| 1 | Excavation in foundation in ordinary soil (Loam Clay or Sand) including lift upto 1.5m and lead upto 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of the foundation work.(CSI No. 4.01) |
| 2 | Concrete with 4cm gaugestone ballast, coarse sand (F.M. 1.8 to 2.5) & cement in proportion of 12:6:1 in foundations &under floors including supply of all materials, labour and tools and plants etc. required for proper completion. (CSI No. 5.02) |
| 3 | Concreting of 40 mm thick RCC trench covers in mild steel framework with RCC 1:1.5:3 in Cement,Chopan coarse sand(F.M. 1.8 to 2.5) and 2cm gaugegraded hard stone ballast with 3mm thick floating coat of neatcement finish on top of cover complete with all labour, materials and placing the same in proper position at required location of cable trench within the substation area. (CSI No. 5.18) |
| 4 | Cement concrete with 2cm gauge approved hard stone ballast,coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 3:1.5:1including supply of all materials, labour,side shuttering ifrequired and T&P etc. required for proper completion of work(CSI No. 5.21) |
| 5 | First class brick work in 1:4 cement and coarse sand (F.M.1.8 to 2.5)mortar in foundation and plinth including supply of allmaterials, labour & T&P etc. required for proper completion of work (CSI No. 6.03) |
| 6 | TMT/Tor steel in plain work such as reinforced concrete orreinforced brick work (when not included in an over all rates)wrought to required shape as necessary including bending forproper completion of the work and including supply of steel its wastage, bend, hooks and authorized overlapping shall be measured. (Steel shall be arranged by the contractor)(CSI No. 9.03) |
| 7 | Supplyof 25 mm dia.M.S. Anchor bolts (conforming to IS-226) 500 mmlong with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work.(CSI No. 9.14) |
| 8 | Fixing and grouting 25 mm dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) . (CSI No. 9.15) |
| 9 | Providing M.S. Frames work, rack etc for R.C.C. Trench covers and edging with M.S. angles and M.S reinforcement including cutting, bending and welding as per approved drawing. Therate is including cost of all labour, materials etc. as required for proper completion of the work.(CSI No. 9.20) |
| 10 | Fixing and grouting of trench edging in proper level andalignment including cost of all labour, and T&P etc. required forproper completion of the work but excluding cost of C.C. (labour rates only) . (CSI No. 9.30) |
| 11 | Fixing of template in position,level and alignment for grouting of Anchor bolt in auxiliary structure. (labour rate only). (CSI No. 9.32) |
| 12 | Fixing of cable trench racks in proper position and alignment including cost of all labour, material and T&Petc. required for proper completion of the work (Labour rate only).(CSI No. 9.33) |
| 13 | 12 mm thick plaster with cement mortar consisting of one part of cement & four part of coarse sand (1:4), minimum thickness not to be less then 10 mm including supply of all material, labour and T&P etc for proper completion of work. (CSI No. 11.07) |
| 14 | Champering the edge of concrete in auxiliary structure, of size 25 mm wide in triangular section including all materials, labour & T&P etc complete. (CSI No.11.18) |
| 15 | 3 mm thick floating coat of neat cement finish including supply of all materials,labour and T&P etc. required for proper completion of the work.( cement consumption 0.044 bag/Sq.m.) (CSI No. 11.20) |
| 16 | Painting or varnishing new iron work in small areas or new woodwork with one coat of ready mixed priming paint and one coat ofapproved superior quality ready mix paint \"Luxol\" or equivalentbrand or varnish including supply of all materials, labour and T&P etc. required for proper completion of the work. Paint to be used should conform to the I.S. 103-1950.(CSI No. 13.01) |
| 17 | As in item 13.01 above but for every coat after first coat. (CSI No. 13.02) |
| 18 | Painting letters & number over cable trench cover or other places with the help of stencils including painting of base of 150 mm. dia of one coat of primer and two coats of superior quality synthetic enamel paint size of letter to be 60 mm. x 10 mm. including cost of all materials labour and T&P etc. required for proper completion of the work including placing of Trench covers in required position (CSI No. 13.28) |
| 19 | Dismantling brick work or stone work in lime or cement mortar andincluding stacking of materials as directed by theEngineer-in-charge within a distance of 60 metres.(CSI No. 15.01) |
| 20 | Dismantling reinforced cement concrete or reinforced brick work,including stacking of dismantled materials as directed by theEngineer-Incharge within a distance of 60 metres. (CSI No. 15.03) |
| 21 | Dismantling of existing R.C.C. Gantry/ Auxiliary foundation with the help of mechanical means in switchyard including disposal of refuse/ debris as per direction of Engineer - in - charge. Including all labour and T&P etc. required for proper completion of the work. (CSI No. 15.15) |
| 22 | Laying cement concrete road slabconsisting of 1 part cement 2part approved coarse sand and 4 part approved 20mm down graded stone aggregate over prepared sub grade after its rectification and bringing it to proper camber and shape,finishing with TRIMIX machine ,concrete hardner and making good to the satisfaction of E/I inclduing cost of all materials, labour and T&P etc. required for proper completion of the work. (CSI No. 18.12) |