Government Engineering College-GEC has published Supply Of Reinforcement Preheating Furnace ( Powder ) And Control Panel With Data Recording For Stir Casting Furnace Supply Of Reinforcement Preheating Furnace ( Powder ) And Control Panel With Data Recording For Stir Casting Furnace , Reinforcement . Submission Date for this Tender is 25-01-2022. Passenger Lift Tenders in madurai Tamil Nadu. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Reinforcement Preheating Furnace (Powder) and Control Panel with Data Recording for Stir Casting Furnace |
2 | Reinforcement Preheating Furnace (Powder)Chamber Volume: ½ Litre Gate valve opening provision Outer Shell provision: Heating System (Chamber material, heating element material, liner and insulation, K type temperature sensor) Preheater TemperatureforMould: Control Panel with Data Recording for Stir Casting Furnace Display & Control Unit: Indication, Control for recorded parameters Furnace temperature: Melt temperature: Heater Temperature: Pouring Gate valve Control: Mold temperature: Stirrer Speed and Lift: |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail