| 1 | Supplying, Installation and Commissioning of 160 K.V.A Distribution Transformer 11 K.V /0.433K.V ,outdoor type, Synergy/ I power/ Bangala /KEC/ Alstom /any reputed make with off load tap changer – 12.5% + 2.5 in steps of 2.5 as per SIS level-2,copper wound, continuously rated for 3 Ph, 50 Hz, at full load and temp. rise not 45° by thermometer in oil and 50°C by the resistance in winding after continuous run at full load, the transformer should have oil immersed winding having Vector group DY 11 HT side connected in delta and LT side connected in star with neutral brought out connected to provide separate earthing the transformer shall have terminal arrangement, bushing / cable end box on HT side and cable end box on LT side. 2 Nos. channel with stoppers shall be provided and fixed on the provided plinth for mounting the transformer. the transformer should have following standard fittings. Transformer shall be latest manufacturing standard as per amended IS specification and the load & No load losses shall be limited to the value given as per IS 2026 or norms issued by the JSEB or which ever are as – oil conservator with filling hole with cap and plain oil level gauge., silica gel dehydrating breather charged with silica gel ., oil drain valve, oil filter valve, lifting eyes/hooks, two earthing terminal, diagram and rating plate, air vent, explosion vent, 100 m.m dia. Thermometer with thermometer pocket, four bi directional plain roller., testing on full load ,as per I:E rules . |
| 2 | cost of construction of D.P structurewith M.S 33 ft long pole, different type of MS channels& angles and installing 11 K.V AB switch -1 set , Horn gap fuse unit 11 K.V-1 set, Lightning arrestor 11 K.V -3.nos., fasteners &fabrication work required for job, with all required materials, labours, cost of providing disc & Pin insulator for HV and LV side of transformer, etc all complete |
| 3 | Cost of making chemical earthing for transformer-3 nos. (one for neutral and two for body ), as per I:E rules . |
| 4 | Supplying and filling trans former oil of best quality in Transformer. |
| 5 | Cost towardssupplying and laying 120 mm sq 3.5 core aluminum conductor PVC Insulated and PVC sheathed armored cable 1.1 KV grade ISI Marked from transformer to pump housein air /wall / underground as where as required including lugs, etc all complete. Make of cable Gloster/ Polycab /ISI Mark. (Energy deptt. JSOR M 331 & 5.11) |
| 6 | Cost towards supplying all materials, labour, tools and tackles for testing and charging above transformer on load, checking earth fault leakage etc. all complete including technician charge at site. |
| 7 | Cost towards supplying all materials, labour, tools and tackles for transportation, loading and unloading etc. all complete at site. |
| 8 | Supply and fitting 400 amp TPNHRC fuse Type switch fuse unit-1 no on the wall,including required materials such as clamp, nut, bolts, etc, for the job , make – L&T, Havell’s, any Reputed make ISI Marked. |