr. Long 2No. (4.5Kg./ Mtr.) with side angle (total 9mtr.) |
| 83 | Angle for mounting LT Distribution box 50x50x6mm, GI Angle each 2.5mtr. each long 2Nos (4.5Kg./ Mtr.) |
| 84 | 11KV HW fitting polymer type |
| 85 | 11KV Disc Insulator (B&S) 70KN (Double Disc Provision) (Polymer type) |
| 86 | 11KV AB Switch 3 Pole (400Amp) |
| 87 | 11KV HG Fuse 3 Pole (400Amp) |
| 88 | 11KV L.A., 12KV-10KA |
| 89 | HT stay set (complete) |
| 90 | HT stay insulator |
| 91 | HT stay clamp (1.95 Kg/ Pair) |
| 92 | 7/10 SWG stay wire |
| 93 | GI Pipe for earthing 40mm dia midium gage 3mtr. Long |
| 94 | 25x5mm GI Flat for earthing |
| 95 | 40x6mm GI Flat for nutral |
| 96 | Fixing of stay set with 0.5 Cum cement concrete foundation 1:3:6 size (900mm x 600mm x 900mm) using 40mm BHG metal with all labour and material except stay set, stay wire, stay insulator. |
| 97 | Concreting of support C.C.-1:4:8 using 40mm BHG metal size 5\"x2\"x2\"= 20 CFT= 0.570 Cum padding 900x600x150mm= [email protected]= 1999.38 each |
| 98 | Couping of support section 15\"x15\" (3.9Cft.) height 2\"-6\" (1\"-6\" above GL and 1\"-0\" below GL) in CC 1:2:4 using 12mm BHG metal and curing for 5 days. |
| 99 | Materials for massionary work for earth pit, charcoal, salt etc. including construction of earthing chamber (size 2\"x2\") and RCC Slab Cover. |
| 100 | 55mm square Insulated conductor |
| 101 | 50x6mm Copper Z Clamp for TFR LT 4Nosx0.8Kg. each for connection of LT Cable |
| 102 | GI Nut, Bolt & Washer |
| 103 | LT Distribution Box including Kit Kat Fuse with MCCB for 250KVA S/S (as per CESU Specification) with arrangement of 2Nos I/C and 3Nos. O/G LT Feeder. |
| 104 | 3 1/2x300mm square PVC Cable for I/C (1No.) 250KVA TFR |
| 105 | 3 1/2x300mm square PVC Cable for O/G (1No.) 250KVA TFR |
| 106 | 100x116mm RS Joist 4mtr. Long x 23Kg. for resting of LT Cable |
| 107 | Plinth for TFR 6\" height (below GL 2ft.) x 5ft.x5ft. |
| 108 | Boundary wall arround the S/S of size 20\"x15\" with spreading of metal & Sand filling inside substation premises with fixing of Grill Gate (specimen copy enclosed with specification) annexure-I |
| 109 | Plinth for installation of LT Distribution Box |
| 110 | Sundries for survey, PVC Tape, Ampere Tape, Danger Board, Samall size Nut & Bolt, Preparation of Drawing Cable, Alluminium socket, etc. and jumpering to be done through PG clamp. |
| 111 | PART-I= Installation of 100 KVA 11/0.4KV Plinth mounted S/S= 1No. (without Trf)160x160mm WPB (11mtr. Long) (30.44Kg./Mtr.) (each cost- 334.84Kg.) (334.84Kg. X 75.00 per Kg.= Rs.25113/-) |
| 112 | Pressure Channel 100x50x6mm GI Channel each 2.8mtr. long (9.2Kg./Mtr.)x 2Nos. |
| 113 | SS DP Bressing Channel 75x40x6mm GI Channel each 2.8mtr. Long (6.8Kg./mtr.) x 2Nos. |
| 114 | AB Switch & HG Fuse mounting channel 75x40x6mm GI Channel each 2.8mtr. long (6.8Kg./ Mtr.) x 4Nos. |
| 115 | Cantilevel channel for supporting AB Switch Arm, 75x40x6mm GI Channel each 1mtr. Long (6.8Kg./ Mtr.) x 2Nos |
| 116 | Cantilevel angle for supporting HG Fuse, 50x50x6mm GI Angle each 1mtr. Long (4.5Kg./ Mtr.) x 2Nos |
| 117 | Angle for cantilever arrangement for AB Switch and HG Fuse, with 50x50x6mm GI Angle each 2mtr. long (4.5Kg./ Mtr.)x 2Nos |
| 118 | S/S DP Bressing Angle 50x50x6mm GI Angle each 2.8mtr. Long (4.5Kg./ Mtr.) with side angle (total 9mtr.) |
| 119 | Angle for mounting LT Distribution box 50x50x6mm, GI Angle each 2.5mtr.long (4.5Kg./ Mtr.) x 2Nos |
| 120 | 11KV HW fitting |
| 121 | 11KV Disc Insulator (Polymer type) 70KN |
| 122 | 11KV AB Switch 3 Pole (400Amp) |
| 123 | 11KV HG Fuse 3 Pole (400Amp) |
