Department of Higher Education has published Bids Are Invited For Single Bottle Gas Cabinet – Sih4 And Nh3 Designed As Per Simi S2 Standards And Guidelines - As Per Specification , Gas Supply Panels For Flammable Gases – H2, Ch4 With Plc Based Safety Controller Unit Designed As Per Semi S2 Stand. Submission Date for this Tender is 18-01-2022. Tanks and Cylinders Tenders in Lucknow Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Title | Item Description |
1 | Single Bottle Gas Cabinet – SIH4 and NH3 Designed as per SIMI S2 standards and guidelines | as per specification |
2 | Gas Supply Panels for flammable gases – H2, CH4 with PLC based safety controller unit Designed as per SEMI S2 standardsand guidelines | as per specification |
3 | Gas Supply Panels for non-hazardous gases - N2, Ar, N2O, O2, SynAir, He Designed as per SEMI S2 standards and guidelines | as per specification |
4 | Gas scrubber unit for SIH4 and NH3 with N2 dilution system, complete with exhaust system | as per specification |
5 | ¼” SS 316L EP tube – Coaxial and Single Core, With proof of having used in semiconductor sector for above gases, OEM specification shall be submitted as technical bid | as per specification |
6 | ½” SS 316L EP tube, With proof of having used in semiconductor sector for above gases OEM specification shall be submitted as technical bid | as per specification |
7 | ¼” SS 316L tube, With proof of having used in semiconductor sector for above gases, OEM specification shall be submitted as technical bid | as per specification |
8 | ½” SS 316L tube | as per specification |
9 | Tube fittings, VCR glands, Nuts, gaskets | as per specification |
10 | Point of use Gas Sticks for high pure process gases, ¼” Valve + Gas Regulator mounted on a plate, MOC: SS 316L EP | as per specification |
11 | Point of use Gas Sticks for general purity gases, ¼”Valve + Gas Regulator mounted on a plate, MOC: SS 316 L Non EP | as per specification |
12 | Gas Leak Detectors: SIH4, NH3, CH4, H2 and O2 depletion sensors for facility | as per specification |
13 | PLC based Safety control system with Accessories for safety system: Signal cables, Cable tray& accessories | as per specification |
14 | Tube support system, Tube clamps, Tube line tags | as per specification |
15 | Cylinder Holding Structures, complete with brackets, belt and accessories to safely secure the gas bottles. | as per specification |
16 | Exhaust Blower (1000 CFM) and ducting for Gas cabinets and scrubber Exhaust dampers | as per specification |
17 | Smoke Sensors with Alarm Panel | as per specification |
18 | Fire Extinguishers | as per specification |
19 | Cylinder Trolley | as per specification |
20 | Oxygen Depletion Sensors and control system | as per specification |
21 | Cylinder Bank area development with shed and civil foundation | as per specification |
22 | Supply of 10 litres Cylinder for SIH4 and NH3 and 47 Litres Gas Cylinders for all other gases in the project scope | as per specification |
23 | Installation of all gas lines using orbital welding and installation of the equipment | as per specification |
24 | Testing and validation of the complete system, Pressure hold test for all gas lines, Helium leak test for all gas lines | as per specification |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail