|
| 1 | Construction of granular sub-base by providing wellgraded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (Grade-II) (Ref. to MORD Specification No.401) |
| 2 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 3 | Construction of un-reinforced, jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per disign, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 (1:1½:3) coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels. rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints as per norms, applying debonding strips primer, sealant,near approaches to bridge/ culvert and construction, joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 including Cost of Polythene Sheet and also including complete shifting of matrials & Concrete etc. |
| 4 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50M. and lead upto 30M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I upto adistance of 30 M. from the foundation trenches. As per SI No. 251A |
| 5 | Cement Concrete with 4 cm. guage approved stone ballast, coarse sand & cement in the proportion of 6:3:1 including supply of all materials, labour, Tools &plants etc. required for proper completion of the work. As per SI No. 281 |
| 6 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 inlintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work includingcost of binding wire. The rate excludes making of drip course which shall be paid extra. SI No 284(A) |
| 7 | M.S.(tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks and authorised overlapping shall be measured and including cost of binding wire.Asper SiNo.504 |
| 8 | Supply & laying of 80mm thick Precast cement concerete I-Shape\" Interlocking paver blocks ISI markconfirming to IS: 15658-2006 with top layer of minimum 5 mm thicknesshaving plan dimension 200x(160+120mm) of O.P. Cement , smooth high gloss finish, skid resistant; manufactured from rubber moulds through vibro-compression mechanism. The compressive strength of concrete paver block shall not be less than 50Mpaand weight 5 kg perincluding cost of material, with a blanket layer of 4.00cm. thick fine sand. includinglabour, T & Petc required for proper completion of the work as directed by Engineer-in-charge. Taking 40% new tiles New Item - 14 |