| 1 | Earh Work in Excavation by manual means in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil.1m from cutting edge.lead upto 50mtrs |
| 2 | Providing and lying in position cement concrete 1:5:10 (1 cement:5 fine sand:10) graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level |
| 3 | Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level1: 3: 6: (1: cement 3: coarse sand : 6 graded crushed stone aggregate 20mm nominal size, |
| 4 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Foundation,Footing,Base of Columns etc |
| 5 | Demolishing C.Coc (1:3:6) |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . |
| 7 | P/Applying 12mm thick c.plaster in 1:6c.mortar |
| 8 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete,Cement conc.flooring40mm thick |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree, landing balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding cost of centring, shuttering, finishing and reinforcement. 1:1.5:3 (1 cement: 1.5 coarse sand :3 graded stone aggregates 20mm nominal size) |
| 10 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. |
| 11 | Add cost of Sign Board/PVC Pipe |
| 12 | Carriage of Bajree /Sandwith in av lead of 10km by M.t |