Supply Of Electrical Equipments 2022 -1 Dual Channel 30 V, 2 A Continuously Variable Dc Regulated Power Supply With Current And Overload Protection 2 Single Phase Transformer 230 / 230V, 2Kva With Standard Tappings On Primary And Secondary Windings
Tender Overview
Project Description
Supply Of Electrical Equipments 2022 -1 Dual Channel 30 V, 2 A Continuously Variable Dc Regulated Power Supply With Current And Overload Protection 2 Single Phase Transformer 230 / 230V, 2Kva With Standard Tappings On Primary And Secondary Windings 3 Portable Moving Coil Analog Dc Voltmeters A ) 0 - 1 V B ) 0 - 10 V C ) 0 - 30 V 4 Dc Digital Voltmeters A ) 0 - 1 V B ) 0 - 10 V C ) 0 - 30 V 5 Portable Moving Iron Ac Voltmeters A ) 0 - 300 V B ) 0 - 600 V 6 Portable Moving Coil Dc Ammeters A ) 0 - 100 Ma B ) 0 - 1 A C ) 0 - 2 A 7 Portable Moving Iron Analog Ac Ammeters A ) 0 - 2 A B ) 0 - 5 A C ) 0 - 10 A 8 Portable Digital Ac Ammeters A ) 0 - 2 A B ) 0 - 5 A C ) 0 - 10 A 9 Watt-Meters A ) 150 / 300V, 2 A, Upf B ) 300 / 600 V, 5 / 10 A, Lpf For Measurent Of Low Pf For Inductive Load 10 Rheostats – 25 Ohms, 50 Ohms, 150 Ohms, 220 Ohms ( All Rated At 3 A ) 11 Rheostat Loads – 1 Kw, 230 V 12 Soldering Iron 60 W 13 Single Phase Energy Meter 10 A, 230 V, 50 Hz, Digital Type 14 Multi-Meter Digital ¾” 15 Dual Trace Oscilloscope – 30 Mhz Operating Modes: Channel 1, Channel 2, Channel 1 & 2 Alternate Or Chopped ( Approximately 350Khz ) , X - Y ( Ratio 1:1 Input Via Ch2 ) , Add / Sub Ch1± Ch2, Invert Ch2 Rise Time: 12Ns ( Approximately ) . Vertical Deflection ( Y ) : ( Identical Channels ) Bandwidth: Dc - 30Mhz ( -3Db ) .Maximum Input Voltage: 400V ( Dc+ Peak Ac ) . Sensitivity: Internal 5Mm, External 0.8V ( Approximately ) .Power Consumption: 45Va Display: 8 X 10Cm Trace Rotation: Adjustable On Front Panel Calibrator: Square Wave Generator 1Khz ( Approximately ) , 0.2Vpp ± 1% For Probe Compensationdeflection Coefficients: Micro-Controller Based 12 Calibrated Steps 5 Mv / Div–20 V / Div ( 1-2-5 Sequence ) . Electronic Control Display On 32 Character Backlit Alphanumeric Lcd. Accuracy: ± 3% Input Impedance: 1M | | 30Pf ( Approximately ) 16 Three Phase Induction Motors :1 Hp – 440 V 50 Hz. 17 Three Phase Induction Motors :2 Hp – 440 V 50 Hz. 18 Three Phase Dol Starter - 440V, ----Suitable For 1Hp Or 2 Hp Motor 19 Star-Delta Starter 3 Phase-440V, 3 Phase, 0- 440V----Suitable For 1Hp Or 2 Hp Motor 20 Auto Transformer Starter 3 Phase, 0- 440V----Suitable For 1Hp Or 2 Hp Motor 21 Ups 1Kvatechnology:True On-Line Ups With Double Conversion Technology Rectifier & Inverter Both Be Igbt Based Power Rating 1000Va / 800W Input Voltage & Range 160-280 Vac @100% Load Input Freq. Range 45Hz ~ 55 Hz Input Power Factor >=0.95 Output Voltage Range 220 / 230 / 240 Vac ±3% Protection Internal / External Transient Voltage Surge Suppressor At I / P Of Ups Transient Response :Less Or Equal To 3% For 100% Nonlinear Load ( Battery Mode ) Led Display Ups Status, Load Level, Battery Level, I / P O / P Voltage, Discharge Timer And Fault Conditions Trigger System: Modes: Auto / Level Source: Ch1, Ch2, Alt Ch1 / Ch2, External. Slope: Positive Or Negative Coupling: Ac 22 Battery Lead-Acid Type, 140 A-Hr And Hydrometers 23 Meggar Hand Driven, 1000V, 1000 Mω 24 Digital I C Trainer Kit, 5V 1A Fixed Dc, ± 12V Fixed Dc, O / P Current 1A, Regulation ±0.1% Fixed & Variable Clock Generator 25 Function Generator 9Khz- 3Ghz, Frequency Resolution 0.1 Hz, Reverse Power Protection 2Watt, Minimum Output Level -120 Dbm Maximum Output Level +13 Dbm 26 Wooden Wiring Board ( 2X3 ) Ft 27 Single Phase Resistive Load 10A Variable In Steps Of 1A 28 Electronic Components A ) Step Down Transformer 230 / 24 V, 12 Ma B ) Relays – Solid State Sugar Cube Type, Spst, Coil 6V, Power Circuit 230 V, 5 A. C ) Bread Boards D ) Tag Boards. 29 Proximity Sensor Test Kit / 30 Simple Panel Board / Cubical Consisting Of Bus-Bars, Cb / Mcb / Elcb, Meters, Hrc Fuses, Magnetic Contactors, Cables, Earthing Points.
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed