| 1 | Preparing the Existing surface to laying the road to Proper Gradient and remove the loose soil without damage the Water Supply and other Pipe lines. The Rate inclusive of all charges such as Earth work and remove the same away from the site etc, complete as per standard specifications. |
| 2 | Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. |
| 3 | Providing and laying Prime coatoverWBM / WMM surface using 7kg of Emulsion Bitumen (SS1) per 10 m2 for preperatory to another Bituminous construction over it, including cost of material , labour charges, rental for machinery , fuel and all other incidental charges etc., complete as per clause 502 of MORTH Rev-5 |
| 4 | Providing and layingTack coatoverWBM / WMM surface(treated with primer) using 2.5kg of Emulsion Bitumen (RS1) per 10 m2 for preperatory to another Bituminous construction over it, including cost of material , labour charges, rental for machinery , fuel and all other incidental charges etc., complete as per clause 503 of MORTH Rev-5 |
| 5 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20 kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materilas to CMP site , heating the bitumen and agregates to the required temperature and mixing them in required temparature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to work site , spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sectons and compacted ty Vibratory / Pneumatic roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 CMP with bitumen boiler tipper trucks , Paver finisher , Vibratory / pneumatic rollers and all other tools and plant required , including fuel and all other tools and plant required , including fuel and other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5. |
| 6 | Providing and laying Bituminous Concrete to 40mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 45.27kgs of VG30 bitumen for premixing per 10sqm and 5.03 kg of shreded municipal plastic waste at free of cost including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTHRev-5. |
| 7 | Providingand laying of hot applied thermo plastic compound 2.50 mmthick including all cost and conveyance of all materials and all labour charges complete as per standard specification. |
| 8 | Rising of UGD manhole in renewal of BT road and Cement concrete roads to a depth of 0.15M with necessary centering using M.S. plain sheet with strutting, providing and laying plain cement concrete of mix 1:1 1/2:3 (one cement, two sand, four aggregate)using ISS hard broken granite stone jelly 20mm ISS gauge, supply and fixing of fibre reinforced concrete frame and cover as per type HD 20 IS 12592 part I & II cost including all cost and conveyance of all materials to site and all other costs etc., complete as per standard specifications. |