Renovation Of 60 Hp Centrifugal Pump Set ( Set No. - 02 ) 125 Kva Servo Controlled Automatic Voltage Stabilizer ( Raw Water ) And 10 H.P Centrifugal Pump Set ( Set No. - 01 ) Repairing Of 30 Kva Servo Controlled Automatic Voltage Stabilizer Renovati
Tender Overview
Project Description
Renovation Of 60 Hp Centrifugal Pump Set ( Set No. - 02 ) 125 Kva Servo Controlled Automatic Voltage Stabilizer ( Raw Water ) And 10 H.P Centrifugal Pump Set ( Set No. - 01 ) Repairing Of 30 Kva Servo Controlled Automatic Voltage Stabilizer Renovation Of 60 Hp Centrifugal Pump Set ( Set No - 02 ) 125 Kva Servo Controlled Automatic Voltage Stabilizer ( Raw Water ) And 10 H.P Centrifugal Pump Set ( Set No - 01 ) Repairing Of 30 Kva Servo Controlled Automatic Voltage Stabilizer
BOQ
| Sl. No. | Item Description |
| 1 | renovation of 60 H.P centrifugal pump set (set no. -02) for rural water supply scheme at Garbandh (raw water) |
| 2 | Cost towards providing labour tools & technician for dismantling 60 HP Kirloskar make sq. cage induction motor and taking out rotor from stator, cutting and removing burnt coil, cleaning and repairing all stator slots properly with cost of reassembling stator and rotor of motor fitting the motor on base plate making all power connection testing on full load including transportation cost of motor from Garbandh p/plant to workshop at Garhwa (48KM m= 96 Km) and Vice versa. |
| 3 | Cost towards providing labour tools and technician for full rewinding of motor stator with supply of super enameled round suitable size copper conductor wire and insulating materials class-F such as Dr. back varnish, cotton tape, wooden stick etc and doing rewinding with making coil and inserting coil into stator slots properly making connection phase to phase and coil to coil, vanishing heating taping sleeving backing in control temperature up to obtaining proper resistanceall complete with deducting the cost of taken out scrap materials (wt of coil 30.5 kg) |
| 4 | Supply changing & fitting SKF make 6313 ball bearing at D.E – 1 no, SKF 6310 ball bearing at NDE – 1 no with bearing grease. |
| 5 | Cost towards dismantling of 60 HP Kirloskar make C/F pump and taking out its rotating unit assembly with changing of damaged parts by new making S/F neck ring as per sample size - 2 nos, C.S shaft as per sample size – 1no, making S/F shaft sleeve2nos, check nut as per sample size – 2 nos , S/Fball bearing SKF 6408 -2 nos and repairing of bearinghousing by welding turning machining as per bearing size - 2 nos, C.I gland tightner as per sample size – 2nos including cost of reassembling of rotating unit assembly balancing rotating unit assembly and fitting the pump with supply of grease gland packing oil packing paper with transporting cost of rotating unit from p/plant to workshop at Garhwa and back |
| 6 | Cost towards replacement of damaged copper cable starter to motor by new supplying and laying 35 mm2 3core, 1.1 KV grade PVC insulated & PVC sheathed unarmoured copper cable any reputed make including lugs – 12 nos. (JSOR 123,M1062) |
| 7 | Cost towards repairing of 75 H.P F.A.S.D starter BCH make by changing contactor set (AC3, 75A, 415V, MC10E-1) – 2 Sets, overload relay unit – 1 Set with all labour tools and tackles. |
| 8 | Cost towards replacing damaged suction pipe by making supply & fitting 100 mm dia heavy duty M.S. suction pipe 10 feet long both end 100 mm dia M.S. flange welding – 2 sets, 100mm dia long bend-1 no with Nut-bolt, rubber insertion etc required for the Job. |
| 9 | Cost towards S/F 100 mm dia C.I D.F sluice value PN-1.6 Heavy duty I.S.I marked Kirloskar, IVC or any reputed make after deducting the cost of scrape material. (JSOR 123,M1039 B) |
| 10 | Cost towards S/F 100 mm dia C.I D.F N.R value PN-1.6 Heavy duty I.S.I marked Kirloskar, IVC or any reputed make after deducting the cost of scrape material. (JSOR 123,M1039 A) |
| 11 | Cost towards S/F 150 mm dia C.I foot valve with brass flap heavy duty I.S.I marked any reputed make after deducting the cost of scrape material. (JSOR 123,M1063). |
| 12 | Supplying all materials, labour, tools and tackles for making chemical earthing station with electrodes and earth fill compound (BFC) etc. all complete as per IE Rules. |
| 13 | Cost towards providing and fixing 25x6 mm G.I. strip at 0.5 m below ground as strip earth electrode including soldering from earthing point to both motor & panel. |
| 14 | Cost towards S/F 250 watt sodium vapour lamp with all accessories to illuminate outside of pump chamber & check dam side. |
| 15 | Cost towards supply of different size (10mm 12mm) gland packing for all P/plants under D.W.&S. mechanical section Garhwa. |
| 16 | Cost towards supply of grease MP3 for all P/Plants under D.W.&S. mechanical section Garhwa. |
| 17 | renovation of 125 KVA servo controlled automatic voltage stabilizer for rural water supply scheme at Garbandh (raw water) under D.W. & S. Mechanical Division, Medininagar. |
| 18 | Disconnecting all electric line & joints & dismantling Power Linemake 125 KVA servo controlled voltage stabiliser for checking defects and removing them with all labour, tools and tackles at site. |
| 19 | Supplying and fitting 3 Kg. operating motor. |
| 20 | Supplying and fitting of variac auto transformer 125 amp. |
| 21 | Supplying and fitting of control card |
| 22 | Supplying and fitting of control transformer |
| 23 | Supplying and fitting 72mm voltmeter (0-500 V) |
| 24 | Supplying and fitting 72mm ampere meter (0-100 A) |
| 25 | Supplying fitting Big neon light |
| 26 | Supplying & filling of transformer oil up to level mark. |
| 27 | Cost towards thorough overhauling and reassembling at site. |
| 28 | Cost towards S/F change over switch 320A, 415V Make- HPL, Crompton or any reputed make. |
| 29 | renovation of 10 H.P centrifugal pump set (set no. - 01) & repairing of 30 KVA servo controlled automatic voltage stabilizer for rural water supply scheme at Garbandh (clear water) |
| 30 | Cost towards dismantling of 10H.P. induction motor cutting burnt & damaged wire, cleaning all slots and rewinding by super enameled copper wire of original gauge and weight, heating, varnishing, bearing SKF 6302 - 2 Nos all complete with all labour tools and tackles. (wt. of wire- 15.8kg.) |
| 31 | Cost towards dismantling 10 H.P. C/F pump and repairing by changing sleeve 2 nos., necking – 2 nos., rementalling both side of S.S pump shaft, G.M. impeller as per size and sample (weight- 12.5 kg)- 1 no., welding turning, machining and making as per bearing size both side of bearing housing, bearing SKF 6306- 2 Nos., G.M gland tighter- 2 nos., star coupling- 1 no., etc all complete including all labour tool and tackles. (cost after deduction cost of old and damage scrap materials) |
| 32 | Cost towards S/F main switch 100A, 415V including H.R.C. fuse type Make- HPL, Crompton or any reputed make. |
| 33 | Cost towards S/F starter 10 H.P, 415V, relay(13.2-20)A, AC3, 15A, 50HzMake- BCH, L&T or any reputed make. (JSOR 149,M1065). |
| 34 | Cost towards supplying & fitting 6” dia tyre coupling complete set with all accessories. |
| 35 | Cost towards S/F 250 watt sodium vapour lamp with all accessories to illuminate outside of pump chamber & check dam side. |
| 36 | Renovation of 30 KVA servo controlled automatic voltage stabilizer |
| 37 | Disconnecting all electric line & joints & dismantling Power Linemake 30 KVA servo controlled voltage stabiliser for checking defects and removing them with all labour, tools and tackles at site. |
| 38 | Supplying and fitting 3 Kg. operating motor. |
| 39 | Supplying and fitting of variac auto transformer 40 amp. |
| 40 | Supplying and fitting of control card |
| 41 | Supplying and fitting of control transformer |
| 42 | Supplying and fitting 72mm voltmeter (0-500 V) |
| 43 | Supplying and fitting 72mm ampere meter (0-100 A) |
| 44 | Supplying fitting Big neon light |
| 45 | Supplying & filling of transformer oil up to level mark. |
| 46 | Cost towards thorough overhauling and reassembling at site. |
| 47 | Cost towards S/F change over switch 100A, 415V Make- HPL, Crompton or any reputed make. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.