Pimpri Chinchwad Municipal Corporation has published Appointment Of Technical Services Provider ( Tsp ) And Project Implementation Unit ( Piu ) For Sewer Drain Network, Storm Water Drain Network And Rehabilitation Of Nallas Of Pimpri-Chinchwad City. Submission Date for this Tender is 05-02-2022. Drainage Tenders in PIMPRI CHINCHWAD Maharashtra. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 20-Jan-2022 | GOOGLE MEET | Other | 29-01-2022 |
2 | 28-Jan-2022 | DATE | Date | 05-02-2022 |
Sl. No. | Item Description |
1 | FIN-3 System Improvement Plan / BOQ / Design and Planning |
2 | Appointment of Technical Service Provider for Preparation of System Improvement Plan for Improvement and Rejuvenation of the Existing sewerage scheme, Sewage Treatment Plants (STPs)of Pimpri Chinchwad City andAchievement of Service Level Benchmark in each sector and achieving the goal of urban including Tertiary Treatment & Reuse of Treated water with designs, drawings, cost estimates, technical specifications and bill of quantities, bid preparation, approvals etc. complete. |
3 | Appointment of Technical Service Provider for Preparation of System Improvement Plan for Improvement and Rejuvenation of the existing rives and Nallas, Development of water bodies in urban area, Rehabilitation of Nallas & storm drain design along the road, Measures to increase rain water harvesting and ground water level of city with designs, drawings, cost estimates, technical specifications and bill of quantities, bid preparation, approvals etc. complete. |
4 | FIN-4 Field work schedule of payment for survey & investigation work |
5 | Detailed Engineeringn Survey |
6 | Alignment Survey (Total Station/DGPS) for PCMC project area and including G.L. at every 30 mtr. along with center line of junction manhole, outfall sewer etc. |
7 | Soil Investigatiion including laboratory testing |
8 | Trial pits 1.5 x 1.5 x 3.0 m |
9 | 100 mm dia bore upto 10 mtr. for soil analysis and soil bearing capacity |
10 | Condition assessment & Asset Registry & Mappinng |
11 | Storm network update in GIS map |
12 | Sewage network update in GIS map |
13 | Condition Assessment of existing Sewer lines Asset Functionality, Efficiency and Service Time/ Life Time of the assets using Robotic / CCTV Technology. |
14 | Customer Survey and linking Customer Database in GIS |
15 | Sewerage - STP/SPS - Asset Management / Developmentt of Asset Register (above Ground) |
16 | FIN-5 Remuneratino for Professional Staff and Support Staff |
17 | Team Leader cum Resident Engineer |
18 | Specialist - Sewerage Network |
19 | Construction Manager / Quantity Surveyor (Civil / Mechanical) |
20 | Specialist - Electrical / Instrumentation |
21 | Structural Expert |
22 | Assistant Construction Manager (Civil) |
23 | Assistant Construction Manager (Mechanical / Electrical) |
24 | Field Engineer - Civil |
25 | Field Engineer - Elect./Mech. |
26 | Quality Controller Civil |
27 | Auto CADD/GIS Operator / Draftsman |
28 | Computer Operator / Site Supervisor |
29 | Other Support Staff |
30 | FIN-6 Reimbursable Expenses |
31 | Cost of office operation, including overheads and back-office support at project office in PCMC |
32 | Local Transport at Project Office (Vehicle) |
33 | Communication Costs to all personnel and Office at project office |
34 | Cost of Reports Production (including printing) and delivering to the PCMC at project office |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail