Supply, Installation, Testing, Commissioning And Five Year Operation And Maintenance Of Power Transformer Along With Allied Electrical Equipments Of 33Kv Electrical Power Distribution Sub-Station For 40Mgd Capacity Wtp And Cwps-2 Supply, Delivery At Site And Storage Of 4 Panel, 550 Mva, 33Kv, Indoor Type H.T. Vacuum Circuit Breaker As Per Specification With All Sorts Of Required Inter Connections. 3 Supply, Delivery At Site And Storage Of 7500 Kva, 33 Kv / 6.6 Kv Onan Indoor Type Transformer With Neutral Brought Out As Per Technical Specifications And All Accessories Complete. 4 Supply, Delivery At Site And Storage Of Icog Panel, 350 Mva, 6.6 Kv, Indoor Type H.T. Vacuum Circuit Breaker As Per Specification With All Inter Connection. 5 Supply, Delivery At Site And Storage Of 110 V, 100Ah Battery Bank Comprising Of55 Nos Sealed Maintenance Free Cell Each With 2 Volts With Float And Boost Charger Cum Dcdb. 6 Supply, Delivery At Site And Storage Of Control Desk For Remote Operation Of Both 33 And 6.6Kv Panels ( As Required ) With All Controls, Indication And Annunciation Complete As Per Specification. 7 Supply, Delivery At Site And Storage Of Mv Pdb At 33 / 6.6Kv Sub-Station With 2 Nos 250A I / C And All The Required Feeders, Bc, Wiring, Instrumentation Etc, All Complete As Per Directions Of The Eic And Specification. 8 Supply, Delivery At Site And Storage Ofrequired H.T., M.V. & Control Cable As Per Specifications & As Follows: 9 I ) H.T. Cables 10 From Cesc’S Summation Panel To Incoming Panel Of 33Kv Ht Switch Gear Of 33 Kv Grade, 300 Sq Mm Dia, Al Conductor, Xlpe Insulated, Armoured Cable As Per Specifications. 11 From 33Kv Ht Switchgear To Primary Side Terminal Of 7500 Kva, 33Kv / 6.6Kv Transformer Of 33 Kv Grade, 300 Sq Mmdia, Al Conductor, Xlpe Insulated, Armoured Cable As Per Specifications. 12 Fromsecondary Side Terminal Of 7500 Kva, 33Kv / 6.6Kv Transformer To 6.6Kv Icog Panel Of 11 Kv Grade, 300 Sq Mm Dia, Al Conductor, Xlpe Insulated, Armoured Cable As Per Specifications. 13 From 6.6Kv Icog Panel To Incomers Of 6.6Kv Mcc Panel At Cwphof 11 Kv Grade, 300 Sq Mm Dia, Al Conductor, Xlpe Insulated, Armoured Cable As Per Specifications. 14 Ii ) M.V. Cables 15 From Battery Charger And / Or Dcdb To All The Required Panels And Battery Bank At 33 / 6.6Kv Sub Station Of 1.1 Kv Grade, 3 C X 16 Sq Mm Stranded Cu. Conductor, Xlpe Insulated Armoured Cable. 16 From Existing 6.6Kv / 430V Sub-Station Tomv Panel At 33 / 6.6Kv Sub-Station Of 1.1 Kv Grade, 3 And 1 / 2Core 300Sq Mm Al Conductor, Xlpe Insulated Armoured Cable. 17 From Mv Panel At 33 / 6.6Kv Sub-Station To Battery Charger At 33 / 6.6Kv Sub-Station Of 1.1 Kv Grade, 3 And 1 / 2Core 150Sq Mm Al Conductor, Xlpe Insulated Armoured Cable. 18 From Mv Panel At 33 / 6.6Kv Sub-Station To Ht Switchgears Of 1.1 Kv Grade 3 C X 2.5 Sq Mm Stranded Cu. Conductor, Xlpe Insulated Armoured Cable. 19 Iii ) Control Cable 20 Stranded Copper Conductor Of Various Ratings, Sizes And Lengths As Per Specification, Requirement And Direction Of The Eic For All Control Circuits And Interlocking Circuits At 33 / 6.6Kv Sub-Station Including Control Desk. 21 Supply, Delivery At Site And Storage Of All The Required Jointing Materials As Per Specification, Site-Condition & As Follows: 22 All H.T Cables Jointing Materials ( Dry Type, Heat Shrink Joint ) 23 All Mv Cables Jointing Materials For Different Cross Sections ( Dry Type ) 24 All Copper Control& Power Cables Jointing Materials For Different Cross Sections ( Dry Type ) . 25 Supply & Delivery At Site And Storage Of All The Required Earthing Equipments And Materials As Per Specification And All The Other Equipments Required To Comply With Latest I.E. Rules. 26 Supply, Delivery At Site And Storage Of Fire Extinguishers As Follows: 27 A-B-C Type ( 5 Kg Each ) 28 Co2 Type ( 4.5 Kgeach ) 29 Supply & Delivery At Site And Storage Of All The Misc. Items Like Rubber Mats, Shock Treatment Chart, Danger Boards, Sand Buckets, Glow Sign Boards, Gamboots, Hand Gloves Etc. As Per Specification And Requirements. 30 Supply & Delivery At Site And Storage Of All Required Wiring Materials, Luminaries, Fittings, And Fixtures Complete With Necessary Multi-Stranded Copper Wires For Inside Lighting, All Sorts Of Fans Etc At 33 / 6.6Kv Sub-Station As Per Specification. 31 Supply & Delivery At Site And Storage Of All Sorts Of Materils And Equipments For Required Lightning Arrestors Along With Earth Strip And Earth Electrodes All Complete As Per Specification And All Other Equipments Required To Comply With Latest I.E. Rules. 32 Supply & Delivery At Site And Storage Of Spare Parts As Per Specifications. 33 Part – B ( Installation And Commissioning Part ) 34 Installation And Commissioning At Site Of 4 Panel, 550 Mva, 33Kv, Indoor Type H.T. Vacuum Circuit Breaker As Per Specification With All Inter Connections And Interfacing. 35 Installation And Commissioning At Site Of 7500 Kva, 33 Kv / 6.6 Kv Onan Indoor Type Transformers With Neutral Brought Out As Per Technical Specifications And All Accessories Complete. 36 Installation And Commissioning At Site Of Icog Panel, 350 Mva, 6.6 Kv, Indoor Type H.T. Vacuum Circuit Breaker As Per Specification With All Inter Connections. 37 Installation And Commissioning At Site Of 110 V, 100Ah Battery Bank Comprising Of 55Nos Sealed Maintenance Free Cell Each With 2 Voltswith Float And Boost Charger Cum Dcdb. 38 Installation And Commissioning At Site Of Control Desk For Remote Operation Of Both 33Kv And 6.6Kv Panels With All Controls, Indication And Annunciation Complete As Per Specification. 39 Installation And Commissioning At Siteof Mv Pdb At 33 / 6.6Kv Sub-Station With 2 Nos 250A I / C And All The Required Feeders, Bc, Wiring, Instrumentation Etc, All Complete As Per Directions Of The Eic And Specification. 40 Installation / Laying At Site And Commissioning Of H.T., M.V. & Control Cable As Per Specification & As Follows 41 I ) H.T. Cable 42 From Cesc’S Summation Panel To Incoming Panel Of 33Kv Ht Switch Gear Of 33 Kv Grade, 300 Sq Mm Dia, Al Conductor, Xlpe Insulated, Armoured Cable As Per Specifications. 43 From 33Kv Ht Switchgear To Primary Side Terminal Of 7500 Kva, 33Kv / 6.6Kv Transformer Of 33 Kv Grade, 300 Sq Mmdia, Al Conductor, Xlpe Insulated, Armoured Cable As Per Specifications. 44 Fromsecondary Side Terminal Of 7500 Kva, 33Kv / 6.6Kv Transformer To 6.6Kv Icog Panel Of 11 Kv Grade, 300 Sq Mm Dia, Al Conductor, Xlpe Insulated, Armoured Cable As Per Specifications. 45 From 6.6Kv Icog Panel To Incomers Of 6.6Kv Mcc Panel At Cwphof 11 Kv Grade, 300 Sq Mm Dia, Al Conductor, Xlpe Insulated, Armoured Cable As Per Specifications. 46 Ii ) M.V. Cables 47 From Battery Charger And / Or Dcdb To All The Required Panels And Battery Bank At 33 / 6.6Kv Sub Station Of 1.1 Kv Grade, 3 C X 16 Sq Mm Stranded Cu. Conductor, Xlpe Insulated Armoured Cable. 48 From Existing 6.6Kv / 430V Sub-Station Tomv Panel At 33 / 6.6Kv Sub-Station Of 1.1 Kv Grade, 3 And 1 / 2Core 300Sq Mm Al Conductor, Xlpe Insulated Armoured Cable. 49 From Mv Panel At 33 / 6.6Kv Sub-Station To Battery Charger At 33 / 6.6Kv Sub-Station Of 1.1 Kv Grade, 3 And 1 / 2Core 150Sq Mm Al Conductor, Xlpe Insulated Armoured Cable. 50 From Mv Panel At 33 / 6.6Kv Sub-Station To Ht Switchgears Of 1.1 Kv Grade 3 C X 2.5 Sq Mm Stranded Cu. Conductor, Xlpe Insulated Armoured Cable. 51 Iii ) Control Cable 52 Stranded Copper Conductor Of Various Ratings, Sizes And Lengths As Per Specification, Requirement And Direction Of The Eic For All Control Circuits And Interlocking Circuits At 33 / 6.6Kv Sub-Station Including Control Desk. 53 Iii ) Control Cable 54 Stranded Copper Conductor Of Various Ratings, Sizes And Lengths As Per Specification, Requirement And Direction Of The Eic For All Control Circuits And Interlocking Circuits At 33 / 6.6Kv Sub-Station Including Control Desk. 55 Iii ) Control Cable 56 Stranded Copper Conductor Of Various Ratings, Sizes And Lengths As Per Specification, Requirement And Direction Of The Eic For All Control Circuits And Interlocking Circuits At 33 / 6.6Kv Sub-Station Including Control Desk. 57 Installation And Commissioning At Site Of Jointing Materials As Per Specification & As Follows: 58 All H.T Cables Jointing Materials ( Dry Type, Heat Shrink Joint ) 59 All Mv Cables Jointing Materials For Different Cross Sections ( Dry Type ) 60 All Copper Control& Power Cables Jointing Materials For Different Cross Sections ( Dry Type ) 61 Installation And Commissioning At Site Of All The Required Earthing Equipments And Materials As Per Specification And All The Other Equipments Required To Comply With Latest I.E. Rules. 62 Installation And Commissioning At Site Of Fire Extinguishers As Follows: 63 A-B-C Type ( 5 Kg Each ) 64 Co2 Type ( 4.5 Kgeach ) 65 Installation And Commissioning At Site Of Misc. Items Like Rubber Mats, Shock Treatment Chart, Danger Boards, Sand Buckets, Glow Sign Boards, Etc. As Per Specification. 66 Installation And Commissioning At Site Of All Lrequired Wiring Materials, Uminaries, Fittings, And Fixtures Complete With Necessary Multi-Strand Copper Wires For Inside Lighting, All Sorts Of Fans Etc At 33 / 6.6Kv Sub-Station As Per Specification. 67 Installation And Commissioning At Site Of All Sorts Of Materials And Equipments For Required Lightning Arrestor Along With Earth Strip And Earth Electrodes All Complete As Per Specification And All Other Equipment Required To Comply With Latest I.E. Rules. 68 Carrying Out Required Heat Run Of Ht & Mv Equipments, Materials, Dehydration Of Transformer Oil On Requirement And Making Ready All Ht / Mv Equipments, Materils For All Statutory High / Medium Pressure Testings As Per Latest I. E. Rules. 69 Carrying Out All The Required Statutory High Pressure Tests On All Ht Equipment / Materials & Medium Pressure Tests On Mv Equipments As Per Specifications Including All Sorts Of Charges Required For Getting Clearances From All The Required Govt. Dep [ Artments / Inspectors As Per Latest Rules And Norms. 70 Charges For Required Diesel Generator Sets / Temporary Power Connections From Cesc For Construction / Insttallation Purposes. 71 Testing The Whole Installation And Submission Of All Required Test Reports As Per Specifications & Direction Of Eic. 72 Synchronizing And Commissioning The Whole Installationincluding Trial Run For 72 Hours On-Load Operation As Per Specifications And Direction & Satisfactions Of The Eic. 73 Operation & Maintenance Of All The Equipments, Appliances, Materials, Instruments Etc Installedpertaing To The 33 / 6.6Kv Sub-Station Providing Adequate Number Of Working Personnel ( All Required Category ) For Round The Clock Operation And Maintenance Supplying All Sorts Of Consumablesas Per Requirement And As Per Specifications & Directions Of The Eic.