|
| 1 | Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation tenches or ino the plinth and removal and disposal of surplus earth as directed by the engineer in charge upto a disance of 30m fro the foundation trenches. as per S.I No 251 Including labour cess Excluding GST |
| 2 | Sand filling in plinth and under floor including supply ofnecessary quantity of sand from a distance not exceeding 8 Kms. fromthe site of work and including watering, dressing etc. labour and T&P etc. required forproper complition of the work.saplings of girth upto 30 cms. measured at a height of 1 M. above ground leveland removal of rubbish upto a distance of 50 M. out side the periphery of areacleared. including cost of sand. as per S.I No 255a Including labour cess Excluding GST |
| 3 | Cement Concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of 6:3:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. as per S.I No 279b Including labour cess Excluding GST |
| 4 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:2;4 inR.C.C. Raft Fondation excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work includingcost of binding wire. The rate excludes making of drip course which shall be paid extra. as per S.I No 279a Including labour cess Excluding GST |
| 5 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5;3 inR.C.C. Raft Fondation excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work includingcost of binding wire. The rate excludes making of drip course which shall be paid extra. as per S.I No 284a Including labour cess Excluding GST |
| 6 | Mild Steel or iron work of reinforcement in raft,bed block,approach slabs, slabs, etc, wrought to required shape incl-uding cutting , bending & also including cost of necessary reinforcement for proper completionthe work. Including labour cess Excluding GST |
| 7 | M-150 brick workin 1:3 mortar of cement and coarse sand mortar in foundation and plinth including supply of all materials, labour, T&P etc. for proper completion of the work. as per S.I No 307 Including labour cess Excluding GST |
| 8 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 1:4:8 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.as per S.I No 275 Including labour cess Excluding GST |
| 9 | Concrete with 2 cm. gauge Stone ballast, Corse sand of 1.25 F.M. and cement, in proportion of 1:2:4 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. as per S.I No 279 Including labour cess Excluding GST |
| 10 | Struck pointing with cement mortar consisting of 1 part cement and 2 parts of fine sand of 1.25 Fineness modulus. as per S.I No 578 Including labour cess Excluding GST |
| 11 | Dismantling sundries brick work including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet). as per S.I No 692 Including labour cess Excluding GST |
| 12 | Dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet). as per S.I No 694 Including labour cess Excluding GST |
| 13 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Including labour cess Excluding GST |
| 14 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401. Including labour cess Excluding GST |
| 15 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405 (By Machinary Means) Including labour cess Excluding GST |
| 16 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 (By Machinary Means) Including labour cess Excluding GST |
| 17 | Providing and applying primer coat of Low Porosity with Bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at rate of 0.60 Kg/Sqm using mechanical means as per Technical Specification Clause 502.Including labour cess & Bitumin, Excluding GST |
| 18 | Providing and applying tack coat with Bitumen VG-10 gradeusing emusion pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. Including labour cess & Bitumin, Excluding GST |
| 19 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using 80/100 Grade Bitumenbitumen to required line, grade and level to serve as wearing course on a previously prepared base by manualMORD Specifications 508. Including labour cess & Bitumin, Excluding GST |
| 20 | Providing and laying seal coat by manual means with 80/100 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510.Including labour cess & Bitumin, Excluding GST |
| 21 | M-150 Brick on edge pavement on parties with bricks, laid dry joints filled with local sand including preparation of base to proper slope, and its ramming, spreading layer of 1 cm. (3/8\") depth of local sand over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completion of the work. Including labour cess , Excluding GST |
| 22 | Laying & fixing of 1000mm dia NP3 pipe |