| 124 | 11KV L.A., 12KV-10KA |
| 125 | HT Stay set (complete) |
| 126 | HT stay Insulator |
| 127 | HT stay clamp (1.95 Kg/ Pair) |
| 128 | 7/10 SWG stay wire |
| 129 | GI Pipe for earthing 40mm dia medium gage 3mtr. Long |
| 130 | 25x5 GI Flat |
| 131 | 40x6mm GI Flat for nutral |
| 132 | Fixing of stay set with 0.5 Cum cement concrete foundation 1:3:6 size (900mm x 600mm x 900mm) using 40mm BHG metal with all labour and material except stay set, stay wire, stay insulator. |
| 133 | Concreting of support CC-1:4:8 using 40mm BSG metal size 5\"-6\"x2\"-2\"= 22Cft=0.620cum padding 900x600x150mm= 0.0810.701cum @ 3071.25= 2152.95 each with escalation 32%. |
| 134 | Couping of support section 15\"x15\" (3.9Cft.) height 2\"-6\" (1\"-6\" above GL and 1\"-0\" below GL) in CC 1:2:4 using 12mm BHG metal and curring for 5 days. |
| 135 | Materials for massionary work for earth pit, charcoal, salt etc. including construction of earthing chamber (size 2\"-2\") and RCC Slab Cover. |
| 136 | 55mm square AAA conductor |
| 137 | GI Nut, Bolt & Washer |
| 138 | LT Distribution Box including Kit Kat Fuse with MCCB for 100KVA S/S (as per CESU Specification) |
| 139 | 3 1/2x150mm square PVC cable for 100KVA TFR |
| 140 | Plinth for TFR 6\" height (below GL 2\") x 5\"x5\" |
| 141 | Boundary wall arround the S/S of size 20\"x15\" with spreading of metal & Sand filling inside substation premises with fixing of Grill Gate (specimen copy enclosed with specification) annexure-I |
| 142 | Sundries for survey, PVC tape, Ampere tape, Danger Board, Small size nut & Bolt, Preparation of Drawing, Alluminium socket etc. and jumpering to be done through PG Clamp. |
| 143 | PART-J= Construction of 3P4W LT Line over 9mtr. Long 300Kg. PSC Pole with 3x50+1x35mm square ABC= 0.360Km.9mtr. long 300Kg. PSC Pole |
| 144 | Concrete base plate of size 2\"x2\"x2\" thickness for each PSC Pole |
| 145 | Couping of support section 15\"x15\" (3.9Cft.) height 2\"-6\" (1\"-6\" above GL and 1\"-0\" below GL) in CC 1:2:4 using 12mm BHG metal and curing for 5 days. |
| 146 | LT stay set (complete) |
| 147 | 7/12 SWG stay wire |
| 148 | LT stay clamp (complete) (1.4Kg./Pair) |
| 149 | LT stay Insulator |
| 150 | Fixing and concreting of stay set with 0.5 Cum cement concrete foundation 1:3:6 size (900mm x 600mm x 900mm) using 40mm BHG metal with all labour and material except stay set, stay wire, stay insulator. |
| 151 | Earthing of support (Coil Type) |
| 152 | Dead end Clamp |
| 153 | Suspension clamp with I Hook |
| 154 | Strain fittings |
| 155 | Guy Grip dead end |
| 156 | GI Nut & Bolts |
| 157 | AB cable (3x50+1x35mm square) |
| 158 | Insulated Piercing connector |
| 159 | Sundries for survey, tree cutting, insulated tape etc. |
| 160 | PART-K= Labour charges for dismantaling of 33KV, 11KV Line & SS with all accessories.Dismantaling of 33KV UG Cable Line with all accessories |
| 161 | Dismantaling of 3P3W33KV Line with 148mm square AAAC with all accessories including H Pole. |
| 162 | Dismantaling of 3P3W11KV Line with 55mm square AAAC with all accessories including Pole. |
| 163 | Dismantaling of Line DP with all accessories including Pole |
| 164 | Dismantaling of 100KVA 11/0.4KV S/S with all accessories including Pole. |
| 165 | Dismantaling of 250KVA 11/0.4KV S/S with all accessories icluding Pole. |
| 166 | Dismantaling of 3P4W LT Line with all accessories icluding Pole.Note:- The salvage value of dismentalled materials amounting to R 59611.20 shall be deducted from Contractor\"s Bill. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents