Design, Engineering, Procurement, Supply, Erection And Commissioning Of Four (4) Gas Turbine Generator (Gtg) Of 34 Mw Each And Four (4) Heat Recovery Steam Generator (Hrsg) Of 125 Tph Each Along With All Auxiliaries For Cpp For 9 Mmtpa Cbr Project Design, Engineering, Procurement, Supply, Erection And Commissioning Of Four (4) Gas Turbine Generator (Gtg) Of 34 Mw Each And Four (4) Heat Recovery Steam Generator (Hrsg) Of 125 Tph Each Along With All Auxiliaries For Cpp For 9 Mmtpa Cbr Project , Lumpsum Turnkey Basis With Single Point Responsibility Including But Not Limited To The Following Activities Of Works: Detailed Design And Engineering,Preparation And Submission Of Engineering Drawings & Related Documentation Including As Built/ Final Documentation Providing All Services And Completing The Work In All Respects As Per Provision Of Bidding Document. Supply Of All Materials Including - Procurement Services, Shop Fabrication, Third Party Inspection, Expediting, Project Management, Planning, Scheduling, Monitoring, Transportation, All Loading And Unloading; Payable In The Contractor’S Country; Insurance In Contractor’S Scope; All Type Of Freights Including Ocean Freight / Air Freight And Inland Freight, Custom Clearance, All Type Of Handling Including Port Handling, Stevedoring, Handling At Worksite Etc., Supply Of Start- Up / Pre-Commissioning / Commissioning / Mandatory Spares/Special Tools And Tackles. Erection Including Loading/Unloading Of The Materials At Contractor’S Warehouse, Transportation Of The Materials From Contractor’S Workshop / Store To Erection Site, Assembly / Sub-Assembly Of The Equipment, Erection, Installation, Testing, Inspection, Pre-Commissioning / Commissioning & Pgtr, Handing Over To Owner Inlcluding All Disciplines Of Work And Supplly Of Material As Per Tender Requirements Such As Structural, Civil, Mechanical, Piping, Electrical, Instrumentation, Insulation, Painting, Supply Of All Accessories And Materials For Erection / Testing; Supply Of All Consumables, Providing Equipment, Special Tools And Tackles; Providing Supervisory Personnel, Tradesman Skilled / Unskilled Labour; Insurance In Contractor’S Scope; Completing All Works In All Respects As Per Provisions Of Bidding Document. • Completion Of All Works In All Respects As Per Provisions Of The Bidding Document And Directions Of The Engineer-In-Charge, Including Any Other Activity Of Work Required To Complete The Plant In All Respects To Make The Plant Functional. , Foreign Currency Part , Indian Currency Part