| 1 | The work of ERECTION OF 11 KV HT LINES on 8.5/11/13 Mtr. PCC/STP Poles with ACSR Weasel/Raccon/XLPE Conductors for giving connections to 33 No. Centres (Pump House/Intekwell) of \"JAL JIVAN MISHAN\" under NAMAMI GANGE PROJECT of KHATAN PAYJAL YOJANA at various places/villages as BEERA (PUMP HOUSE NO. 01), AUDAHA (PUMP HOUSE NO. 02), PACHAUHAN (PUMP HOUSE NO. 03), BENAMAU (PUMP HOUSE NO. 04), KAMASIN (PUMP HOUSE NO. 06) (KAMASIN), ANDAULI (PUMP HOUSE NO. 07) (KAMASIN), BAMHRAULA SANI (PUMP HOUSE NO. 08), JAMU (PUMP HOUSE NO. 10), MANJHIWA SANI (PUMP HOUSE NO. 12) (KAMASIN), JAROHARA (PUMP HOUSE NO. 11) (BISANDA), SAHPUR SANI (PUMP HOUSE NO. 13) (BISANDA), BAGHA (PUMP HOUSE NO. 14) (BISANDA), LAULITIKAMAU (PUMP HOUSE NO. 15) (BISANDA), SIKLODHI (PUMP HOUSE NO. 16) (BISANDA), AAU (PUMP HOUSE NO. 17) (NARAINI), BILGAON (PUMP HOUSE NO. 18) (MAHUA), NANDANMAU (PUMP HOUSE NO. 19) (BISANDA), CHAUSAD (PUMP HOUSE NO. 21) (BISANDA), TARSUMA (PUMP HOUSE NO. 23) (NARAINI), JABRAPUR (PUMP HOUSE NO. 24) (NARAINI), JABRAPUR (PUMP HOUSE NO. 25) (NARAINI), CHHITAINI (PUMP HOUSE NO. 26) (NARAINI), GOREMAU (PUMP HOUSE NO. 27) (NARAINI), BARUA-SYODHA (PUMP HOUSE NO. 29) (NARAINI), MASAUNI BHARATPUR (PUMP HOUSE NO. 31) (NARAINI), MUKERA (PUMP HOUSE NO. 32) (NARAINI), KARTAL (PUMP HOUSE NO. 34) (NARAINI), ANATHUWA (PUMP HOUSE NO. 35) (MAHUA), BANDE (PUMP HOUSE NO. 36) (MAHUA), SYONTA-SYODHA (PUMP HOUSE NO. 37) (MAHUA), MIRJAPUR (PUMP HOUSE NO. 38) (MAHUA), BANSI (PUMP HOUSE NO. 39) (NARAINI), NAUHAI (PUMP HOUSE NO. 40) (NARAINI) etc. under FULL DEPOSIT SCHEME Year 2021-22 under EDD, BANDA/ATARRA, including the work of cartage of new line material from store to work site, details of the work as given below :- |
| 2 | Safe cartage of 8.5 Mtr. long PCC poles from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging. |
| 3 | Safe cartage of 11 Mtr. long STP poles from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging. |
| 4 | Safe cartage of 13 Mtr. long STP poles from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging. |
| 5 | Safe cartage of line material viz. conductor, cable, GI earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging. |
| 6 | Erection of single support on 8.5 Mtr. PCC poles, including complete H.T./L.T. fittings as per direction of Engineer incharge/RESSPO manual. |
| 7 | Concreting/grouting of single support on 8.5 Mtr. PCC poles. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each),including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge. |
| 8 | Erection of single support on 11 Mtr. STP poles, including complete H.T./L.T. fittings as per direction of Engineer incharge/RESSPO manual. |
| 9 | Concreting/grouting of single support on 11 Mtr. STP poles. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each),including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge. |
| 10 | Erection of single support on 13 Mtr. STP poles, including complete H.T./L.T. fittings as per direction of Engineer incharge/RESSPO manual. |
| 11 | Concreting/grouting of single support on 13 Mtr. STP poles. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each),including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge. |
| 12 | Erection of double pole structure on 8.5 Mtr. PCC poles, including complete H.T./L.T. fittings as per direction of Engineer incharge/RESSPO manual. |
| 13 | Concreting/grouting of double pole structure on 8.5 Mtr. PCC poles. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each),including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge. |
| 14 | Erection of double pole structure on 11 Mtr. STP poles, including complete H.T./L.T. fittings as per direction of Engineer incharge/RESSPO manual. |
| 15 | Concreting/grouting of double pole structure on 11 Mtr. STP poles. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each),including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge. |
| 16 | Erection of four pole structure on 11 Mtr. STP poles, including complete H.T./L.T. fittings as per direction of Engineer incharge/RESSPO manual. |
| 17 | Concreting/grouting of four pole structure on 11 Mtr. STP poles. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each),including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement & direction of enginner incharge. |
| 18 | Erection and grouting of stay set including the work of nozelling etc. as per RESSPO manual and also including the cost of all grouting material. |
| 19 | Fixing of earthing rod as per direction of supervising engineer/RESSPO manual. including the cost of labour,T&P etc. required for proper completion of work. |
| 20 | Laying, sagging, stringing, binding and jumpering of new ACSR Weasel Conductor on the erected poles as per direction of supervising engineer/RESSPO manual. |
| 21 | Laying, sagging, stringing, binding and jumpering of new ACSR Raccon Conductor on the erected poles as per direction of supervising engineer/RESSPO manual. |
| 22 | Laying, stringing, binding and termination etc. of XLPE Cable of size 3x70 Sq.mm. on the newly erected line as per direction of supervising engineer/RESSPO manual. |
| 23 | Laying, stringing, binding and termination etc. of XLPE Cable of size 3x120 Sq.mm. on the newly erected line as per direction of supervising engineer/RESSPO manual. |
| 24 | Laying, stringing, binding and termination etc. of XLPE Cable of size 3x185 Sq.mm. on the newly erected line as per direction of supervising engineer/RESSPO manual. |
| 25 | Fixing of T-Off channel with fitting of all accessories as per RESSPO manual. |
| 26 | Fixing & installation of O/G VCB panel 200/100/5A with fitting of all accessories as per RESSPO manual, including transportation of it\"s. |
| 27 | Filling & Fixing of I/D & O/D cable jointing kit with fitting of all accessories as per RESSPO manual, including transportation of it\"s. |
| 28 | Fixing & installation of 11 KV Pilfer Proof Metering Cubicle with fitting of all accessories as per RESSPO manual, including transportation of it\"s. |
| 29 | Fixing & installation of CT/PT Combind Unit with fitting of all accessories as per RESSPO manual, including transportation of it\"s. |
| 30 | Fixing & installation of 3 Phase 4 Wire Static TVM Meter 11 KV with fitting of all accessories as per RESSPO manual, including transportation of it\"s. |
| 31 | Fixing & installation of 11 KV TPMO set with fitting of all accessories as per RESSPO manual, including transportation of it\"s. |
| 32 | Fixing & installation of 11 KV Fuse set for TPMO with fitting of all accessories as per RESSPO manual, including transportation of it\"s. |
| 33 | Fixing of 11 KV Gaurding angle with fitting of all accessories as per RESSPO manual. |
| 34 | Fixing of G.I. wire with fitting of all accessories as per RESSPO manual. |
| 35 | Fixing of G.I. barbed wire with fitting of all accessories as per RESSPO manual. |
| 36 | Fixing of binding wire with fitting of all accessories as per RESSPO manual. |
| 37 | Fixing of cross bracing angle with fitting of all accessories as per RESSPO manual. |
| 38 | Fixing of extra for road crossing guarding with fitting of all accessories as per RESSPO manual. |
| 39 | Fixing & installation of 24 Volt Battery Invertor with fitting of all accessories as per RESSPO manual, including transportation of it\"s. |
| 40 | Fixing & installation of G.I. Pipe 6\" Dia with fitting of all accessories as per RESSPO manual, including transportation of it\"s. |