Power Boards / Undertakings / PSU Closing in 0 days TDR #30640708

Replacement / Repair Of Damaged Transformers And Electricity Lines Replacement / Repair Of Damaged Transformers And Electricity Lines Under Someshwar Section

Issued by Boards / Undertakings / PSU · someshwar, Uttarakhand
Tender Value
Ref. Documents
Estimated cost
Bid Submission
14 Mar 2022
0 days left
EMD
14700
Bank guarantee accepted
Document Fee
295
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
someshwar → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Replacement / Repair Of Damaged Transformers And Electricity Lines Replacement / Repair Of Damaged Transformers And Electricity Lines Under Someshwar Section

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 12-Jan-2022 Time Extension Date 14-Mar-2022

BOQ

Name of Work: Estimate for damage control during heavy rain and lightening from 18 to 20 october 2021 in Someshwar Section block Takula EDSD I almora under head Disaster Management 2021-22
Sl. No. Item Description
1Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 45 Km ST pole SP 23 (bottomPortion hot Dip)
2Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 45 Km ST pole SP 21 (bottomPortion hot Dip)
3Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 45 Km ST pole SP 10 (bottomPortion hot Dip)
4Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 45 Km 11/0.4 KV 25 KVA New
5Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 45 Km 11/0.4 KV 16 KVA New
6Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 45 Km Small materials
7Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km ST pole SP 23 (bottomPortion hot Dip)
8Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km ST pole SP 21 (bottomPortion hot Dip)
9Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km ST pole SP 10 (bottomPortion hot Dip)
10Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km 11/0.4 KV 25 KVA New (Upto 1 to 3 Km)
11Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km 11/0.4 KV 16 KVA New (upto 1 to 3 Km)
12Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km Small materials (upto 1 to 3 Km)
13Installation/mounting of new T/F in DP structure with fixing of angle/channel and making all HT& LT connections and its complete comissioning 11/0.4 KV 25 KVA New
14Installation/mounting of new T/F in DP structure with fixing of angle/channel and making all HT& LT connections and its complete comissioning 11/0.4 KV 16 KVA New
15Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductorSingle Pole SP 10
16Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductorSingle Pole SP 21
17Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductor11/0.4 KV 25 KVA New
18Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductor11/0.4 KV 16 KVA New
19Excavation of Earth of Pole of Size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil aas directed complete work.
20Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-23.
21Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-21
22Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-10
23Fabrication of Cross Arm with cutting of MS Channel/MS Angle making proper hole as per norms complete
24Grouting of pole in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.45X0.45X1/9 of SP 23/21 Pole
25Muffing of Pole With CC 1:3:6 Block 45cm Height from Ground level Including cost of Ballast,cement & sand Etc.
26Excavation of Earth of Stay of Size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil aas directed complete work.
27Fixing, tightening and nozzaling of stay with pole as per RESPO
28Laying, Resagging & Restringing of L11 KV Line with Rabbit conductor complete including fixing of all accessories including binding and jumperingas per RESPO (3 Ph or 4 wire)
29Laying, Resagging & Restringing of LTLine with ACSR Weasel conductor as Main and Neutralincludinglaying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing LT 3 PH 4 wire Weasel / AB cable
30Laying, Resagging & Restringing of LTLine with ACSR Weasel conductor as Main and Neutralincludinglaying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing LT 1 PH 2 Wire Weasel / AB Cable
31Back Head load cartage of following materials/ old pole from pit site to Dump store ava. Lead distance 1 Km(Upto 1 to 3 Km)
32Motarable cartage of Material from road side dump store to Almora Including Loading & Un-loading both End.Dist 65 Km 11/0.4 KV 25 KVA New
33Motarable cartage of Material from road side dump store to Almora Including Loading & Un-loading both End.Dist 65 Km 11/0.4 KV 16 KVA New
34Motarable cartage of Material from road side dump store to Almora Including Loading & Un-loading both End.Dist 65 Km Small materials

AI Tender Summary

OUR REF NO 30640708
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 14-03-2022
Authority
Authority Name Uttarakhand Power Corporation Limited
Work Description Replacement / Repair Of Damaged Transformers And Electricity Lines Replacement / Repair Of Damaged Transformers And Electricity Lines Under Someshwar Section
Basic Detail
Tender No 80/2021-22/EDD(A)
Bidding Type Tender
Location
City someshwar
State Uttarakhand
Key Dates
Publish Date 12 Jan 2022
Submission Date 14 Mar 2022
Open Date 15 Mar 2022
Finance
Tender Value Ref. Documents
Tender Fee 295
EMD 14700
Exemption Not Available
Document List
d5324a76-6f34-4f47-bdf1-3c466da3dfd9.html
BOQ_49469.xls
TENDERDOCUMENT2.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 12, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 14, 2022
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 14, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 15, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

d5324a76-6f34-4f47-bdf1-3c466da3dfd9.html

xls

BOQ_49469.xls

pdf

TENDERDOCUMENT2.pdf

pdf

Tendernotice_1.pdf