| 1 | Earthwork in excavation by mechanical means Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming ofbottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed , within a lead of 50m - all kinds of soil |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate40mm nominal size) |
| 3 | Centring and shuttering including strutting , propping etc. and removal of form work for - foundations, footings, bases for columns |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.- All work upto plinth level -1:3:6 (1 cement :3coarse sand : 6 graded stone aggregate 20mm nominal size) |
| 5 | Providing and laying in position cementconcrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:2:4 (1 cement : 2coarse sand : 4 graded stone aggregate 20mmnominal size) |
| 6 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, butexcluding the cost of nosing of steps etc.complete - 40mm thick with 20mm nominal size stone aggregate |
| 7 | 6mm cement plaster of mix 1:3 (1 cement : 3 fine sand) |
| 8 | Steel work welded in built up section/framed work including cutting hoisting,fixing in position and applying apriming coat of approved steel primer using structural steel etc. as required. In grating, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 9 | Providing , hoisting and fixing upto floorfive level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but excluding cost of reinforcement , with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) |
| 10 | Steel reinforcement for R.C.C.workincluding straightening , cutting , bending , placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars (ISI BRAND OF APPROVED MAKE) Fe - 415 or more |